 EMPIRE CITY @ Damansara Perdana/Mutiara Damansara, Mixed Development Project in Damasara KL

views
     
groggy
post Feb 8 2011, 08:26 PM

Getting Started
**
Junior Member
187 posts

Joined: Jul 2010
QUOTE(jeghui @ Feb 8 2011, 07:07 PM)
i dont think u can increase the ceiling just by renovation.

maybe MEH need to kaw tim with council. build a sports complex/dewan serbaguna for free for example. or bribe someone? LOL
*
I think very unlikely a project will be abandoned due to specs problem. As long as MEH is financially sound, everything can be sorted out.
Pai
post Feb 9 2011, 12:27 AM

~ Billionaire in training ~
*******
Senior Member
3,318 posts

Joined: Dec 2004
From: 1Malaysia



QUOTE(jeghui @ Feb 8 2011, 09:06 AM)
Pai, thats the best I can share. but lets just pray, pray hard that ED and EC not affected significantly.

i am gutted myself ES not up to specs. why did they cut corners when they knew it was gonna be great?
*
Think it was an unintentional design flaw for ES.......we will know once ED is completed if indeed MeH is intentionally tried to cut corners......
kochin
post Feb 9 2011, 08:55 AM

I just hope I do!
********
All Stars
10,319 posts

Joined: Dec 2009
From: Malaysia


QUOTE(Pai @ Feb 9 2011, 12:27 AM)
Think it was an unintentional design flaw for ES.......we will know once ED is completed if indeed MeH is intentionally tried to cut corners......
*
from what i know, there's a minimum ceiling height for a building. if MEH don't know nevermind, a professional architect MUST know. and since drawings are submitted to council by consultants, the developer and consultants share the blame jointly.
also there's height restriction for a building. from little birds chirpings, they are saying MEH knows they can't achieve the no. of units they were hoping for and so they just charge ahead with it (by lowering ceiling height). so now they are caught with their pants down.
same goes for ED. understand they were adopting similiar strategies. paper design and actual product will surely deviate. don't know whether council will let them make the council looks like fools again or not.
jeghui
post Feb 9 2011, 09:35 AM

Look at all my stars!!
*******
Senior Member
2,934 posts

Joined: Dec 2010
ie. cutting corners
Pai
post Feb 10 2011, 12:48 AM

~ Billionaire in training ~
*******
Senior Member
3,318 posts

Joined: Dec 2004
From: 1Malaysia



So I suppose the loft buyers from ED & EC should be worried now?
kochin
post Feb 10 2011, 10:11 AM

I just hope I do!
********
All Stars
10,319 posts

Joined: Dec 2009
From: Malaysia


QUOTE(Pai @ Feb 10 2011, 12:48 AM)
So I suppose the loft buyers from ED & EC should be worried now?
*
but studio units will be equally affected when loft units can't get clearance from council.
CCC is given to entire project. even if partial CCC requested, usually it's by blocks and not by units.
but all in, i do wish to see sucessful completion and handing over of these 2 projects.
paperwise, it looks fantastic.

realistically, <please don't flame me>, if i'm commanding the ship at MEH, with such fantastic sales, super positive cashflow as of now, anticipated BIG problem for completion on time and compliance to SPA and authority requirement.
it does tempt one to take the easy way out right? doh.gif
jeghui
post Feb 10 2011, 10:18 AM

Look at all my stars!!
*******
Senior Member
2,934 posts

Joined: Dec 2010
i wonder where is that architect who worked on Empire portfolio. he gave comments earlier now so quiet dee.
webby88
post Feb 10 2011, 11:10 AM

Regular
******
Senior Member
1,346 posts

Joined: Jul 2009
QUOTE(jeghui @ Feb 10 2011, 10:18 AM)
i wonder where is that architect who worked on Empire portfolio. he gave comments earlier now so quiet dee.
*
He seem very quiet now. Don't think he wants to be a hero saying things on behalf of his company smile.gif .
jeghui
post Feb 10 2011, 11:21 AM

Look at all my stars!!
*******
Senior Member
2,934 posts

Joined: Dec 2010
QUOTE(webby88 @ Feb 10 2011, 11:10 AM)
He seem very quiet now.  Don't think he wants to be a hero saying things on behalf of his company smile.gif .
*
i guess what is right is right, what is wrong is still wrong.
2.30pm
post Feb 13 2011, 06:51 PM

New Member
*
Junior Member
19 posts

Joined: Sep 2010
QUOTE(Pai @ Feb 10 2011, 01:48 AM)
So I suppose the loft buyers from ED & EC should be worried now?
*
pai,

heard from other forum
http://www.myrealestate.com.my/viewtopic.p...r=asc&start=425
saying that the Full CF is obtained.....

what is Full CF means? for the whole project? (Empire hotel, Empire soho, and Empire retail shops)?

or izit means that the 16ft ceiling height SOHO obtained for permanent CF??

thankz..
Pai
post Feb 13 2011, 07:26 PM

~ Billionaire in training ~
*******
Senior Member
3,318 posts

Joined: Dec 2004
From: 1Malaysia



QUOTE(2.30pm @ Feb 13 2011, 06:51 PM)
pai,

heard from other forum
http://www.myrealestate.com.my/viewtopic.p...r=asc&start=425
saying that the Full CF is obtained.....

what is Full CF means? for the whole project? (Empire hotel, Empire soho, and Empire retail shops)?

or izit means that the 16ft ceiling height SOHO obtained for permanent CF??

thankz..
*
think the big question mark here is whether the ED + EC will be able to obtain CF in the future as dev keep on challenging the law?
wl_n
post Feb 13 2011, 10:01 PM

Enthusiast
*****
Senior Member
745 posts

Joined: Jul 2010
QUOTE(Pai @ Feb 9 2011, 12:27 AM)
Think it was an unintentional design flaw for ES.......we will know once ED is completed if indeed MeH is intentionally tried to cut corners......

QUOTE(kochin @ Feb 9 2011, 08:55 AM)
from what i know, there's a minimum ceiling height for a building. if MEH don't know nevermind, a professional architect MUST know. and since drawings are submitted to council by consultants, the developer and consultants share the blame jointly.
also there's height restriction for a building. from little birds chirpings, they are saying MEH knows they can't achieve the no. of units they were hoping for and so they just charge ahead with it (by lowering ceiling height). so now they are caught with their pants down.
same goes for ED. understand they were adopting similiar strategies. paper design and actual product will surely deviate. don't know whether council will let them make the council looks like fools again or not.
*
This is definately not an unintentional design flaw. This is due to the greed of the developer to reap huge profit and cost saving for construction of the loft upper floor. In other words, this is call cheating. The upper floor will be constructed as part of renovation works inside the unit to form loft with a much much cheaper costs, and this additional floor area will be sold at normal floor psf rate. The upper floor structure will cost much lesser than the normal floor structure. It worked in ES, and now the same strategy will be used in ED.

yoki
post Feb 14 2011, 03:05 PM

Regular
******
Senior Member
1,313 posts

Joined: Jan 2003
From: klang Valley
how much savings are we looking at?
Pai
post Feb 14 2011, 05:56 PM

~ Billionaire in training ~
*******
Senior Member
3,318 posts

Joined: Dec 2004
From: 1Malaysia



QUOTE(wl_n @ Feb 13 2011, 10:01 PM)
QUOTE(Pai @ Feb 9 2011, 12:27 AM)
Think it was an unintentional design flaw for ES.......we will know once ED is completed if indeed MeH is intentionally tried to cut corners......
This is definately not an unintentional design flaw. This is due to the greed of the developer to reap huge profit and cost saving for construction of the loft upper floor. In other words, this is call cheating. The upper floor will be constructed as part of renovation works inside the unit to form loft with a much much cheaper costs, and this additional floor area will be sold at normal floor psf rate. The upper floor structure will cost much lesser than the normal floor structure. It worked in ES, and now the same strategy will be used in ED.
*
If they plan to repeat the same mistake/cheat for EC and ED, then this MEH is clearly looking for trouble..... and no way they'll become top 10 dev with this kind of mentality.....


webby88
post Feb 14 2011, 10:51 PM

Regular
******
Senior Member
1,346 posts

Joined: Jul 2009
QUOTE(Pai @ Feb 14 2011, 05:56 PM)
If they plan to repeat the same mistake/cheat for EC and ED, then this MEH is clearly looking for trouble..... and no way they'll become top 10 dev with this kind of mentality.....
*
MEH can argue about naivety and ignorance for Empire Subang since it is the first case.

However, knowing the problem now and still decide to ignore is unscrupulous. Hope they will not repeat this issue otherwise they might drag the whole bunch of purchasers down with them.

wl_n
post Feb 15 2011, 08:57 AM

Enthusiast
*****
Senior Member
745 posts

Joined: Jul 2010
QUOTE(yoki @ Feb 14 2011, 03:05 PM)
how much savings are we looking at?
*
For ES loft, how much psf purchaser paying for the addtional floor and how much you think the actual cost of this addional steel structure? For ED, current price is at least rm500psf.


Attached thumbnail(s)
Attached Image
yoki
post Feb 15 2011, 09:02 AM

Regular
******
Senior Member
1,313 posts

Joined: Jan 2003
From: klang Valley
QUOTE(wl_n @ Feb 15 2011, 08:57 AM)
For ES loft, how much psf purchaser paying for the addtional floor and how much you think the actual cost of this addional steel structure? For ED, current price is at least rm500psf.
*
the picture tells a thousand words........

very short cut and can see ME aim for max profit
wwwcomment
post Feb 15 2011, 09:25 AM

Getting Started
**
Junior Member
209 posts

Joined: Aug 2010
QUOTE(wl_n @ Feb 15 2011, 08:57 AM)
For ES loft, how much psf purchaser paying for the addtional floor and how much you think the actual cost of this addional steel structure? For ED, current price is at least rm500psf.
*
wah.
unbelievable. ohmy.gif
webby88
post Feb 16 2011, 12:26 AM

Regular
******
Senior Member
1,346 posts

Joined: Jul 2009
QUOTE(wl_n @ Feb 15 2011, 08:57 AM)
For ES loft, how much psf purchaser paying for the addtional floor and how much you think the actual cost of this addional steel structure? For ED, current price is at least rm500psf.
*
The cost is not only the platform but the 16ft high ceiling which cost more to built than the standard ceiling of 10ft. If one takes out the platform, the price psf will be about 700psf. But if one takes the platform as the built up, it is more like 400psf.
kochin
post Feb 16 2011, 10:23 AM

I just hope I do!
********
All Stars
10,319 posts

Joined: Dec 2009
From: Malaysia


tips:
check your SPA sq ft (you will see that this is inclusive of your 'mezzanine floor'
check with council on approved building plans. it will NOT show any mezzanine!