QUOTE(webby88 @ Nov 13 2010, 05:35 PM)
I was referring to the 2 units adjacent to the carpark where access to the L shape balcony is via the masterbedroom. Are we referring to the same thing?
I think that is D, and im refering to AInvestment SETAPAK GREEN RESIDENCES by UOA, Your Enclave for Refresh Living
|
|
Nov 13 2010, 06:01 PM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
2,847 posts Joined: Oct 2010 |
|
|
|
|
|
|
Nov 13 2010, 06:22 PM
|
![]() ![]()
Junior Member
93 posts Joined: Oct 2010 |
still waiting for the design. i hope i wont miss any chances to buy another property
|
|
|
Nov 13 2010, 06:41 PM
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,346 posts Joined: Jul 2009 |
|
|
|
Nov 13 2010, 07:56 PM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
2,847 posts Joined: Oct 2010 |
|
|
|
Nov 13 2010, 08:56 PM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
2,406 posts Joined: Jan 2003 |
|
|
|
Nov 13 2010, 09:45 PM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
2,847 posts Joined: Oct 2010 |
|
|
|
|
|
|
Nov 13 2010, 10:16 PM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
2,406 posts Joined: Jan 2003 |
Unit 1 and Unit 18 those tat are below level 8 will have some disadvantage.
can c car park. wat is the unit 1 bad part? Added on November 13, 2010, 10:28 pmoh i think i know wat u mean u mean the L Shape balcony/terrace is in master bedroom eh? This post has been edited by cybertechmkteo: Nov 13 2010, 10:28 PM |
|
|
Nov 13 2010, 10:32 PM
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,346 posts Joined: Jul 2009 |
QUOTE(cybertechmkteo @ Nov 13 2010, 10:16 PM) Unit 1 and Unit 18 those tat are below level 8 will have some disadvantage. Anyway, the final judgement would be the quality and the finishing before signing the S&P. I spoke to many potential buyers, and they all said that would be their criteria too. can c car park. wat is the unit 1 bad part? Added on November 13, 2010, 10:28 pmoh i think i know wat u mean u mean the L Shape balcony/terrace is in master bedroom eh? So UOA, many sales or fallout will depends on you. |
|
|
Nov 13 2010, 10:38 PM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
2,406 posts Joined: Jan 2003 |
lets wait for the final plans and protoype and oso the spec.
as for the final finishing and the appearance, hopefully can looks promising. |
|
|
Nov 13 2010, 10:39 PM
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,346 posts Joined: Jul 2009 |
|
|
|
Nov 13 2010, 10:40 PM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
2,406 posts Joined: Jan 2003 |
january if not mistaken.
|
|
|
Nov 13 2010, 10:51 PM
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,346 posts Joined: Jul 2009 |
|
|
|
Nov 13 2010, 10:55 PM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
2,406 posts Joined: Jan 2003 |
sometimes SA said december sign SPA
sometimes theysaid sign in January .... ::S:S:S |
|
|
|
|
|
Nov 13 2010, 10:56 PM
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,346 posts Joined: Jul 2009 |
|
|
|
Nov 13 2010, 10:59 PM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
2,847 posts Joined: Oct 2010 |
SA confirmed got Showunit (confirmed by one of the SA). Not sure when. SA mentioned not sure whether December 10 or Jan 11 S&P, it all depends to the AP.
I believe they do need a show unit to reassure the booker or buyer, before S&P This post has been edited by hidden830726: Nov 13 2010, 10:59 PM |
|
|
Nov 13 2010, 11:02 PM
|
![]() ![]()
Junior Member
157 posts Joined: Apr 2010 |
Today i drop by at the site, the sale admin told me that there will be no bridge connect the road to genting klang as they will remove the bridge soon, is this true?? then any time want to go genting klang need pass by polis station there??!!
|
|
|
Nov 13 2010, 11:16 PM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
2,847 posts Joined: Oct 2010 |
QUOTE(ng168 @ Nov 13 2010, 11:02 PM) Today i drop by at the site, the sale admin told me that there will be no bridge connect the road to genting klang as they will remove the bridge soon, is this true?? then any time want to go genting klang need pass by polis station there??!! I'm not sure about that. But i heard from 288 ppl that they will be widening the road along the monsoon drain. So if that's the case, i wont suprise that there is no longer a bridge there, maybe it will still connect but the bridge no more? I doesn't make sense if there remove the bridge and make it so inconvenience for everyone.This one require further verification. This post has been edited by hidden830726: Nov 13 2010, 11:17 PM |
|
|
Nov 13 2010, 11:20 PM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
2,406 posts Joined: Jan 2003 |
meaning.. they going to block the way from bangunan furlong and we'll use the only connection way from 288 road.
|
|
|
Nov 13 2010, 11:38 PM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
2,847 posts Joined: Oct 2010 |
from ng168 post, i would assume he/she heard that the bridge gonna be removed. The second part of his comment is more like a question and not confirm yet.
As i mentioned in previous post, the remove of the bridge might be part of the road widening. And if the road widened, the road might still connect even without the bridge. |
|
|
Nov 14 2010, 12:24 PM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
2,406 posts Joined: Jan 2003 |
fed up with those SAs comment.
|
|
Topic ClosedOptions
|
| Change to: | 0.0323sec
1.09
6 queries
GZIP Disabled
Time is now: 14th December 2025 - 10:14 AM |