oil price one side, pandemic also doesn't seems to abate. jobs hard to come by, on top of already a risky job, now becomes even risky with this pandemic
Oil & Gas Careers V12 - Upstream & Downstream, Market still slump, slow, snail pace...
Oil & Gas Careers V12 - Upstream & Downstream, Market still slump, slow, snail pace...
|
|
Jan 5 2021, 12:42 AM
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,551 posts Joined: May 2009 |
oil price one side, pandemic also doesn't seems to abate. jobs hard to come by, on top of already a risky job, now becomes even risky with this pandemic
|
|
|
|
|
|
Jan 5 2021, 09:23 AM
|
![]() ![]()
Junior Member
80 posts Joined: Oct 2020 |
QUOTE(contestchris @ Jan 4 2021, 04:37 PM) Guys has Limbayong FPSO project been delayed further? Petronius activity outlook says the project sanction date has been deferred from 2020 to 2022! Limbayong is Greenfield or brownfield?if Greenfield, i don't think it will be delayed because 1 floater (could be limbayong) will start to execute the engineering by mid 2021 and fabrication on late 2021 ![]() |
|
|
Jan 5 2021, 09:34 AM
Show posts by this member only | IPv6 | Post
#5063
|
![]()
Probation
16 posts Joined: Nov 2020 |
QUOTE(contestchris @ Jan 4 2021, 04:37 PM) Guys has Limbayong FPSO project been delayed further? Petronius activity outlook says the project sanction date has been deferred from 2020 to 2022! If I read it correctly, Limbayong should be classified under the greenfield floater project where the bar will start 2021, because I recall that news reported Limbayong also includes SURF tenders The brownfield floater that is due to start in 2022 I not sure what project is that. Not sure what Petronas is saying either on the delayed FpSO from 2020 to 2022. Can anyone help to clarify? Anyway. This new PAO looks worrisome to me, they reduced the outlook substantially back to 2018 Despite higher oil prices |
|
|
Jan 5 2021, 10:01 AM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
3,491 posts Joined: Jan 2013 |
QUOTE(xxxdhonamaria @ Jan 5 2021, 09:23 AM) Limbayong is Greenfield or brownfield? Limbayong Greenfieldif Greenfield, i don't think it will be delayed because 1 floater (could be limbayong) will start to execute the engineering by mid 2021 and fabrication on late 2021 ![]() got 2 major package, 1 is FPSO one more is Pipeline + SPS (3 tenderer in 2020/2019 bid). |
|
|
Jan 6 2021, 12:34 PM
Show posts by this member only | IPv6 | Post
#5065
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
4,864 posts Joined: Nov 2008 |
QUOTE(contestchris @ Jan 4 2021, 04:37 PM) Guys has Limbayong FPSO project been delayed further? Petronius activity outlook says the project sanction date has been deferred from 2020 to 2022! Bid is ongoing, closing this month. “Expected” award in 2Q 2021, barring no other hiccups.This post has been edited by Stamp: Jan 6 2021, 12:41 PM xiaoxiaoshen liked this post
|
|
|
Jan 6 2021, 02:38 PM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
3,491 posts Joined: Jan 2013 |
Any Sarawakian looking job
Looking for Sarawakian candidates to fill in below roles: 1. Technical Support Assistant (Senior & Junior roles) 2. Planner (Senior & Junior Roles) 3. Cost Controller (Senior & Junior Roles) 4. Document Controller (Senior & Junior Roles) 5. Mailing Clerk 6. PR Requirement: * Must be from oil & gas industry. * Current location: Sarawak Candidates with relevant experiences please send updated CV with mention subject to: L.mohanadasan@brunel.net Thank you. |
|
|
|
|
|
Jan 6 2021, 04:01 PM
Show posts by this member only | IPv6 | Post
#5067
|
![]() ![]()
Junior Member
105 posts Joined: Aug 2011 |
QUOTE(ZZMsia @ Jan 6 2021, 09:38 AM) Any Sarawakian looking job I know it says relevant experiences at the end but are there any possible roles for a fresh grad? Asking on behalf of my cousin and also a few friends.Looking for Sarawakian candidates to fill in below roles: 1. Technical Support Assistant (Senior & Junior roles) 2. Planner (Senior & Junior Roles) 3. Cost Controller (Senior & Junior Roles) 4. Document Controller (Senior & Junior Roles) 5. Mailing Clerk 6. PR Requirement: * Must be from oil & gas industry. * Current location: Sarawak Candidates with relevant experiences please send updated CV with mention subject to: L.mohanadasan@brunel.net Thank you. |
|
|
Jan 6 2021, 05:21 PM
|
![]() ![]()
Junior Member
71 posts Joined: Jul 2018 |
|
|
|
Jan 6 2021, 05:52 PM
|
![]()
Newbie
40 posts Joined: Aug 2009 |
|
|
|
Jan 6 2021, 05:56 PM
|
![]()
Newbie
40 posts Joined: Aug 2009 |
|
|
|
Jan 7 2021, 01:38 AM
|
![]() ![]()
Junior Member
80 posts Joined: Oct 2020 |
|
|
|
Jan 7 2021, 10:21 AM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
2,140 posts Joined: Mar 2011 |
|
|
|
Jan 7 2021, 12:04 PM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
4,864 posts Joined: Nov 2008 |
QUOTE(NewBodOnTheBlock @ Jan 6 2021, 05:21 PM) I’m guessing that MISC is devoting all its major resources to carry out MERO 3 FPSO. It’s a very important and strategic project as it opened the lucrative Brazilian FPSO market to MISC. |
|
|
|
|
|
Jan 7 2021, 01:31 PM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
3,491 posts Joined: Jan 2013 |
|
|
|
Jan 7 2021, 01:32 PM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
3,491 posts Joined: Jan 2013 |
|
|
|
Jan 7 2021, 02:19 PM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
2,140 posts Joined: Mar 2011 |
QUOTE(Stamp @ Jan 7 2021, 12:04 PM) I’m guessing that MISC is devoting all its major resources to carry out MERO 3 FPSO. It’s a very important and strategic project as it opened the lucrative Brazilian FPSO market to MISC. I believe MISC resource is good. They are the only Malaysia FPSO company taking the initiative to hire, and they gonna get excellent engineers as many of them are available. |
|
|
Jan 7 2021, 04:58 PM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
5,534 posts Joined: Aug 2011 |
QUOTE(abgkik @ Jan 7 2021, 02:19 PM) I believe MISC resource is good. They are the only Malaysia FPSO company taking the initiative to hire, and they gonna get excellent engineers as many of them are available. Curious about Bumi Armada. They have the 98/2 Kakinada FPSO...should be a pretty major project. But they don't seem to be involved in the engineering/designing of the FPSO? Looks like all the people hired are working for Shapoorji O&G in Singapore. |
|
|
Jan 7 2021, 04:59 PM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
5,534 posts Joined: Aug 2011 |
|
|
|
Jan 7 2021, 05:25 PM
|
![]() ![]()
Junior Member
67 posts Joined: Nov 2019 |
|
|
|
Jan 7 2021, 05:26 PM
|
![]() ![]()
Junior Member
67 posts Joined: Nov 2019 |
|
|
Topic ClosedOptions
|
| Change to: | 0.0406sec
0.53
6 queries
GZIP Disabled
Time is now: 3rd December 2025 - 04:57 PM |