Welcome Guest ( Log In | Register )

68 Pages « < 43 44 45 46 47 > » Bottom

Outline · [ Standard ] · Linear+

 Inspirasi Mont Kiara, New Development along Jln Kiara 3

views
     
dan_lucifer P
post Aug 6 2019, 11:47 AM

New Member
*
Probation
4 posts

Joined: Aug 2019


Hi Admin,

Was informed all non-bumi units taken?

What will happen to bumi units if unsold? Can non-bumi buy?
iren87 P
post Aug 22 2019, 08:40 PM

New Member
*
Probation
1 posts

Joined: Aug 2019
Hi Admin, can you add me in the whatsapp group? My unit is A-37-5
tanyauchuan
post Aug 27 2019, 12:59 PM

Casual
***
Junior Member
379 posts

Joined: May 2019
workers take VP move in dy๐Ÿ˜… they clear all the temporary room on Ardena land, is that the Ardena start project soon?? if yes then good, can done around inspirasi date.
Pandapanda007 P
post Sep 6 2019, 05:32 PM

New Member
*
Probation
1 posts

Joined: Sep 2019
Can add me in the owners whatsapp group? Unit 38-5
Johnyyip P
post Sep 10 2019, 01:24 AM

New Member
*
Probation
1 posts

Joined: Sep 2019
Hi admin please add me to the whatapps group. My unit is block B 18 3
adison25 P
post Sep 10 2019, 12:12 PM

New Member
*
Probation
3 posts

Joined: Sep 2019


i've booking a unit here and wonder buyers here are for own stay or invest
tanyauchuan
post Sep 12 2019, 12:44 PM

Casual
***
Junior Member
379 posts

Joined: May 2019
user posted image
user posted image

Basement & Ground Floor is done~ land beside(Ardena) also cleared, maybe the Ardena will start progress soon, if, then these 2 building will done in same year or within 12months, wow, if then, Inspirasi + Ardena + Aston Kiara + Richmood will linked all together dy๐Ÿ˜…
rastablank
post Sep 12 2019, 01:22 PM

Enthusiast
*****
Senior Member
951 posts

Joined: Nov 2005
From: Jager Bomb


The more the merrier biggrin.gif
A.B.D.
post Sep 12 2019, 01:59 PM

Look at all my stars!!
*******
Senior Member
2,365 posts

Joined: Aug 2008
if not mistaken inspirasi has a public bypass road beside the condo, connecting JK3 to JK4. saw it from the scale model at property fair few years ago.
phua8
post Sep 12 2019, 04:20 PM

New Member
*
Newbie
32 posts

Joined: Sep 2018
It is difficult, you need to build a bridge across the open channel/big drain.

DBKL's planning is to make Jalan Kiara 4 to be a 6 lanes carriageway. (Became a main road already, continuous from Jalan Segambut)

user posted image

This post has been edited by phua8: Sep 12 2019, 04:34 PM
tanyauchuan
post Sep 13 2019, 02:20 PM

Casual
***
Junior Member
379 posts

Joined: May 2019
QUOTE(A.B.D. @ Sep 12 2019, 01:59 PM)
if not mistaken inspirasi has a public bypass road beside the condo, connecting JK3 to JK4. saw it from the scale model at property fair few years ago.
*
i think nope, coz saw the structure now, the road only enough for Inspirasi use, and JK4 also direct join into Inspirasi(coz funded by MKH about rm7m).

but DBKL Jalan Segambut master plan Phase4(final phase) is JK4, mean in the future, the road of MK join to Jalan Segambut will be JK4 and replace JK3.
tanyauchuan
post Sep 13 2019, 02:24 PM

Casual
***
Junior Member
379 posts

Joined: May 2019
QUOTE(phua8 @ Sep 12 2019, 04:20 PM)
It is difficult, you need to build a bridge across the open channel/big drain.

DBKL's planning is to make Jalan Kiara 4 to be a 6 lanes carriageway. (Became a main road already, continuous from Jalan Segambut)

user posted image
*
haha, about the 6lanes will gg also, coz now the middle of JK4 already done in 2lanes only with both side conrecte high wall, i really dunno how DBKL make it become main road with 6lanes in the future, if only 2lanes for the main road join to Jalan segambut, then future JK4 will more worst than currently JK3๐Ÿ˜…

JK3 become sub road in future can solve the problem of Garden International School problem, reduce the user of JK3.
phua8
post Sep 13 2019, 04:52 PM

New Member
*
Newbie
32 posts

Joined: Sep 2018
Actually, the Jalan Segambut Upgrade Master Plan Phase 4 already/almost completed (contract awarded since Feb 2017). The portion of JK4 in front of 22 MK & Arcoris up to the Sprint Highway are 6 lanes. (Some cars parked at one of the completed lanes, either left or right, Ha ha..) The big issue is Phase 3, elevated highway needed to link with Phase 4.
mangoproperty
post Sep 13 2019, 08:52 PM

Enthusiast
*****
Senior Member
797 posts

Joined: Oct 2015
QUOTE(phua8 @ Sep 13 2019, 04:52 PM)
Actually, the Jalan Segambut Upgrade Master Plan Phase 4 already/almost completed (contract awarded since Feb 2017). The portion of JK4 in front of 22 MK & Arcoris up to the Sprint Highway are 6 lanes. (Some cars parked at one of the completed lanes, either left or right, Ha ha..)  The big issue is Phase 3, elevated highway needed to link with Phase 4.
*
The elevated sprint ? Or jalan Desa Kiara
tanyauchuan
post Sep 14 2019, 01:58 PM

Casual
***
Junior Member
379 posts

Joined: May 2019
QUOTE(phua8 @ Sep 13 2019, 04:52 PM)
Actually, the Jalan Segambut Upgrade Master Plan Phase 4 already/almost completed (contract awarded since Feb 2017). The portion of JK4 in front of 22 MK & Arcoris up to the Sprint Highway are 6 lanes. (Some cars parked at one of the completed lanes, either left or right, Ha ha..)  The big issue is Phase 3, elevated highway needed to link with Phase 4.
*
JK4 completed??
Jalan Segambut master plan phase 4 not yet start๐Ÿ˜… phase 1 done long time ago, jan2020 start phase 2, phase3 in discussing.
now u saw the phase4 is out of master plan, jist MK plan only, if master plan run wont just do half way, and Inspirasi pay rm7million for the 200m also, if it is master plan then why inspirasi need to pay๐Ÿ˜… because phase 4 not yet start but inspirasi need the road so inspirasi pay by itself.

JK4 done 6lanes?? u see my photo is 2lanes or 6lanes first๐Ÿ˜…๐Ÿ˜…๐Ÿ˜… i confirm my eye saw is 2lanes.

user posted image
phua8
post Sep 14 2019, 04:00 PM

New Member
*
Newbie
32 posts

Joined: Sep 2018
QUOTE(tanyauchuan @ Sep 14 2019, 01:58 PM)
JK4 completed??
Jalan Segambut master plan phase 4 not yet start๐Ÿ˜… phase 1 done long time ago, jan2020 start phase 2, phase3 in discussing.
now u saw the phase4 is out of master plan, jist MK plan only, if master plan run wont just do half way, and Inspirasi pay rm7million for the 200m also, if it is master plan then why inspirasi need to pay๐Ÿ˜… because phase 4 not yet start but inspirasi need the road so inspirasi pay by itself.

JK4 done 6lanes?? u see my photo is 2lanes or 6lanes first๐Ÿ˜…๐Ÿ˜…๐Ÿ˜… i confirm my eye saw is 2lanes.

user posted image
*
The photo is which part of JK4 ? (Sorry can't find it)

Go to Google Map now, you can find part of the JK4 is 6 lanes, this falls under the Phase 4's region, further up uncompleted's is Phase 3 and road to Inspirasi.

But I don't know there got another MK plan other than the Master Plan. If the 2 plans are overlapping (at Phase 4's portion), it is a waste of money.

user posted image
tanyauchuan
post Sep 15 2019, 12:42 AM

Casual
***
Junior Member
379 posts

Joined: May 2019
QUOTE(phua8 @ Sep 14 2019, 04:00 PM)
The photo is which part of JK4 ? (Sorry can't find it)

Go to Google Map now, you can find part of the JK4 is 6 lanes, this falls under the Phase 4's region, further up uncompleted's is Phase 3 and road to Inspirasi.

But I don't know there got another MK plan other than the Master Plan. If the 2 plans are overlapping (at Phase 4's portion), it is a waste of money. 

user posted image
*
the photo show behind the Sefina is just 2lanes.

i go DBKL presentation dy, phase 4 is the entire JK4 until under the NKVE bridge.

from Sefina to Inspirasi about 200m road is funded by MKH it own money because they want the selling point of inspirasi link to JK4, the cost them rm7million newspaper reported dy.

Jalan Segambut master plan phase 4 mean JK4 not yet start even discussion also not yet, phase 2 start Jan2020 about rm40m+, phase 3 in dicussing about rm100m+, phase 4 not in disccussing currently.

Google map street view maybe only show until before Sefina, need some update~ my photo show currently JK4 end after Sefina, MKH in progress the 200m end up will till Inspirasi~

yes, not u feel weird, i also feel weird why JK4 under Jalan Segambut master plan phase 4, but the road still build 2lanes & 200m funded by MKH๐Ÿ˜…๐Ÿ˜…๐Ÿ˜…
phua8
post Sep 15 2019, 02:35 PM

New Member
*
Newbie
32 posts

Joined: Sep 2018
QUOTE(tanyauchuan @ Sep 15 2019, 12:42 AM)
the photo show behind the Sefina is just 2lanes.

i go DBKL presentation dy, phase 4 is the entire JK4 until under the NKVE bridge.

from Sefina to Inspirasi about 200m road is funded by MKH it own money because they want the selling point of inspirasi link to JK4, the cost them rm7million newspaper reported dy.

Jalan Segambut master plan phase 4 mean JK4 not yet start even discussion also not yet, phase 2 start Jan2020 about rm40m+, phase 3 in dicussing about rm100m+, phase 4 not in disccussing currently.

Google map street view maybe only show until before Sefina, need some update~ my photo show currently JK4 end after Sefina, MKH in progress the 200m end up will till Inspirasi~

yes, not u feel weird, i also feel weird why JK4 under Jalan Segambut master plan phase 4, but the road still build 2lanes & 200m funded by MKH๐Ÿ˜…๐Ÿ˜…๐Ÿ˜…
*
I attended the Taklimat/Dialog with DBKL too last month.

Not entire JK4 is under Phase 4.

Phase 4 (Yellow) only expansion of the existing JK4 (from Sefina to the South > Jalan Desa Kiara/Sprint Highway)

While Phase 3 (Blue) from Sefina to the North > beneath NKVE bridge to Jalan Lang Emas which is a new road under discussing (a portion of it in JK4).



The 2 lanes road built by MKH could be a temporary solution, it will be expanded when Phase 3 materialized.


user posted image
user posted image

user posted image

This post has been edited by phua8: Sep 15 2019, 02:39 PM
tanyauchuan
post Sep 15 2019, 04:18 PM

Casual
***
Junior Member
379 posts

Joined: May 2019
QUOTE(phua8 @ Sep 15 2019, 02:35 PM)
I attended the Taklimat/Dialog with DBKL too last month.

Not entire JK4 is under Phase 4.

Phase 4 (Yellow) only expansion of the existing JK4 (from Sefina to the South > Jalan Desa Kiara/Sprint Highway)

While Phase 3 (Blue) from Sefina to the North > beneath NKVE bridge to Jalan Lang Emas which is a new road under discussing (a portion of it in JK4).
The 2 lanes road built by MKH could be a temporary solution, it will be expanded when Phase 3 materialized.
user posted image
user posted image

user posted image
*
ya not entire, my meaning is currently the JK4 2lanes with both side high concrete wall, wont be temporary road, temporary road is like kampung๐Ÿ˜… u go JK4 and see the 2lanes then u will know is permanent or temporary๐Ÿ˜… the 2lanes not build by MKH, it already done by DBkL until sefina, MKH 200m is Sefina to Inspirasi only, or u can use measurement tape to measure the 200m๐Ÿ˜…

i suggest u go JK4 and see the road posible become 6lanes in future or not first~๐Ÿ˜…

user posted image

Government 2lanes is from Acoris till Sefina
MKH 2lanes is from Sefina to Inspirasi 200m only as media report
tanyauchuan
post Sep 15 2019, 04:24 PM

Casual
***
Junior Member
379 posts

Joined: May 2019
i saw the DBKL using old plan also, many building no update in the paper plan, u comapre the phase4 n google map, lanes already different now, mean currently JK4 is not under phase4, so when DBKL start discussing phase4 will only relised the road is fixed dy๐Ÿ˜… if want rebuild the road to match phase4 design i guess will waste more money to demolish and re structure, so i guess at the end DBKL will say since the JK4 is done like this dy, so phase 4 will adjust to match the currently condition, wont be DBKL waste so much money to re build it๐Ÿ˜…

68 Pages « < 43 44 45 46 47 > » Top
 

Change to:
| Lo-Fi Version
0.0278sec    0.59    6 queries    GZIP Disabled
Time is now: 11th December 2025 - 11:15 PM