> Ultimate LRT extension construction update thread!, Ara Damansara, USJ, Puchong!

views
     
cnvery
post Jan 16 2014, 02:03 AM

Regular
******
Senior Member
1,831 posts

Joined: Dec 2009

+1
TSKampung2005
post Jan 16 2014, 11:19 AM

Proudly Kampungite, will always be one.
Group Icon
VIP
3,028 posts

Joined: Feb 2005
From: 梅田,大阪 //Sabah
QUOTE(lilzany @ Jan 15 2014, 04:03 PM)
i heard that the klang lrt would ended up here. there is so much news and videos about how the MRT stations are being built but nothing on the LRT by Prasarana. It almost looks like it is an oversight to complete and to further expand the hastily planned lines.

so far the the future transfer station is awesome and lots of work are being done to make it a smooth transit. not like the fail Dang Wangi/Bukit Nanas, KL Sentral LRT to Monorail, and last but not least Masjid Jamek, the ever incredible one system two stations...

they even call it transit stations?
*
They were failures made in the past. Made when you have totally separate operators and each line was planned by its own firms sad.gif
lilzany
post Jan 16 2014, 04:53 PM

Regular
******
Senior Member
1,479 posts

Joined: Mar 2005
From: Kuala Lumpur
QUOTE(Kampung2005 @ Jan 16 2014, 11:19 AM)
They were failures made in the past. Made when you have totally separate operators and each line was planned by its own firms  sad.gif
*
i am glad that Putra line gets the better of the two due to connecting to KLCC


TSKampung2005
post Jan 18 2014, 12:51 AM

Proudly Kampungite, will always be one.
Group Icon
VIP
3,028 posts

Joined: Feb 2005
From: 梅田,大阪 //Sabah
Kelana Jaya line extension photos by TRC (October and November 2013)

Source : http://www.trc.com.my/html/product_details...ect&Repost=True

user posted image

user posted image

user posted image
spacelion
post Jan 23 2014, 10:16 AM

Ada Liu
******
Senior Member
1,691 posts

Joined: Mar 2009
From: Probation?
Just saw this today from my workplace

user posted image
sheepherder
post Jan 24 2014, 04:44 PM

New Member
*
Junior Member
43 posts

Joined: Jan 2012
Persiaran Jengka, Subang Jaya

user posted image

user posted image

user posted image

user posted image
TSKampung2005
post Jan 30 2014, 10:22 PM

Proudly Kampungite, will always be one.
Group Icon
VIP
3,028 posts

Joined: Feb 2005
From: 梅田,大阪 //Sabah
Kelana Jaya line extension update (photos by dengilo)

Station 1
user posted image

Trackworks around Lembah Subang depot
user posted image
user posted image

Towards Putra Heights
user posted image
jonc88
post Jan 31 2014, 10:42 AM

New Member
*
Newbie
0 posts

Joined: Oct 2012


They're still stuck at that first span to the portal frame? shocking.gif Kinda slow is being really nice to TRC... sad.gif
cnvery
post Feb 3 2014, 01:04 AM

Regular
******
Senior Member
1,831 posts

Joined: Dec 2009

QUOTE(jonc88 @ Jan 31 2014, 10:42 AM)
They're still stuck at that first span to the portal frame?  shocking.gif  Kinda slow is being really nice to TRC...  sad.gif
*
Compare to Singapore, nothings to say.... sad.gif
jonc88
post Feb 7 2014, 10:17 PM

New Member
*
Newbie
0 posts

Joined: Oct 2012


QUOTE(cnvery @ Feb 3 2014, 01:04 AM)
Compare to Singapore, nothings to say.... sad.gif
*
Singapore is okay, sometimes a little slow but nothing like Malaysia. I'd say Bangkok is quicker too.. sad.gif
cnvery
post Feb 8 2014, 09:46 PM

Regular
******
Senior Member
1,831 posts

Joined: Dec 2009

QUOTE(jonc88 @ Feb 7 2014, 10:17 PM)
Singapore is okay, sometimes a little slow but nothing like Malaysia. I'd say Bangkok is quicker too..  sad.gif
*
I as a Malaysian always expect Malaysia can do better than this, but always dissappointed us sad.gif
jonc88
post Feb 9 2014, 05:19 PM

New Member
*
Newbie
0 posts

Joined: Oct 2012


QUOTE(cnvery @ Feb 8 2014, 09:46 PM)
I as a Malaysian always expect Malaysia can do better than this, but always dissappointed us sad.gif
*
Unfortunately so. This LEP has taken way long. Mooted back in 2006 and completion in 2016? 10 years from conception to realization. rclxms.gif shakehead.gif
stimix
post Feb 9 2014, 08:40 PM

Dunno
Group Icon
Moderator
3,542 posts

Joined: Jan 2003
From: Puchong, Selangor



Looking at the current slow progress everywhere, i doubt the project can complete on time. Another klia2 coming soon
lilzany
post Feb 16 2014, 10:06 AM

Regular
******
Senior Member
1,479 posts

Joined: Mar 2005
From: Kuala Lumpur
QUOTE(stimix @ Feb 9 2014, 08:40 PM)
Looking at the current slow progress everywhere, i doubt the project can complete on time. Another klia2 coming soon
*
at this point in time i'm expecting them to be working round the clock. i drove around 3am at night and i don't see any long trailers around. so how are they going to transport those SBGs? meaning they are either not producing it fast enough or they expect to move it during day time? rclxub.gif rclxub.gif

i have a chance to see AZRB transporting the SBGs everytime when the Subang Kelana link was being constructed. damn they were so huge. with the viaduct even half complete when the hell are there going to do a test run and signalling systems which is going to take another 1.5 years...

2017 at the best, delayed by one full year. at this sad state of construction i doubt it will be first quarter of 2016. 2015 my foot.
TSKampung2005
post Feb 24 2014, 07:43 PM

Proudly Kampungite, will always be one.
Group Icon
VIP
3,028 posts

Joined: Feb 2005
From: 梅田,大阪 //Sabah
Stesen Subang Jaya

Photo by sapphire blue (SSC)

21-2-2014

user posted image

user posted image
davkong
post Feb 27 2014, 07:39 PM

reConnect
******
Senior Member
1,766 posts

Joined: Jan 2003
From: Malaysia


Pusat Bandar Puchong ST07 progress today. Still very very slow, just foundations for the station and multistory (?) car park.

user posted image
TSKampung2005
post Feb 27 2014, 07:41 PM

Proudly Kampungite, will always be one.
Group Icon
VIP
3,028 posts

Joined: Feb 2005
From: 梅田,大阪 //Sabah
QUOTE(davkong @ Feb 27 2014, 07:39 PM)
Pusat Bandar Puchong ST07 progress today. Still very very slow, just foundations for the station and multistory (?) car park.

user posted image
*
I wonder if they can make it for March 2016.
jonc88
post Mar 1 2014, 10:35 AM

New Member
*
Newbie
0 posts

Joined: Oct 2012


QUOTE(Kampung2005 @ Feb 27 2014, 07:41 PM)
I wonder if they can make it for March 2016.
*
Usually elevated stations are quicker to construct than underground ones. It might be tight and certain things to touch up, but it is possible. Original Putra LRT was done in 2 years, construction 1996 with opening in 1998. Then again, construction these days seems to dilly-dally.
TSKampung2005
post Mar 1 2014, 10:29 PM

Proudly Kampungite, will always be one.
Group Icon
VIP
3,028 posts

Joined: Feb 2005
From: 梅田,大阪 //Sabah
Ampang line extension, Puchong update (1/3/2014)

user posted image

user posted image

user posted image

user posted image

user posted image

user posted image

user posted image

user posted image

user posted image
[Ancient]-XinG-
post Mar 1 2014, 10:48 PM

20k VIP club
*******
Senior Member
5,752 posts

Joined: Jan 2012
QUOTE(Kampung2005 @ Feb 24 2014, 07:43 PM)
Stesen Subang Jaya

Photo by sapphire blue (SSC)

21-2-2014

user posted image

user posted image
*
yes, this is otw to klang on federal highway