QUOTE(suppinfresh @ Dec 8 2014, 07:24 PM)
Supp Kor. Ya, its almost or equivalent to cluster semi d price of 2A and 2B. 8A ( 20x70 ) corner all 22x70 + 20 ft extra land thus 42x70 and built up 2597 sq ft. I think price is RM 930k onwards, not RM 850k
For 2A ( 32x70 ) and 2B ( 32x75 ) both average RM 900k plus. But built up 2355 sq ft and 2395 sq ft.
Some would prefer cluster semi d status or buyinh the idea of gateless and willing to take shorter extra land.
Some would prefer to be the king of the smaller forest and take the bigger 200 sq ft built up but many would opt for the extra 20" ft land for gardening or landscaping.
In this case, I am a family of 2, would go for Cluster bcz 2300 sq ft built up sufficient for me and 10" land is sufficient for me too. Else, I prefer 10-15 ft max end lot of 8A, almost same price but bigger built up.
Dec 9 2014, 10:19 AM

Quote
0.0283sec
0.42
6 queries
GZIP Disabled