How is the current sales status?
This post has been edited by CMW123: Jan 21 2013, 10:22 AM
Investment ARA GREENS RESIDENCES | ARA GREENS VILLAGE, A Sanctuary for Multi-Generations.
Investment ARA GREENS RESIDENCES | ARA GREENS VILLAGE, A Sanctuary for Multi-Generations.
|
|
Jan 21 2013, 10:20 AM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
3,774 posts Joined: Mar 2012 |
How is the current sales status?
This post has been edited by CMW123: Jan 21 2013, 10:22 AM |
|
|
|
|
|
Feb 8 2013, 03:01 PM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
5,488 posts Joined: Jun 2008 |
left final block to launch after chinese new year
overalls about 60% sold |
|
|
Feb 8 2013, 03:41 PM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
5,488 posts Joined: Jun 2008 |
Saturday November 6, 2010
Residents against more commercial buildings By TAN KARR WEI karrwei@thestar.com.my MORE talk of hijacked institutional land surfaced during a public hearing at the Petaling Jaya City Council (MBPJ) headquarters recently. About 20 Ara Damansara residents attended two back-to-back public hearings to raise their concerns about the proposed development of two projects on PJU 1A/20. The session was chaired by MBPJ councillor Tiew Way Keng and attended by officers from the engineering and town planning departments. Eyesore: Ara Damansara residents are worried that the proposed developments would end up like this abandoned Platinum Damansara project along PJU1A/3. The same group of residents had earlier attended two briefing sessions by the developers and had raised several issues regarding the projects. The proposed projects on two adjacent pieces of land were: — The Villamas project comprising two office blocks of 11 and 13 storeys, one 14-storey service apartment with two storeys of retail podium; and — The Ara Green wellness and healthcare city comprising six blocks of 15-storey buildings, one block of 12-storey service apartments, one four-storey medical centre and two storeys of retail podium. Among some of the issues they raised during the first two rounds of dialogues were traffic congestion, safety, risk of abandonment, drainage and risk of flooding. The residents, led by representative Shawn Chong put up an impressive presentation to back their objection to the projects. He said residents had obtained the master plan of the Ara Damansara area from the developer of their residential area, which showed that the plots of adjacent land on which the developments would take place was meant for recreation and had been sub-divided and sold without their knowledge. “The land where the now-abandoned Platinum Damansara project stands was meant for a secondary school and the site of the Taipan 1 commercial area was meant for a primary school,” he added. StarMetro in June had highlighted a similar case in Bandar Utama, where at least 12 plots of land surrendered to the state for institutional purposes was now being used for commercial buildings. “We have no schools in Ara Damansara now and we have to drive quite a distance to send our children to school,” said one resident at the hearing. Subang MP Sivarasa Rasiah’s aide Peter Chong, who was also present at the hearings, said the hijacked land was a state government issue and he suggested that residents file a complaint with the Special Select Committee on Competence, Accountability and Transparency (Selcat). “If they find that there is abuse in the transfer of land, then the matter can be taken to MACC,” he said. On other matters, residents said there were already many commercial lots in the area that were unoccupied. They also raised the point that the developer of the first project was not the owner of the land, which made its application invalid. “Both developments will be tapping into the existing infrastructure such as sewage treatment and water supply, and our developers have told us that the infrastructure that they put in place is only for their own development,” said Shawn. Residents even created a three-dimensional simulation of how the traffic flow would be along Jalan PJU1A/20 if both of the projects under objection were allowed to be carried out. Shawn said that many of MBPJ’s proposal to ease traffic congestion in the area had not even been implemented. Among them are: — Opening of the Jalan Tropicana Link; — Installing traffic lights at the Jalan PJU 1A/4A and Jalan Subang junction; — Construction of elevated road crossing NKVE from Ara Damansara onto the Damansara-Puchong Highway; — Connection of missing links between Jalan Lembah Subang and Jalan PJU 1A/1; and — Widening of Jalan Lapangan Terbang Subang near Subang toll. Residents were also not satisfied that the first developer had not submitted any traffic study for their development. “According to the traffic study submitted by the second developer, the traffic condition of Jalan Lapangan Terbang during rush hours was already currently at level F, which is the worst level. What is going to happen once the the few ongoing developments are ready and these two projects are allowed to go ahead?” said resident C.P. Lim. After the two hearings, another group of Ara Damansara residents attended a third one regarding another development located near the NZX commercial centre, comprising one 28-storey tower, 21 storeys of service apartments and two storeys of retail shops. Tiew said the applications for the projects would be tabled at the One-Stop Centre committee meeting on Nov 15. |
|
|
Feb 23 2013, 04:51 PM
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,973 posts Joined: Apr 2012 |
Final block C when when when?
|
|
|
Feb 23 2013, 05:42 PM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
3,774 posts Joined: Mar 2012 |
|
|
|
Feb 23 2013, 05:45 PM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
5,488 posts Joined: Jun 2008 |
|
|
|
|
|
|
Feb 23 2013, 05:50 PM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
3,774 posts Joined: Mar 2012 |
|
|
|
Apr 8 2013, 12:12 PM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
3,774 posts Joined: Mar 2012 |
Heard that Somerset under Ascott is confirmed will be at Aragreens Village.
This will enhance the value of this project? |
|
|
Apr 8 2013, 12:44 PM
|
![]() ![]()
Junior Member
197 posts Joined: Apr 2012 |
|
|
|
Apr 8 2013, 01:16 PM
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,973 posts Joined: Apr 2012 |
|
|
|
Apr 12 2013, 08:09 PM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
3,774 posts Joined: Mar 2012 |
Heard going to increase price wef 15 apr. Sure boh?
|
|
|
Apr 13 2013, 09:32 AM
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,973 posts Joined: Apr 2012 |
|
|
|
May 22 2013, 03:24 PM
|
![]()
Junior Member
45 posts Joined: Jul 2012 |
Any latest news on this project? Heard price has increase
|
|
|
|
|
|
May 26 2013, 01:56 PM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]()
All Stars
10,777 posts Joined: Sep 2009 |
AraGreens Residences, Ara Damansara
Verde @ Ara Damansara propertytalk & lifestyle malaysia ![]() ![]() |
|
|
May 29 2013, 09:18 PM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
3,774 posts Joined: Mar 2012 |
|
|
|
Jun 11 2013, 11:51 AM
|
![]() ![]()
Junior Member
117 posts Joined: Aug 2012 |
any news on d last block? any indicative psf?
|
|
|
Jun 12 2013, 04:53 PM
|
![]() ![]()
Junior Member
197 posts Joined: Apr 2012 |
|
|
|
Jun 12 2013, 05:22 PM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
3,774 posts Joined: Mar 2012 |
QUOTE(swisspalm @ Jun 12 2013, 04:53 PM) First Block D structure reach 8th Floor, looks like this project will deliver ahead of schedule, seems like the developer is pretty well financed and the the contractor Putra Perdana is efficient...The selling price also increase quite a bit... |
|
|
Jun 13 2013, 09:40 AM
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,973 posts Joined: Apr 2012 |
QUOTE(CMW123 @ Jun 12 2013, 05:22 PM) First Block D structure reach 8th Floor, looks like this project will deliver ahead of schedule, seems like the developer is pretty well financed and the the contractor Putra Perdana is efficient... Any spy pix of the neighbour? Hv they even started pilling works?The selling price also increase quite a bit... |
|
|
Jun 26 2013, 03:20 PM
|
![]() ![]()
Junior Member
197 posts Joined: Apr 2012 |
|
| Change to: | 0.0377sec
0.80
6 queries
GZIP Disabled
Time is now: 19th December 2025 - 12:42 AM |