Ask me anything abt Construction Industry!, Q&A
|
TSiwubpreve
|
Feb 16 2015, 11:04 PM
|
|
QUOTE(mrPOTATO @ Jan 19 2015, 10:36 PM) my condo keep cracking here there, plastered cracks crack again, then pipe leak inside wall. swimmin pool after repair leak again. What is happening ? is it foundation problem ? very minor crack? like hairline crack? very likely is plastering issue more la. if foundation issue, the crack would be very big.
|
|
|
|
|
|
TSiwubpreve
|
Feb 16 2015, 11:06 PM
|
|
QUOTE(glamour @ Jan 20 2015, 10:43 PM) Bought a new home. Staying for almost one year. Still no telephone line. Check with developer. He say they already all the form to Telekom. Just waiting telekom to fix the post. Just wondering why it takes so long for Telekom to install phone and Internet. ic, to telekom it's not viable to install at ur area. that's why they don't wanna / reluctant open up line for ur area. unless they have enough potential subscriber la. always like this.
|
|
|
|
|
|
TSiwubpreve
|
Feb 16 2015, 11:07 PM
|
|
QUOTE(prophetjul @ Jan 21 2015, 10:32 AM) How much to build a single carriageway highway in Sabah per km? measure by area, square meter m2 1. at klang valley it is about RM60 / m2. if 1 carriageway wide is 4m, then 1km = 1000m x 4m x RM60 = RM240,000
|
|
|
|
|
|
TSiwubpreve
|
Feb 16 2015, 11:08 PM
|
|
QUOTE(kobeineken @ Jan 21 2015, 11:36 AM) can u pm me the mix design for all concrete grades? refer to British Standard 5950. can download online 1.
|
|
|
|
|
|
TSiwubpreve
|
Feb 16 2015, 11:09 PM
|
|
QUOTE(ycs @ Feb 2 2015, 02:48 PM) must electrical wires be always in plastic conduits if embedded inside walls? i want to install extra point from my pillar light point to other spots along same wall, so thinking to just run thicker wires on top edge and then brick/plaster it up u can expose also la if u want. not aesthetic. however if u wanna expose those conduit u need to use galvanized conduit but not plastic. plastic only allow to be embedded inside concrete / plaster.
|
|
|
|
|
|
TSiwubpreve
|
Feb 16 2015, 11:11 PM
|
|
QUOTE(pokie182 @ Feb 4 2015, 11:49 PM) what is the market rate for labour wages per hour? Those indo and bangla at site. I suspect the site staff makan duit company by overcharging the workers wages. unskilled usually is RM8 la. RM8 is pay to agent who provide u bangla most of the time. then they pay that bangla RM4 per hour
|
|
|
|
|
|
TSiwubpreve
|
Feb 16 2015, 11:11 PM
|
|
QUOTE(xbbshampoo @ Feb 9 2015, 02:20 PM) any nice construction cost estimation software to recommend or not?  Microsoft Excel the best. true story bro.
|
|
|
|
|
|
TSiwubpreve
|
Feb 16 2015, 11:12 PM
|
|
QUOTE(shadow_walker @ Feb 10 2015, 02:53 PM) because it's cheap and 5 stars! 5 stars ANCAP mang. where u can get 5 starts at this price?
|
|
|
|
|
|
TSiwubpreve
|
Feb 16 2015, 11:14 PM
|
|
QUOTE(Yello_page @ Feb 11 2015, 12:49 PM) Hi TS, im going to do renovation in office soon and i would like to put Vinyl flooring. Just want to ask can the vinyl glue to the floor? Because i concern about the edge of the vinyl, especially in the mddle of walkway, can collect dust and pple can kick it and koyak. Isit expensive?? Any other cheaper method beside tiles, because the office is just temporary, maybe 2 or 3 years  for office why not using carpet tile? it won't be so prune to dirty like vinyl.
|
|
|
|
|
|
TSiwubpreve
|
Feb 16 2015, 11:15 PM
|
|
QUOTE(professor_snape @ Feb 11 2015, 07:46 PM) nowdays, ee can see a lot of people building or renovate their home into 3 storey house. why not build a basement and 2 story house? basement can make a sound proof room. good for karaoke, playing games or setting a home made cinema. simply because of money. build basement is high cost and time consuming, a lot of temporary work require to build the basement which take up a lot of construction time and money. longer construction period, u need to pay more wages too to those competent personnel who build the house.
|
|
|
|
|
|
TSiwubpreve
|
Feb 16 2015, 11:16 PM
|
|
QUOTE(kamfoo @ Feb 16 2015, 10:53 PM) hallo r u contractor....maybe want to make sexy porch what kind of porch? for put car 1?
|
|
|
|
|
|
TSiwubpreve
|
Feb 17 2015, 09:23 AM
|
|
QUOTE(kamfoo @ Feb 16 2015, 11:19 PM) i'm not contractor, just share what i know here nia.
|
|
|
|
|
|
TSiwubpreve
|
Feb 17 2015, 09:23 AM
|
|
QUOTE(Kennyyl @ Feb 16 2015, 11:30 PM) hi, are you a contractor? you do you own business? nope. i'm not. just share what i know nia.
|
|
|
|
|
|
TSiwubpreve
|
Feb 24 2015, 04:21 PM
|
|
QUOTE(kamfoo @ Feb 22 2015, 01:43 AM) will gst big impact constructer industry.? especialiy material... impact final user which is house buyer only. true story.
|
|
|
|
|
|
TSiwubpreve
|
Feb 24 2015, 04:22 PM
|
|
QUOTE(owenwong84 @ Feb 24 2015, 11:53 AM) say i dun have building knowledge at all. Can i be a contractor ? can. u need to hire a pro as mastermind behind. it's abt how u manage ur business. have construction knowledge is an advantage.
|
|
|
|
|
|
TSiwubpreve
|
Feb 24 2015, 04:35 PM
|
|
QUOTE(jack3218 @ Feb 24 2015, 04:26 PM) sorry for the off topic, any job recommended in electrical project engineer or relavent having 1 years plus experience. Or any good company i can look for ? consultant? jrp, ndy, meinhardt. consider big firm and good for gain experience here. contractor? secm good for job learning experience as mostly big project
|
|
|
|
|
|
TSiwubpreve
|
Mar 11 2015, 08:32 AM
|
|
QUOTE(jack3218 @ Feb 24 2015, 05:59 PM) SIr another question, When consultant issue an EI to contractor. Can the contractor come out with the quotation and discuss the rate (finalized the price)before work is carried out? QUOTE(MishimaZ @ Mar 10 2015, 12:29 PM) Depends on on the instructions..... It is either up to the contractor to absorb the costs or discuss the variation orders which materials will be based on market price. In the end see how the changes affects the works.... contractor have to carry out the work at his best endeavour even though the price not yet finalize. it is because contractor signed the agreement that they allow engineer/consultant to instruct them to work and they will carry out upon the instruction given. I know this seems unfair but the fact is contactor didn't challenge this clause while signing the agreement, so it's actually fair since contractor accepted that agreement to obey instruction. when come to cost wise, what a competent contractor would do is get competitive pricing in the market and client can't challenge the price is this is competitive market price. hence as a contractor u have to be very competent else in risk of big rugi
|
|
|
|
|
|
TSiwubpreve
|
Mar 11 2015, 10:46 AM
|
|
QUOTE(eksk @ Mar 11 2015, 10:38 AM) why ar the construction site usually go the small tokong... u believe in it? how about the myanmar or bangladeshi worker,, how do they fell about it.. that's is datokong  it's just Chinese superstitious believe and everyone buy it. basically u do the work at that ground so u must ask for permission and pray for safe and smooth progress. even Japan and Korean contractor also buy into this idea. but some because of the client (developer) is Chinese so they did that to ease their mind la.
|
|
|
|
|
|
TSiwubpreve
|
Mar 12 2015, 09:43 AM
|
|
QUOTE(7up @ Mar 12 2015, 09:16 AM) i want to change my aluminium window frame rubber. somehow it looks it melted and is sticky. How? don't think these rubber can be buy anyway. only those aluminium subcontractor have la. that thing called gasket. maybe u try go hardware shop ask if they selling windows gasket. take note that those gasket have variety of profile
|
|
|
|
|
|
TSiwubpreve
|
Mar 12 2015, 02:47 PM
|
|
QUOTE(herojack41 @ Mar 12 2015, 02:37 PM) build 1 house.....cost usually how much? no idea. depend how big the house bro
|
|
|
|
|