Welcome Guest ( Log In | Register )

Bump Topic Topic Closed RSS Feed
161 Pages « < 44 45 46 47 48 > » Bottom

Outline · [ Standard ] · Linear+

Investment SETAPAK GREEN RESIDENCES by UOA, Your Enclave for Refresh Living

views
     
hidden830726
post Nov 13 2010, 06:01 PM

Moko the Linaslayer
*******
Senior Member
2,847 posts

Joined: Oct 2010
QUOTE(webby88 @ Nov 13 2010, 05:35 PM)
I was referring to the 2 units adjacent to the carpark where access to the L shape balcony is via the masterbedroom.  Are we referring to the same thing?
*
I think that is D, and im refering to A
HUJIUNEN
post Nov 13 2010, 06:22 PM

Getting Started
**
Junior Member
93 posts

Joined: Oct 2010


still waiting for the design. i hope i wont miss any chances to buy another property
webby88
post Nov 13 2010, 06:41 PM

Regular
******
Senior Member
1,346 posts

Joined: Jul 2009
QUOTE(hidden830726 @ Nov 13 2010, 06:01 PM)
I think that is D, and im refering to A
*
Then you are right referring to the unit at the other end of the carpark and not the one adjacent to it.
hidden830726
post Nov 13 2010, 07:56 PM

Moko the Linaslayer
*******
Senior Member
2,847 posts

Joined: Oct 2010
QUOTE(HUJIUNEN @ Nov 13 2010, 06:22 PM)
still waiting for the design. i hope i wont miss any chances to buy another property
*
Why u said so? mind to share?

TScybertechmkteo
post Nov 13 2010, 08:56 PM

Proppy Doppy Toppy Toop
*******
Senior Member
2,406 posts

Joined: Jan 2003
QUOTE(webby88 @ Nov 13 2010, 05:35 PM)
I was referring to the 2 units adjacent to the carpark where access to the L shape balcony is via the masterbedroom.  Are we referring to the same thing?
*
This is Type D 1530
hidden830726
post Nov 13 2010, 09:45 PM

Moko the Linaslayer
*******
Senior Member
2,847 posts

Joined: Oct 2010
QUOTE(cybertechmkteo @ Nov 13 2010, 08:56 PM)
This is Type D 1530
*
Well, at least we found something bad about the best unit so far, Unit 1
TScybertechmkteo
post Nov 13 2010, 10:16 PM

Proppy Doppy Toppy Toop
*******
Senior Member
2,406 posts

Joined: Jan 2003
Unit 1 and Unit 18 those tat are below level 8 will have some disadvantage.

can c car park.

wat is the unit 1 bad part?


Added on November 13, 2010, 10:28 pmoh i think i know wat u mean u mean the L Shape balcony/terrace is in master bedroom eh?

This post has been edited by cybertechmkteo: Nov 13 2010, 10:28 PM
webby88
post Nov 13 2010, 10:32 PM

Regular
******
Senior Member
1,346 posts

Joined: Jul 2009
QUOTE(cybertechmkteo @ Nov 13 2010, 10:16 PM)
Unit 1 and Unit 18 those tat are below level 8 will have some disadvantage.

can c car park.

wat is the unit 1 bad part?


Added on November 13, 2010, 10:28 pmoh i think i know wat u mean u mean the L Shape balcony/terrace is in master bedroom eh?
*
Anyway, the final judgement would be the quality and the finishing before signing the S&P. I spoke to many potential buyers, and they all said that would be their criteria too.

So UOA, many sales or fallout will depends on you. smile.gif
TScybertechmkteo
post Nov 13 2010, 10:38 PM

Proppy Doppy Toppy Toop
*******
Senior Member
2,406 posts

Joined: Jan 2003
lets wait for the final plans and protoype and oso the spec.

as for the final finishing and the appearance, hopefully can looks promising.
webby88
post Nov 13 2010, 10:39 PM

Regular
******
Senior Member
1,346 posts

Joined: Jul 2009
QUOTE(cybertechmkteo @ Nov 13 2010, 10:38 PM)
lets wait for the final plans and protoype and oso the spec.

as for the final finishing and the appearance, hopefully can looks promising.
*
any idea if SG will have a show unit?
TScybertechmkteo
post Nov 13 2010, 10:40 PM

Proppy Doppy Toppy Toop
*******
Senior Member
2,406 posts

Joined: Jan 2003
january if not mistaken.
webby88
post Nov 13 2010, 10:51 PM

Regular
******
Senior Member
1,346 posts

Joined: Jul 2009
QUOTE(cybertechmkteo @ Nov 13 2010, 10:40 PM)
january if not mistaken.
*
WTH, after S&P?
TScybertechmkteo
post Nov 13 2010, 10:55 PM

Proppy Doppy Toppy Toop
*******
Senior Member
2,406 posts

Joined: Jan 2003
sometimes SA said december sign SPA

sometimes theysaid sign in January ....

::S:S:S
webby88
post Nov 13 2010, 10:56 PM

Regular
******
Senior Member
1,346 posts

Joined: Jul 2009
QUOTE(cybertechmkteo @ Nov 13 2010, 10:55 PM)
sometimes SA said december sign SPA

sometimes theysaid sign in January ....

::S:S:S
*
Why do they need to have a show unit? Sales on the non KL view very slow?
hidden830726
post Nov 13 2010, 10:59 PM

Moko the Linaslayer
*******
Senior Member
2,847 posts

Joined: Oct 2010
SA confirmed got Showunit (confirmed by one of the SA). Not sure when. SA mentioned not sure whether December 10 or Jan 11 S&P, it all depends to the AP.

I believe they do need a show unit to reassure the booker or buyer, before S&P

This post has been edited by hidden830726: Nov 13 2010, 10:59 PM
ng168
post Nov 13 2010, 11:02 PM

Getting Started
**
Junior Member
157 posts

Joined: Apr 2010
Today i drop by at the site, the sale admin told me that there will be no bridge connect the road to genting klang as they will remove the bridge soon, is this true?? then any time want to go genting klang need pass by polis station there??!!
hidden830726
post Nov 13 2010, 11:16 PM

Moko the Linaslayer
*******
Senior Member
2,847 posts

Joined: Oct 2010
QUOTE(ng168 @ Nov 13 2010, 11:02 PM)
Today i drop by at the site, the sale admin told me that there will be no bridge connect the road to genting klang as they will remove the bridge soon, is this true?? then any time want to go genting klang need pass by polis station there??!!
*
I'm not sure about that. But i heard from 288 ppl that they will be widening the road along the monsoon drain. So if that's the case, i wont suprise that there is no longer a bridge there, maybe it will still connect but the bridge no more? I doesn't make sense if there remove the bridge and make it so inconvenience for everyone.

This one require further verification.

This post has been edited by hidden830726: Nov 13 2010, 11:17 PM
TScybertechmkteo
post Nov 13 2010, 11:20 PM

Proppy Doppy Toppy Toop
*******
Senior Member
2,406 posts

Joined: Jan 2003
meaning.. they going to block the way from bangunan furlong and we'll use the only connection way from 288 road.
hidden830726
post Nov 13 2010, 11:38 PM

Moko the Linaslayer
*******
Senior Member
2,847 posts

Joined: Oct 2010
from ng168 post, i would assume he/she heard that the bridge gonna be removed. The second part of his comment is more like a question and not confirm yet.

As i mentioned in previous post, the remove of the bridge might be part of the road widening. And if the road widened, the road might still connect even without the bridge.
TScybertechmkteo
post Nov 14 2010, 12:24 PM

Proppy Doppy Toppy Toop
*******
Senior Member
2,406 posts

Joined: Jan 2003
fed up with those SAs comment.

161 Pages « < 44 45 46 47 48 > » Top
Topic ClosedOptions
 

Change to:
| Lo-Fi Version
0.0323sec    1.09    6 queries    GZIP Disabled
Time is now: 14th December 2025 - 10:14 AM