Title: How to install your spc flooring/ laminate flooring steps by steps?
Hi everyone, Happy Chinese New Year. Today, lets talk about some flooring work you might love to do in your house, either spc/ laminate flooring which is one of the most common topic some of you love to ask me personally.
I will share with you some of our previous work done before, and also how we actually done our installation with guidance. Firstly, pre installation work. The sub floor must be smooth, clean and dry. Dun forget to lay the PE Mat underlayment, a thin foam pad material acting as a vapor barrier to provide moisture from penetrating into your laminate installation. Measure and cut your first piece of flooring with the help of cutter knife. It might be a little challenging while dealing with the corners or door frame as you need to cut the floorboard into desired shape. While laying, dun forget to leave some gap on the first row next to the wall, to allow expansion.
Install the second floorboard and lock it together by clicking them in place. Tap it with a hammer while protect it with a block to secure the installation. Do it steps by steps, slowly but steadily. Lastly, install the skirting by measuring the required length of the edges accordingly, and you are done.
Hope you like our sharing, dun forget to follow our posts and share your experience with us. We will share more in future. Stay tuned.
Feb 3 2022, 11:57 PM
Quote









































0.0263sec
0.72
6 queries
GZIP Disabled