Welcome Guest ( Log In | Register )

46 Pages « < 4 5 6 7 8 > » Bottom

Outline · [ Standard ] · Linear+

Investment TRION KUALA LUMPUR, JALAN SUNGAI BESI, Triple Towers: The Dazzling Urban Centre

views
     
Roy QO Properties
post Dec 10 2018, 12:51 PM

Getting Started
**
Junior Member
127 posts

Joined: Nov 2015


QUOTE(MrBlackie33 @ Dec 10 2018, 01:14 PM)
wah what a big rebate given there even for early bird... any further info for the indicative price?
*
Indicative price estimated 690psf++ btw it's come with partly furnished
DesRed
post Dec 10 2018, 01:42 PM

Delta Echo Sierra Eight Five
*******
Senior Member
2,867 posts

Joined: Dec 2013


QUOTE(Roy QO Properties @ Dec 10 2018, 12:51 PM)
Indicative price estimated 690psf++ btw it's come with partly furnished
*
Before or after the rebates? hmm.gif
Xeralis
post Dec 10 2018, 01:58 PM

Getting Started
**
Junior Member
164 posts

Joined: Aug 2007


QUOTE(DesRed @ Dec 10 2018, 01:42 PM)
Before or after the rebates? hmm.gif
*
It's after rebates
MrBlackie33
post Dec 11 2018, 12:03 PM

Shhhhhhh
*****
Junior Member
834 posts

Joined: Apr 2017
comes with mrt feeder bus summore... maintenance fees definitely wont be cheap here

This post has been edited by MrBlackie33: Dec 11 2018, 12:03 PM


Attached thumbnail(s)
Attached Image
warface
post Dec 11 2018, 02:01 PM

Enthusiast
*****
Senior Member
856 posts

Joined: Dec 2008


further down got taiga, damai and also RC. Market so competitive, that's why need to give more services. On the flip side maintenance fees might be high though
kenty
post Dec 11 2018, 02:29 PM

Getting Started
**
Junior Member
97 posts

Joined: Sep 2011
user posted image

Link bridge start from Media Scott English

user posted image

Distance from Trion to LRT2 entrance is about 850m, Google said only 11min.
To MRT2 link bridge is about 750m

This post has been edited by kenty: Dec 11 2018, 02:37 PM
warface
post Dec 11 2018, 03:05 PM

Enthusiast
*****
Senior Member
856 posts

Joined: Dec 2008


QUOTE(kenty @ Dec 11 2018, 03:29 PM)
user posted image

Link bridge start from Media Scott English

user posted image

Distance from Trion to LRT2 entrance is about 850m, Google said only 11min.
To MRT2 link bridge is about 750m
*
thats why they offer shuttle service to the mrt station biggrin.gif
DesRed
post Dec 11 2018, 09:54 PM

Delta Echo Sierra Eight Five
*******
Senior Member
2,867 posts

Joined: Dec 2013


QUOTE(kenty @ Dec 11 2018, 02:29 PM)
Distance from Trion to LRT2 entrance is about 850m, Google said only 11min.
To MRT2 link bridge is about 750m
*
Please don't exaggerate. It took me around 15 - 20 mins to reach there via walking. Not to mention that its 1km some more, not 800m.

The only good thing is that it is a proper pathway towards the station, but that's about it. And don't be surprised to see a row of cars parked on that pavement when you're near to the covered walkway towards the LRT station.
warface
post Dec 12 2018, 11:02 AM

Enthusiast
*****
Senior Member
856 posts

Joined: Dec 2008


QUOTE(DesRed @ Dec 11 2018, 10:54 PM)
Please don't exaggerate. It took me around 15 - 20 mins to reach there via walking. Not to mention that its 1km some more, not 800m.

The only good thing is that it is a proper pathway towards the station, but that's about it. And don't be surprised to see a row of cars parked on that pavement when you're near to the covered walkway towards the LRT station.
*
If the weather is good okie to walk la, but under hot sun susah la.
Xeralis
post Dec 12 2018, 12:15 PM

Getting Started
**
Junior Member
164 posts

Joined: Aug 2007


QUOTE(MrBlackie33 @ Dec 11 2018, 12:03 PM)
comes with mrt feeder bus summore... maintenance fees definitely wont be cheap here
*
Feeder bus solves it. I've personally walked to the LRT Station, as per @DesRed mentioned, it takes 15 - 20 minutes.
warface
post Dec 12 2018, 12:49 PM

Enthusiast
*****
Senior Member
856 posts

Joined: Dec 2008


QUOTE(Xeralis @ Dec 12 2018, 01:15 PM)
Feeder bus solves it. I've personally walked to the LRT Station, as per @DesRed mentioned, it takes 15 - 20 minutes.
*
good exercise to do everyday biggrin.gif
onnying88
post Dec 12 2018, 12:55 PM

Look at all my stars!!
*******
Senior Member
2,663 posts

Joined: Feb 2008
QUOTE(kenty @ Dec 11 2018, 02:29 PM)
user posted image

Link bridge start from Media Scott English

user posted image

Distance from Trion to LRT2 entrance is about 850m, Google said only 11min.
To MRT2 link bridge is about 750m
*
Waiting someone to attack developer cheating using MRT/LRT walking distance as selling point.

This post has been edited by onnying88: Dec 12 2018, 12:58 PM
CWK79
post Dec 12 2018, 12:58 PM

New Member
*
Junior Member
39 posts

Joined: May 2017
QUOTE(DesRed @ Dec 11 2018, 09:54 PM)
Please don't exaggerate. It took me around 15 - 20 mins to reach there via walking. Not to mention that its 1km some more, not 800m.

The only good thing is that it is a proper pathway towards the station, but that's about it. And don't be surprised to see a row of cars parked on that pavement when you're near to the covered walkway towards the LRT station.
*
Depend walking pathway is save to walk or not. If not, 300 - 500 meters also not able walk
DesRed
post Dec 13 2018, 09:34 AM

Delta Echo Sierra Eight Five
*******
Senior Member
2,867 posts

Joined: Dec 2013


QUOTE(warface @ Dec 12 2018, 11:02 AM)
If the weather is good okie to walk la, but under hot sun susah la.
*
Agreed on that. While it is a proper pathway, it isn't shaded, so do expect to enjoy some sun while walking towards the station. No wonder Binastra went as far as to say that if you don't feel like walking to the CSL LRT/MRT interchange, take the shuttle bus. laugh.gif

QUOTE(onnying88 @ Dec 12 2018, 12:55 PM)
Waiting someone to attack developer cheating using MRT/LRT walking distance as selling point.
*
I saw how MINEST Residences was attacked in that thread regarding the 'walking distance' to MRT but that was more to people calling out the developer for inaccurate marketing. I was driving around there once and there are some parts of Jln Sentul Pasar which doesn't have proper pedestrian pathways to either the Sentul Timur LRT station or the upcoming Sentul West MRT station.

At least in Binastra's case, they marketed it as 'walkable' (because it all boils down to individual preference) but if you don't feel like walking, they provide a shuttle bus option. The important question one should ask is what how does the latter operate. Will it be by frequency or making a quick call at the management office to get the shuttle bus to send you there?

Once the showroom is ready, I'll pop that question to the sales staff there. biggrin.gif

QUOTE(CWK79 @ Dec 12 2018, 12:58 PM)
Depend walking pathway is save to walk or not. If not, 300 - 500 meters also not able walk
*
As I mentioned previously, it is a proper pathway. Just not shaded. That was my experience when I sent my car for servicing at the Nissan Service Centre there and walked to the CSL station after dropping off my car. But I was unfortunate enough to bump into some cars rampantly parking on it near to that station.

Not to mention that there are heavy vehicles on the road frequently due to the myriad of car showrooms, workshops and warehouses in the vicinity.
planc
post Dec 13 2018, 11:56 AM

Regular
******
Senior Member
1,416 posts

Joined: Feb 2015
QUOTE(DesRed @ Dec 13 2018, 08:34 AM)
Agreed on that. While it is a proper pathway, it isn't shaded, so do expect to enjoy some sun while walking towards the station. No wonder Binastra went as far as to say that if you don't feel like walking to the CSL LRT/MRT interchange, take the shuttle bus. laugh.gif
I saw how MINEST Residences was attacked in that thread regarding the 'walking distance' to MRT but that was more to people calling out the developer for inaccurate marketing. I was driving around there once and there are some parts of Jln Sentul Pasar which doesn't have proper pedestrian pathways to either the Sentul Timur LRT station or the upcoming Sentul West MRT station.

At least in Binastra's case, they marketed it as 'walkable' (because it all boils down to individual preference) but if you don't feel like walking, they provide a shuttle bus option. The important question one should ask is what how does the latter operate. Will it be by frequency or making a quick call at the management office to get the shuttle bus to send you there?

Once the showroom is ready, I'll pop that question to the sales staff there. biggrin.gif
As I mentioned previously, it is a proper pathway. Just not shaded. That was my experience when I sent my car for servicing at the Nissan Service Centre there and walked to the CSL station after dropping off my car. But I was unfortunate enough to bump into some cars rampantly parking on it near to that station.

Not to mention that there are heavy vehicles on the road frequently due to the myriad of car showrooms, workshops and warehouses in the vicinity.
*
For minest case, there is a pedestrian bridge at Jalan 4/58A across the ktm track, 800m away S11 Jalan Ipoh MRT station

» Click to show Spoiler - click again to hide... «


This post has been edited by planc: Dec 13 2018, 12:11 PM
warface
post Dec 13 2018, 01:40 PM

Enthusiast
*****
Senior Member
856 posts

Joined: Dec 2008


dont know how will they mange the shuttle later. operation hours, frequencies and all need to take into consideration too.
reychow
post Dec 17 2018, 06:24 PM

Getting Started
**
Junior Member
209 posts

Joined: May 2014
Shuttle bus 30minute one turn.
DesRed
post Dec 17 2018, 11:22 PM

Delta Echo Sierra Eight Five
*******
Senior Member
2,867 posts

Joined: Dec 2013


QUOTE(reychow @ Dec 17 2018, 06:24 PM)
Shuttle bus 30minute one turn.
*
Kinda reminds me of the Bangsar South shuttle bus frequency when I was browsing its page some time back. Also 30 mins.

This post has been edited by DesRed: Dec 17 2018, 11:24 PM
viCtory-
post Dec 22 2018, 02:54 AM

New Member
*
Junior Member
22 posts

Joined: Mar 2012
QUOTE(wanteh55 @ Dec 21 2018, 10:26 PM)
I heard only 5 agency for srlling this project.
Can start booking meh?
*
The agent told me can start placing cheque for queue list then choose unit when official launch, which fall on January but the date TBA
viCtory-
post Dec 22 2018, 03:04 AM

New Member
*
Junior Member
22 posts

Joined: Mar 2012
QUOTE(W.ROOK @ Dec 21 2018, 09:20 PM)
BBB means must be Grade A I guess brows.gif
Agent selling to agent :grin:
*
I actually do review binastra past project. Their workmanship really impress me. 90% look the same from artist impression with completed project. So after the agent brief me for this project I immediate place booking, since they are not going to bank in the cheque untill official launch.

This post has been edited by viCtory-: Dec 22 2018, 03:04 AM

46 Pages « < 4 5 6 7 8 > » Top
 

Change to:
| Lo-Fi Version
0.0274sec    0.57    6 queries    GZIP Disabled
Time is now: 19th December 2025 - 06:52 AM