Welcome Guest ( Log In | Register )

Outline · [ Standard ] · Linear+

> Ultimate Sg Buloh-Kajang MRT construction thread

views
     
pobox
post Jan 9 2014, 03:59 PM

On my way
****
Junior Member
551 posts

Joined: May 2013


QUOTE(davkong @ Jan 9 2014, 02:19 PM)
» Click to show Spoiler - click again to hide... «
Good job MRTCorp.

Means the drilling from maluri to pasar rakyat is done?
pobox
post Dec 30 2014, 07:02 PM

On my way
****
Junior Member
551 posts

Joined: May 2013


Kampung2005

Want to ask you about the construction at Leisure Mall Station. Why is there a parallel track build on the EcoCheras side?
pobox
post Dec 31 2014, 04:12 PM

On my way
****
Junior Member
551 posts

Joined: May 2013


QUOTE(Kampung2005 @ Dec 31 2014, 04:10 PM)
That could be the siding for trains.
*
Like the LRT track @ University Station? Of which we can always see a stationed coach on the track?
pobox
post Dec 31 2014, 04:17 PM

On my way
****
Junior Member
551 posts

Joined: May 2013


TQ Kampung2005. You are THE ambassador of public transportation.

Bump Topic Add ReplyOptions New Topic
 

Change to:
| Lo-Fi Version
0.0204sec    0.82    7 queries    GZIP Disabled
Time is now: 18th December 2025 - 09:45 PM