QUOTE(Kampung2005 @ Dec 22 2013, 08:22 PM)
For Kelana Jaya line, there is no plan for longer trains, but there will be more trains, in even shorter intervals.
*
that is still good news then. thanks for the inform Kampung. I'm damn excited of this line to be honest with the MRT too.
ANNIYAN_X
post Dec 23 2013, 03:38 PM

On my way
****
Senior Member
572 posts

Joined: Dec 2011


QUOTE(Kampung2005 @ Dec 22 2013, 07:40 PM)
That one is MRCB.

Bina Puri is from Sri Petaling to roughly Kinrara area.
*
the puchong perdana stretch their taking more time because I think not of slow.. but the land is pasir land, u see they korek all white color sand, near kinrara all red color sand... so in puchong perdana they doing more longer and frequent soil test.. sometime we see they stack big big stone, usually I see wherever got station only they stack the stones but in perdana even the tiang place also they stack the stones, the tiang I mean here is the viaduct if im not mistaken, anyway now two tiang frame almost come up halfway already, I cant take pic while driving, if get chance il take and put...the 2 tiang frame come up is near the puchong perdana school.. I think they are doing stronger foundation for puchong perdana area stretch... puchong prima near the station some work always goin on but do not noe what actualy they doin.
lilzany
post Dec 29 2013, 01:50 PM

Regular
******
Senior Member
1,479 posts

Joined: Mar 2005
From: Kuala Lumpur
QUOTE(ANNIYAN_X @ Dec 23 2013, 03:38 PM)
the puchong perdana stretch their taking more time because I think not of slow.. but the land is pasir land, u see they korek all white color sand, near kinrara all red color sand... so in puchong perdana they doing more longer and frequent soil test.. sometime we see they stack big big stone, usually I see wherever got station only they stack the stones but in perdana even the tiang place also they stack the stones, the tiang I mean here is the viaduct if im not mistaken, anyway now two tiang frame almost come up halfway already, I cant take pic while driving, if get chance il take and put...the 2 tiang frame come up is near the puchong perdana school.. I think they are doing stronger foundation for puchong perdana area stretch... puchong prima near the station some work always goin on but do not noe what actualy they doin.
*
yup same thing happens in SS15/SS17 stretch. it needs more work done than simple bore piling found along the stretch of Jalan Kewajipan. i am happy that they are so thorough on the foundations. but then to think about it won't they have known the soil structure from aeons ago.

it is not hard to find out our geological soil structure from geologist before hand. how otherwise could we have TBM built for our soil. so far I have read TBM haven't reach the stage of development where one machine fits for an all purpose geological formation
jonc88
post Jan 1 2014, 09:38 PM

New Member
*
Newbie
0 posts

Joined: Oct 2012


Came across this video


http://youtu.be/Waav3Jd5JNo
TSKampung2005
post Jan 7 2014, 03:04 PM

Proudly Kampungite, will always be one.
Group Icon
VIP
3,028 posts

Joined: Feb 2005
From: 梅田,大阪 //Sabah
Kelana Jaya line extension, KTM Subang Jaya (7/1/2014)

user posted image

user posted image

user posted image
TSKampung2005
post Jan 7 2014, 09:53 PM

Proudly Kampungite, will always be one.
Group Icon
VIP
3,028 posts

Joined: Feb 2005
From: 梅田,大阪 //Sabah
Source : https://twitter.com/MyRapidKL

Around Lembah Subang depot, after station 1 of Kelana Jaya line extension (3/1/2014)

user posted image
jonc88
post Jan 7 2014, 10:42 PM

New Member
*
Newbie
0 posts

Joined: Oct 2012


Thanks for the updates. Looks like they are starting to launch across the Federal Highway. Wasn't at that stage yet on 24 December.
TSKampung2005
post Jan 7 2014, 11:11 PM

Proudly Kampungite, will always be one.
Group Icon
VIP
3,028 posts

Joined: Feb 2005
From: 梅田,大阪 //Sabah
Photos by sapphire blue

The Summit USJ

user posted image

Uploaded with ImageShack.us

user posted image

Uploaded with ImageShack.us

TSKampung2005
post Jan 8 2014, 07:38 PM

Proudly Kampungite, will always be one.
Group Icon
VIP
3,028 posts

Joined: Feb 2005
From: 梅田,大阪 //Sabah
Ampang line extension package A update by Bina Puri

http://www.binapuri.com.my/public/projects-ongoing.aspx

user posted image

user posted image

user posted image

user posted image

user posted image

user posted image

user posted image

user posted image
clearcase
post Jan 9 2014, 09:38 AM

Getting Started
**
Junior Member
143 posts

Joined: Mar 2010
From: kamfet zon™

Wow those stairs are so high
TSKampung2005
post Jan 9 2014, 10:34 AM

Proudly Kampungite, will always be one.
Group Icon
VIP
3,028 posts

Joined: Feb 2005
From: 梅田,大阪 //Sabah
QUOTE(clearcase @ Jan 9 2014, 09:38 AM)
Wow those stairs are so high
*
Minimum 5.4 m biggrin.gif
TSKampung2005
post Jan 9 2014, 10:39 AM

Proudly Kampungite, will always be one.
Group Icon
VIP
3,028 posts

Joined: Feb 2005
From: 梅田,大阪 //Sabah
Summit USJ

user posted image

user posted image

user posted image

user posted image
TSKampung2005
post Jan 9 2014, 10:46 AM

Proudly Kampungite, will always be one.
Group Icon
VIP
3,028 posts

Joined: Feb 2005
From: 梅田,大阪 //Sabah
Persiaran Kewajipan

user posted image

user posted image

user posted image

This post has been edited by Kampung2005: Jan 9 2014, 10:19 PM
TSKampung2005
post Jan 9 2014, 09:43 PM

Proudly Kampungite, will always be one.
Group Icon
VIP
3,028 posts

Joined: Feb 2005
From: 梅田,大阪 //Sabah
Ampang line extension station 1, Awan Besar

https://www.facebook.com/myrapid

user posted image
cnvery
post Jan 9 2014, 10:09 PM

Regular
******
Senior Member
1,831 posts

Joined: Dec 2009

Good progress for Persiaran Kewajipan
TSKampung2005
post Jan 10 2014, 10:46 PM

Proudly Kampungite, will always be one.
Group Icon
VIP
3,028 posts

Joined: Feb 2005
From: 梅田,大阪 //Sabah
Photos taken by sapphire blue

Putra Height

user posted image

user posted image

user posted image

user posted image
TSKampung2005
post Jan 13 2014, 08:09 AM

Proudly Kampungite, will always be one.
Group Icon
VIP
3,028 posts

Joined: Feb 2005
From: 梅田,大阪 //Sabah
Jalan Lapangan Terbang Subang (12/1/2014)

user posted image

user posted image

user posted image

user posted image

user posted image

user posted image

user posted image

Station 3
user posted image
TSKampung2005
post Jan 13 2014, 08:10 AM

Proudly Kampungite, will always be one.
Group Icon
VIP
3,028 posts

Joined: Feb 2005
From: 梅田,大阪 //Sabah
Jalan Lapangan Terbang Subang (12/1/2014)

Not far from NKVE
user posted image

user posted image

user posted image

user posted image

Towards Ara Damansara
user posted image

user posted image

Station 2
user posted image

user posted image

user posted image

Towards the other direction (southwards), photo taken just down of station 2
user posted image
elmond
post Jan 13 2014, 09:10 AM

Look at all my stars!!
*******
Senior Member
2,262 posts

Joined: Jul 2013
QUOTE(Kampung2005 @ Jan 13 2014, 08:10 AM)
Jalan Lapangan Terbang Subang (12/1/2014)

Station 2
user posted image

user posted image

user posted image

Towards the other direction (southwards), photo taken just down of station 2
user posted image
*
nice photo, see the width of the elevated track. it's really wide than usual.


lilzany
post Jan 15 2014, 04:03 PM

Regular
******
Senior Member
1,479 posts

Joined: Mar 2005
From: Kuala Lumpur
QUOTE(elmond @ Jan 13 2014, 09:10 AM)
nice photo, see the width of the elevated track. it's really wide than usual.
*
i heard that the klang lrt would ended up here. there is so much news and videos about how the MRT stations are being built but nothing on the LRT by Prasarana. It almost looks like it is an oversight to complete and to further expand the hastily planned lines.

so far the the future transfer station is awesome and lots of work are being done to make it a smooth transit. not like the fail Dang Wangi/Bukit Nanas, KL Sentral LRT to Monorail, and last but not least Masjid Jamek, the ever incredible one system two stations...

they even call it transit stations?