Welcome Guest ( Log In | Register )

Bump Topic Topic Closed RSS Feed
120 Pages « < 7 8 9 10 11 > » Bottom

Outline · [ Standard ] · Linear+

 Military Thread V29

views
     
Mai189
post Jul 30 2022, 03:15 PM

New Member
*
Newbie
0 posts

Joined: Aug 2018
QUOTE(azriel @ Jul 28 2022, 07:32 PM)
Construction progress of Indonesian Navy new Hospital Ship (based from the Makassar LPD) with pennant number 992 have reached 81% at PT PAL shipyard.


*
Is Indonesia still paying licensing fees to DaeSun Shipbuilding (South Korea) for the Makassar class and/or Makassar class derived ships ? It is Daesun which designed the ship.

Indonesia and Perus bought the license to build and sell them.

http://www.navyrecognition.com/index.php?o...=article&id=824

This post has been edited by Mai189: Jul 30 2022, 03:16 PM
azriel
post Jul 31 2022, 12:59 PM

New Member
*
Newbie
4 posts

Joined: Jan 2012
QUOTE
Monday, July 4, 2022

Indonesian shipbuilder bags contract to supply landing platform dock to United Arab Emirates

user posted image 
The 163m LPD design from PT PAL. Photo c/o Valleryan through MaxDefense Philippines.

Indonesian state-owned shipbuilder PT PAL (Persero) has signed a contract with United Arab Emirates Navy (UAEN).

The contract was signed on 01 July 2022, and was part of a total of six agreements between Indonesian and the United Arab Emirates signed during the visit of Indonesian President Joko Widodo to Abu Dhabi.

PT PAL has offered its landing platform dock (LPD) design to the UAE Ministry of Defence (MoD) since 2020 in response to Request for Information released to several international shipbuilders.

The design selected is a 163-meter variant of PT PAL’s LPD design, which is longer than the variant ordered by the Philippines last June 2022, and is closer to the design offered by PT PAL to meet the Royal Malaysian Navy’s Multi-Role Support Ship (MRSS) program.

The additional length allows for a longer helicopter landing facility for 3 medium helicopters, and a hangar large enough to accommodate 2 medium helicopters.

It also has highly customizable payload bays, and equipped with an automated launch and recovery system for Rigid Hull Inflatable Boats (RHIB) and landing crafts.

According to Indonesian sources, the ship has a displacement of around 12,500 tonnes, a beam of 24 meters, a draft of 6 meters, and is capable of achieving a maximum speed of 18 knots and a cruising speed of 15 knots.

It can be armed with a variety of weapon systems including a 76mm naval gun, 20mm to 30mm remote controlled weapon stations or close-in weapon systems, heavy machine guns, and counter-measure systems.


https://www.asiapacificdefensejournal.com/2...act-to.html?m=1


azriel
post Jul 31 2022, 01:02 PM

New Member
*
Newbie
4 posts

Joined: Jan 2012
Construction process of Indonesian Navy new Hospital Ship pennant number 992.


azriel
post Jul 31 2022, 01:06 PM

New Member
*
Newbie
4 posts

Joined: Jan 2012
PLA J-35 fighter Jet.


azriel
post Aug 2 2022, 05:48 PM

New Member
*
Newbie
4 posts

Joined: Jan 2012
QUOTE
Malaysian navy proposes to equip Kedah-class corvettes with Naval Strike Missile

01 AUGUST 2022
by Ridzwan Rahmat

The Royal Malaysian Navy (RMN) has laid out an MYR214 million (USD48 million) plan to equip two of its Kedah (MEKO 100 RMN)-class corvettes with Naval Strike Missile (NSM) launchers.

Documents obtained by Janes indicate that the plan is being proposed as a three-part procurement project under the RMN's ‘Rolling Plan 4' of the 12th Malaysia Plan, which runs from 2021 to 2025. Rolling Plan 4 covers proposals that will be funded in the country's national budget for 2024.

The RMN operates six Kedah-class corvettes that were commissioned between June 2006 and December 2010. The corvettes were built under a technology transfer agreement arranged between Penang Shipbuilding Corporation (present-day Boustead Naval Shipyard) and a German consortium led by Blohm+Voss.

Each vessel is armed with a 76 mm naval gun in the primary position, a 30 mm cannon in the aft section, and two 12.7 mm machine guns.


https://www.janes.com/defence-news/malaysia...strike-missile/


ayanami_tard
post Aug 4 2022, 10:25 PM

New Member
*
Junior Member
40 posts

Joined: Sep 2009
From: under the moonlight
user posted image


azriel
post Aug 6 2022, 07:18 AM

New Member
*
Newbie
4 posts

Joined: Jan 2012
The first steel cutting ceremony of the Indonesian Navy Arrowhead 140 variant is scheduled next week on August 10th 2022 at PT PAL shipyard.

Let's wait and see.
azriel
post Aug 6 2022, 05:45 PM

New Member
*
Newbie
4 posts

Joined: Jan 2012
Looks like Indonesian Air Force first C-130J-30 Super Hercules is ready for delivery early 2023.



This post has been edited by azriel: Aug 6 2022, 08:54 PM
Mai189
post Aug 6 2022, 07:23 PM

New Member
*
Newbie
0 posts

Joined: Aug 2018


Strange^ That is about USD $ 8.8 billion.

A lot more shoes to drop from this centipede vis a vis the whole gamut of agreements and claims on procurement (but minus clarity on funding).

A long time ago, Msia was into this drama too in wanting to buy X or Y equipment. Many did not materialize and when they do, the numbers are less or FFBNW.
azriel
post Aug 6 2022, 07:58 PM

New Member
*
Newbie
4 posts

Joined: Jan 2012
Credit to AlphaMike.

user posted image
azriel
post Aug 8 2022, 08:04 PM

New Member
*
Newbie
4 posts

Joined: Jan 2012
Indonesian Navy commissioned its 7th Teluk Bintuni Class LST KRI Teluk Calang-524.


azriel
post Aug 11 2022, 07:20 AM

New Member
*
Newbie
4 posts

Joined: Jan 2012
Source reported the first steel cutting ceremony of the Indonesian Navy Arrowhead 140 at PT PAL have been rescheduled to October 2022.

"The contract for construction of 2 Arrowhead 140 for Indonesian Navy has entered effective status since May 2021. Ministry of Defense has paid initial payment to shipbuilder. Schedule for first steel cutting has shifted from August to October 2022."

This post has been edited by azriel: Aug 11 2022, 07:21 AM
Mai189
post Aug 11 2022, 12:11 PM

New Member
*
Newbie
0 posts

Joined: Aug 2018
QUOTE(azriel @ Aug 11 2022, 07:20 AM)
Source reported the first steel cutting ceremony of the Indonesian Navy Arrowhead 140 at PT PAL have been rescheduled to October 2022.

"The contract for construction of 2 Arrowhead 140 for Indonesian Navy has entered effective status since May 2021. Ministry of Defense has paid initial payment to shipbuilder. Schedule for first steel cutting has shifted from August to October 2022."
*
Haha! You are missing the point.

What is impt is not a new hull - plenty of new and upcoming hulls in Asia.

What is impt are the equipment installed on her - sensors, weapon systems, datalinks, unmanned systems, etc.










azriel
post Aug 12 2022, 08:04 PM

New Member
*
Newbie
4 posts

Joined: Jan 2012
New pic of Indonesian Air Force brand new and the first out of 5 units ordered C-130J-30 Super Hercules. Credit to Lockheed Martin.

user posted image

This post has been edited by azriel: Aug 12 2022, 08:06 PM
Dragon bastard
post Aug 13 2022, 06:07 PM

New Member
*
Junior Member
17 posts

Joined: Oct 2021

Any news regarding our LCS?
azriel
post Aug 13 2022, 08:31 PM

New Member
*
Newbie
4 posts

Joined: Jan 2012

atreyuangel
post Aug 13 2022, 08:35 PM

Casual
***
Junior Member
406 posts

Joined: Jun 2007
From: 3°50'**.**"N - 103°16'**.**"E



QUOTE(azriel @ Aug 13 2022, 08:31 PM)
lol media tpi ko sendiri takde

takut kene tanya soklan ka Hisham oi!
azriel
post Aug 13 2022, 08:35 PM

New Member
*
Newbie
4 posts

Joined: Jan 2012


This post has been edited by azriel: Aug 13 2022, 08:49 PM
Raddus
post Aug 13 2022, 08:36 PM

Getting Started
**
Junior Member
239 posts

Joined: Mar 2018

QUOTE(azriel @ Jul 31 2022, 01:06 PM)
PLA J-35 fighter Jet.


*
Is the J35 and FC31 the same aircraft or different?
azriel
post Aug 13 2022, 08:46 PM

New Member
*
Newbie
4 posts

Joined: Jan 2012
QUOTE(Raddus @ Aug 13 2022, 08:36 PM)
Is the J35 and FC31 the same aircraft or different?
*
J-35 is the carrier variant of the FC-31/J-31.

This post has been edited by azriel: Aug 13 2022, 08:47 PM

120 Pages « < 7 8 9 10 11 > » Top
Topic ClosedOptions
 

Change to:
| Lo-Fi Version
0.0296sec    0.46    6 queries    GZIP Disabled
Time is now: 5th December 2025 - 11:25 PM