Welcome Guest ( Log In | Register )

Bump Topic Topic Closed RSS Feed
160 Pages « < 3 4 5 6 7 > » Bottom

Outline · [ Standard ] · Linear+

Investment Bandar Rimbayu V4, The Township Nature Perfected, Green Township by IJM Land

views
     
nitromx
post Jun 10 2015, 08:58 AM

On my way
****
Senior Member
532 posts

Joined: Nov 2004



any chimes owner here start their renovation project yet?

jeghui
post Jun 10 2015, 09:10 AM

Look at all my stars!!
*******
Senior Member
2,934 posts

Joined: Dec 2010
QUOTE(eastken @ Jun 10 2015, 08:41 AM)
Sold out. waiting bumi release.
*
Good sign
zzzhhhzzz
post Jun 10 2015, 09:26 AM

Regular
******
Senior Member
1,671 posts

Joined: Apr 2012
how the RA formation and guard house application for Chimes going ?

blahbleh
post Jun 10 2015, 09:35 AM

Regular
******
Senior Member
1,243 posts

Joined: Sep 2005
Have not been following the development status for phase 2 recently. Anybody kind enough to share the latest pictures? Thanks in advance!
k_annwong
post Jun 10 2015, 11:55 AM

Getting Started
**
Junior Member
55 posts

Joined: Feb 2015


Wisteria back linear park is 20ft or 30ft wide?
wong8981
post Jun 10 2015, 12:03 PM

Look at all my stars!!
*******
Senior Member
3,651 posts

Joined: Oct 2010
QUOTE(k_annwong @ Jun 10 2015, 11:55 AM)
Wisteria back linear park is 20ft or 30ft wide?
*
25ft and linear park only applied for type C only.
botack
post Jun 10 2015, 04:54 PM

Casual
***
Junior Member
349 posts

Joined: Jan 2008
From: Puchong/Sunway/Subang Jaya/Shah Alam/Klang


QUOTE(nitromx @ Jun 10 2015, 08:58 AM)
any chimes owner here start their renovation project yet?
*
a couple of my neighbours have started their renovations. Will probably wait for another 1 year to see the progress then only decide. for now, jut move in as it is but my defect list is 2 pages longs, not sure if they could complete it in 30 days. cry.gif
nitromx
post Jun 11 2015, 08:48 AM

On my way
****
Senior Member
532 posts

Joined: Nov 2004



QUOTE(botack @ Jun 10 2015, 04:54 PM)
a couple of my neighbours have started their renovations. Will probably wait for another 1 year to see the progress then only decide. for now, jut move in as it is but my defect list is 2 pages longs, not sure if they could complete it in 30 days. cry.gif
*
can share what are the defects?
how is the respond time from IJM on the defects?
botack
post Jun 11 2015, 11:57 AM

Casual
***
Junior Member
349 posts

Joined: Jan 2008
From: Puchong/Sunway/Subang Jaya/Shah Alam/Klang


QUOTE(nitromx @ Jun 11 2015, 08:48 AM)
can share what are the defects?
how is the respond time from IJM on the defects?
*
first off, my entrance door could not open nor close. it is just stuck there. The entrance door's rubber seal also is not well done. A lot of misaligned tiles at living room, and some crack ones too. A lot of paint chips and wall cracks appeared on living room, dining room, every single room in the house and also at the ceiling above the staircase.

So far, they have been prompt. All the loose fitting has been installed after I told them too do it last Tuesday. I assume, they will start work on those defect list next week. PMO informed me, it will take more than 1 month to complete.
MeToo
post Jun 11 2015, 12:22 PM

Look at all my stars!!
*******
Senior Member
9,333 posts

Joined: May 2009
QUOTE(botack @ Jun 10 2015, 04:54 PM)
a couple of my neighbours have started their renovations. Will probably wait for another 1 year to see the progress then only decide. for now, jut move in as it is but my defect list is 2 pages longs, not sure if they could complete it in 30 days. cry.gif
*
Bro. If ya wanna do some renovation, do it before moving in. Once you move it, its almost impossible to do anything major. Best you can do is some cosmetic works/cabinets. All wet work would be difficult if not impossible.

ps : Bila house warming bro! tongue.gif
MeToo
post Jun 11 2015, 12:23 PM

Look at all my stars!!
*******
Senior Member
9,333 posts

Joined: May 2009
QUOTE(botack @ Jun 11 2015, 11:57 AM)
first off, my entrance door could not open nor close. it is just stuck there. The entrance door's rubber seal also is not well done. A lot of misaligned tiles at living room, and some crack ones too. A lot of paint chips and wall cracks appeared on living room, dining room, every single room in the house and also at the ceiling above the staircase.

So far, they have been prompt. All the loose fitting has been installed after I told them too do it last Tuesday. I assume, they will start work on those defect list next week. PMO informed me, it will take more than 1 month to complete.
*
Loose fittings, paint chips, wall cracks. Those are easily rectified.

But the tiles... they will fix that? Crack ones maybe... but misalignment?

nitromx
post Jun 11 2015, 02:30 PM

On my way
****
Senior Member
532 posts

Joined: Nov 2004



any estimation on kitchen cabinet and wardrobe?

botack
post Jun 11 2015, 04:01 PM

Casual
***
Junior Member
349 posts

Joined: Jan 2008
From: Puchong/Sunway/Subang Jaya/Shah Alam/Klang


QUOTE(MeToo @ Jun 11 2015, 12:22 PM)
Bro. If ya wanna do some renovation, do it before moving in. Once you move it, its almost impossible to do anything major. Best you can do is some cosmetic works/cabinets. All wet work would be difficult if not impossible.

ps : Bila house warming bro!  tongue.gif
*
wait house finish first lor..laugh.gif

ya..but my dad told me, no need so fast gua. easily can move to my parents house if want to do reno later. sweat.gif

QUOTE(MeToo @ Jun 11 2015, 12:23 PM)
Loose fittings, paint chips, wall cracks. Those are easily rectified.

But the tiles... they will fix that? Crack ones maybe... but misalignment?
*
yeah, I am not sure about that too, went to another house today to see if it is only my house that is affected. it looks like it is was purposely build like that so that water can go to the water hole in the kitchen. but the house I compared was not as bad as mine.
MeToo
post Jun 11 2015, 04:10 PM

Look at all my stars!!
*******
Senior Member
9,333 posts

Joined: May 2009
QUOTE(botack @ Jun 11 2015, 04:01 PM)
wait house finish first lor..laugh.gif

ya..but my dad told me, no need so fast gua. easily can move to my parents house if want to do reno later. sweat.gif
yeah, I am not sure about that too, went to another house today to see if it is only my house that is affected. it looks like it is was purposely build like that so that water can go to the water hole in the kitchen. but the house I compared was not as bad as mine.
*
Bro.. I know you can move to another house in the time being... but... your furniture? Stuff? etc? I'm sure you have moved before and you know how disruptive it can be....

Ohh.... tiles slanting towards the drain opening... usually it should be very subtle.. maybe u have some pics for us?
botack
post Jun 11 2015, 04:36 PM

Casual
***
Junior Member
349 posts

Joined: Jan 2008
From: Puchong/Sunway/Subang Jaya/Shah Alam/Klang


QUOTE(MeToo @ Jun 11 2015, 04:10 PM)
Bro.. I know you can move to another house in the time being... but... your furniture? Stuff? etc? I'm sure you have moved before and you know how disruptive it can be....

Ohh.... tiles slanting towards the drain opening... usually it should be very subtle.. maybe u have some pics for us?
*
unfortunately, no pictures since been very busy with work now. sad.gif

I know, but need to survey around for design, right now, only 1 contractor is doing all the renovations and I could only see same design for all 12 houses that they have done. need more time to think. laugh.gif
MeToo
post Jun 11 2015, 04:47 PM

Look at all my stars!!
*******
Senior Member
9,333 posts

Joined: May 2009
QUOTE(botack @ Jun 11 2015, 04:36 PM)
unfortunately, no pictures since been very busy with work now. sad.gif

I know, but need to survey around for design, right now, only 1 contractor is doing all the renovations and I could only see same design for all 12 houses that they have done. need more time to think. laugh.gif
*
Try here http://www.habitat-my.com/

You can see which ID does the design, and easily engage them yourself
Dragonfly2014
post Jun 11 2015, 11:16 PM

Casual
***
Junior Member
482 posts

Joined: Oct 2014
Anyone with the plan to use full solar energy?
Share share the cost of it pls.
Maybe worth the money for long term I m thinking..
jeghui
post Jun 12 2015, 12:20 AM

Look at all my stars!!
*******
Senior Member
2,934 posts

Joined: Dec 2010
The solar panel not enough to power rooms? Only water heater?
Dragonfly2014
post Jun 12 2015, 10:40 AM

Casual
***
Junior Member
482 posts

Joined: Oct 2014
QUOTE(jeghui @ Jun 12 2015, 12:20 AM)
The solar panel not enough to power rooms? Only water heater?
*
The solar panel come with IJM is only for bathroom water heater, not even to kitchen faucet.
For full house I think we need more panel and batteri..

Anyone can share what is the requirement for full house?
mingyew
post Jun 12 2015, 10:52 AM

Look at all my stars!!
*******
Senior Member
4,177 posts

Joined: Jan 2003
QUOTE(Dragonfly2014 @ Jun 12 2015, 10:40 AM)
The solar panel come with IJM is only for bathroom water heater, not even to kitchen faucet.
For full house I think we need more panel and batteri..

Anyone can share what is the requirement for full house?
*
The solar water heater is different with solar power.

In malaysia, only can install solar power and sell back to tnb.

160 Pages « < 3 4 5 6 7 > » Top
Topic ClosedOptions
 

Change to:
| Lo-Fi Version
0.0308sec    0.59    6 queries    GZIP Disabled
Time is now: 6th December 2025 - 01:04 PM