i went there quite some number of ppl make their payment
also
they only accept BANKER CHEQUE or BANK DRAFT or CASH
no personal cheque
keith5988
post Aug 26 2011, 02:10 PM

New Member
*
Junior Member
9 posts

Joined: Apr 2011


QUOTE(nakashimakazuma @ Aug 26 2011, 12:48 PM)
i went there quite some number of ppl make their payment
also
they only accept BANKER CHEQUE or BANK DRAFT or CASH
no personal cheque
*
Can I pay by Credit card? I remember last time all my payment to PV were through Cr.card wo.
nakashimakazuma
post Aug 26 2011, 02:14 PM

Getting Started
**
Junior Member
189 posts

Joined: Sep 2009
From: Earth


the letter written only cash or banker cheque
also there is 1 uncle bring cheque book there
but kenot use, end up go bank withdraw money
PeterChai288
post Aug 26 2011, 02:34 PM

Casual
***
Junior Member
310 posts

Joined: Apr 2011
Huhu...key can take but no water n power...look like this issue will only solve after oct lo...if wanna move in then no problem...go take water urself n use oil lamp lo.haha...but 1 good thing...1 thing positive is....do reno now n save ur own electric bill lo...hehe...hope this will at least compensate us for hard feeling...
Dyensem
post Aug 26 2011, 02:43 PM

New Member
*
Junior Member
42 posts

Joined: Jun 2011


QUOTE(cookwithjamie @ Aug 24 2011, 12:20 AM)

We also have an address already, its

A-X-X, PV13
Platinum Lake Condominium
No 9, Jalan Saujana 1
53300 Danau Kota, Kuala Lumpur
*
I wonder if the address is correct or typo error...but logically what is No 9 doing there in the address? What is it referred to? Look weird for high rise building address...

Name card given by MCF contractor doesn't have the No 9...street name also different but never mind on the street name, at least it has name..you guys don't feel weird?
Coloring Life
post Aug 26 2011, 02:57 PM

New Member
*
Junior Member
35 posts

Joined: Jul 2011
Will Pv follow the date of collect the key or the real CF receive?
Can we claim for our suffer losses?
Someone please guide me,i don't think PV doing the right way.I think PV playing some small trick.What happen if i didn't collect the key?
Can i wait till the CF release and everything settle down only collect the key?
sony_user999
post Aug 26 2011, 05:54 PM

New Member
*
Junior Member
46 posts

Joined: Jul 2009
jz got the letter today. and today is friday. nothing can do anymore.
meaning, wait till monday only able pay them money. then, will rush bank to do their job dy.
by the way, wana ask. after i got the key. it doesn't mean i can go in and out as i like. right?

as wat i tried, during night time, we totally cant even access to the condo.

for the 14days, i already asked. there's shouldn't be any problem. but who knows. these big company like to use black and white things to bully those ppl tat believe them.

anyhow, after we signed the letter after do those checking, can we still complain on those prblem occur during our stay? from wat i heard from my friend, there is 1 year warranty or guarantee on this thing. right?
esjates
post Aug 26 2011, 07:00 PM

New Member
*
Junior Member
33 posts

Joined: Apr 2009
I've already done my checking.. Got some minor cracks here n there.. Also got i tile pecah at the kitchen..
Pikachu1985
post Aug 27 2011, 08:16 AM

Getting Started
**
Junior Member
125 posts

Joined: Jun 2011
Yesterday i went to MCF . i show my idea i want a 2 row of kitchen cab with bar counter.plaster ceiling whole house,Tv cabinet ,wallpapers,bedrood cab,wall cab,and bedroom wall decos hacking wiring and fix all included cost .they qoute me less then RM 60k. Guys do u feel ok? or expensive
keith5988
post Aug 27 2011, 10:02 AM

New Member
*
Junior Member
9 posts

Joined: Apr 2011


QUOTE(esjates @ Aug 26 2011, 07:00 PM)
I've already done my checking.. Got some minor cracks here n there.. Also got i tile pecah at the kitchen..
*
My unit also...cracked tile in balcony, loose window lock, poor painting...
My 1st house...out of expectation...hai.

This post has been edited by keith5988: Aug 27 2011, 10:03 AM
Pikachu1985
post Aug 27 2011, 10:50 AM

Getting Started
**
Junior Member
125 posts

Joined: Jun 2011
QUOTE(keith5988 @ Aug 27 2011, 10:02 AM)
My unit also...cracked tile in balcony, loose window lock, poor painting...
My 1st house...out of expectation...hai.
*
Waaa so that bad......what happen to PV workmenship
donnylcy
post Aug 27 2011, 06:20 PM

New Member
*
Junior Member
12 posts

Joined: Aug 2011


just went to visit the show room at A13-21. Not complete yet.
Got few in house Contractor help to quote price...
vanillacloud
post Aug 28 2011, 01:16 PM

New Member
*
Junior Member
8 posts

Joined: Jun 2008


QUOTE(Dyensem @ Aug 26 2011, 02:43 PM)
I wonder if the address is correct or typo error...but logically what is No 9 doing there in the address? What is it referred to? Look weird for high rise building address...

Name card given by MCF contractor doesn't have the No 9...street name also different but never mind on the street name, at least it has name..you guys don't feel weird?
*
It's not a typo but an official address from the city council, it arranges according to the lot number, I guess.

The street name printed on MCF Sdn Bhd's name card is based on the "old road name" 2 years back, which assume the street name will be "an extension on the existing road" but city council has given it a new name, group it into the "Saujana" streets. Anyway "PV13 Danau Kota" is enough laugh.gif


Added on August 28, 2011, 1:39 pm
QUOTE(novabankinghall @ Aug 20 2011, 09:54 PM)
hi guys. I'm shopping around for aircon. can someone tell me if our unit comes with conseal copper pipping? reason I ask is that I was advised if really hv conseal copper pipping then no recommend to install inverter as they will review to hack the wall which they won't do it. can help to check the s n p? I left it in my home town.
*
I'm not sure you already have the answer or not. PV13 "built-in" A/C point is comprise of a water drain pipe, and a 15/20Amp power point.

In order to install A/C, there will be 4 conditions on your copper pipe:

1. Back-to-Back
2. External Casing
3. Wall-conceal
4. Hiding on the gymsum ceiling/cornise

And usually higher the technology they required better insulation (thick black thing covering the copper pipe) and then more expensive on installation charge & piping charge.

This post has been edited by vanillacloud: Aug 28 2011, 01:39 PM
PeterChai288
post Aug 29 2011, 12:01 PM

Casual
***
Junior Member
310 posts

Joined: Apr 2011
QUOTE(Pikachu1985 @ Aug 27 2011, 08:16 AM)
Yesterday i went to MCF . i show my idea i want a 2 row of kitchen cab with bar counter.plaster ceiling whole house,Tv cabinet ,wallpapers,bedrood cab,wall cab,and bedroom wall decos hacking wiring and fix all included cost .they qoute me less then RM 60k. Guys do u feel ok? or expensive
*
Pricing is acceptable since now material cost is keep on rising....but 1 thing costly is the aircond piping for the room tat has no window....no choice other than u just install fan nia.hehe.
Dyensem
post Aug 29 2011, 01:43 PM

New Member
*
Junior Member
42 posts

Joined: Jun 2011


QUOTE(PeterChai288 @ Aug 29 2011, 12:01 PM)
Pricing is acceptable since now material cost is keep on rising....but 1 thing costly is the aircond piping for the room tat has no window....no choice other than u just install fan nia.hehe.
*
Yea..the piping is costly for that area..but still got other option other than fan, which is portable air cond cost around 1k to 2k depend on brand and hp..
dreaming_gal123
post Aug 30 2011, 10:18 AM

New Member
*
Junior Member
46 posts

Joined: Oct 2009
can we move in by end of sept??
PeterChai288
post Aug 31 2011, 10:14 AM

Casual
***
Junior Member
310 posts

Joined: Apr 2011
QUOTE(dreaming_gal123 @ Aug 30 2011, 10:18 AM)
can we move in by end of sept??
*
Sure u can move in if u dun mind no tnb n water
haiz power quite a troublesome...maybe water is earlier.hehe.

ROBINHAR
post Sep 1 2011, 06:17 PM

New Member
*
Junior Member
16 posts

Joined: Jun 2011
I didn't see the name of "PV 13" place outside our condo ?

PeterChai288
post Sep 1 2011, 06:25 PM

Casual
***
Junior Member
310 posts

Joined: Apr 2011
QUOTE(ROBINHAR @ Sep 1 2011, 06:17 PM)
I didn't see the name of "PV 13" place outside our condo ?
*
Correct.i wonder where will they put it...
donnylcy
post Sep 2 2011, 01:46 AM

New Member
*
Junior Member
12 posts

Joined: Aug 2011


i thk Elec wil be ready before end Sept. *finger cross*