QUOTE(Kampung2005 @ Jan 21 2014, 10:50 PM)
oh okay thanks for info.
Ultimate Sg Buloh-Kajang MRT construction thread
Ultimate Sg Buloh-Kajang MRT construction thread
|
|
Jan 21 2014, 10:54 PM
|
![]() ![]() ![]() ![]()
Senior Member
540 posts Joined: Mar 2008 |
|
|
|
Jan 21 2014, 10:58 PM
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
|
|
|
Jan 21 2014, 11:02 PM
|
![]() ![]()
Junior Member
176 posts Joined: Apr 2013 |
QUOTE(Kampung2005 @ Jan 21 2014, 10:58 PM) Sungai Buloh-Kajang = 88 minutes wow, that's faster than I thought it would be. |
|
|
Jan 22 2014, 03:24 PM
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
|
|
|
Jan 28 2014, 03:44 PM
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
http://www.thestar.com.my/News/Community/2...-are-anxiously/
Jalan Sungai Buloh ![]() Cochrane-Pasar Rakyat ![]() KL Sentral station ![]() |
|
|
Jan 29 2014, 04:42 PM
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
Seksyen 16 (Photo by kaytee of SSC)
![]() |
|
|
Feb 1 2014, 06:02 PM
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
1 Utama
![]() ![]() ![]() |
|
|
Feb 3 2014, 01:02 AM
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,831 posts Joined: Dec 2009 |
+1
|
|
|
Feb 4 2014, 09:30 AM
|
![]()
Junior Member
22 posts Joined: Mar 2012 |
![]() this is how MRT Station at Muzium Negara link to KL Sentral |
|
|
Feb 4 2014, 09:37 AM
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
|
|
|
Feb 4 2014, 09:40 AM
|
![]() ![]() ![]() ![]()
Senior Member
624 posts Joined: Jan 2003 |
hi folks,
withoutgoing through all teh pages....can anyone enlighten me when this whole project will complete? coz teh jam in cheras is driving me nuts..thanks |
|
|
Feb 4 2014, 09:43 AM
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
|
|
|
Feb 4 2014, 09:46 AM
|
![]() ![]() ![]() ![]()
Senior Member
624 posts Joined: Jan 2003 |
|
|
|
Feb 4 2014, 10:06 PM
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
|
|
|
Feb 4 2014, 10:09 PM
|
![]() ![]()
Junior Member
183 posts Joined: Dec 2012 |
Progress in kajang town is taking place Shape but imo slower than the rest of the section..
|
|
|
Feb 5 2014, 12:48 PM
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
December 2013 update by MRT Corp
http://mymrt.com.my/en/project-updates Sungai Buloh MRT piers being constructed near the Sungai Buloh KTM Station. ![]() ![]() Construction of the multistorey park and ride taking place next to the Sungai Buloh KTM Station. ![]() ![]() ![]() View of the temporary car park for the Sungai Buloh KTM Station. The original car park had to be closed to make way for the construction of the Sungai Buloh MRT Station. ![]() |
|
|
Feb 5 2014, 12:53 PM
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
December 2013 update by MRT Corp
http://mymrt.com.my/en/project-updates Jalan Sungai Buloh-Subang, Kampung Baru Sungai Buloh MRT construction work being carried out along Jalan Sungai Buloh-Subang. ![]() MRT construction work taking place on both sides along Jalan Sungai Buloh-Subang. ![]() MRT construction work taking place along Jalan Sungai Buloh-Subang. ![]() ![]() |
|
|
Feb 5 2014, 01:03 PM
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
December 2013 update by MRT Corp
http://mymrt.com.my/en/project-updates Sungai Buloh depot Aerial view of the depot. ![]() View of construction work for the rolling stock maintenance building (left), pedestrian bridge (right front), and stabling yard (right behind). The white strip to the left is sub-ballast work for tracks. ![]() Sub-ballast works for tracks in front of the rolling stock maintenance building. ![]() View of the rolling stock maintenance office (left), infrastructure building (right, back) and the administrative building cum operations, control centre (right front). ![]() Aerial view of the stabling yard, where the roof is being constructed. ![]() View of Pedestrian Bridge 3 with the direct current rectifier building behind it under construction ![]() Concreting works for the base slab for train maintenance facilities in progress. ![]() Construction of the buffer stop for the locomotive maintenance shed. ![]() Track maintenance pit inside the rolling stock workshop building being constructed. ![]() Construction for the track slab and bogie turntable being carried out inside the rolling stock workshop building. ![]() |
|
|
Feb 5 2014, 01:11 PM
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
December 2013 update by MRT Corp
http://mymrt.com.my/en/project-updates Jalan Sungai Buloh-Subang Launch gantry (blue structure) building the MRT viaduct from the entrance of the Sungai Buloh Depot. ![]() ![]() ![]() Launch gantry (blue structure) lifting segmented box girders to build the MRT viaduct. ![]() Piers for the MRT guideway and station coming up inside the Rubber Research Institute. ![]() Piers for the MRT station coming up inside the Rubber Research Institute. ![]() Concreting works are carried out at the future MRT station site. ![]() Pile cap construction ![]() |
|
|
Feb 5 2014, 01:27 PM
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
December 2013 update by MRT Corp
http://mymrt.com.my/en/project-updates Rubber Research Institute, Sungai Buloh View of a launch gantry under Package V1 being erected to build the MRT guideway. ![]() View of a completed MRT guideway inside Rubber Research Institute in Sungai Buloh. ![]() View of a completed MRT guideway at the location of the future MRT station. ![]() View of a launch gantry constructing the MRT guideway inside the Rubber Research Institute in Sungai Buloh. ![]() View of a launch gantry (blue structure) lifting the segmented box girders (SBGs) to form the MRT guideway ![]() A segmented box girder (SBG) is being delivered to the site. ![]() MRT piers being constructed. ![]() MRT piers ready for the construction of the guideway. ![]() |