QUOTE(yusiang @ May 31 2018, 04:42 PM)
If you look at the cancelled MRT3 plan, it is quite obvious that half of the proposed line alignment is focused on increasing Bandar Malaysia land value, which is highly dependent on the HSR project.
Anyway I do think that the other half circle(taman desa-mont kiara-sentul) is important to complement existing lines to boost the ridership, so I hope eventually the PH gov will come out with something less bloated at lower cost.
Whether BN or PH, it is matter of time this 486acre land will be developed..it is too prim to be left idle. Unless the TUDM base is still here....Anyway I do think that the other half circle(taman desa-mont kiara-sentul) is important to complement existing lines to boost the ridership, so I hope eventually the PH gov will come out with something less bloated at lower cost.
May 31 2018, 04:58 PM

Quote
0.0485sec
0.57
6 queries
GZIP Disabled