QUOTE(Moochie @ Jun 16 2019, 10:05 PM)
the sky is the limitAsk me anything abt Construction Industry!, Q&A
Ask me anything abt Construction Industry!, Q&A
|
|
Jun 21 2019, 01:15 PM
Return to original view | Post
#481
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,829 posts Joined: Mar 2013 |
|
|
|
|
|
|
Sep 25 2019, 02:08 PM
Return to original view | Post
#482
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,829 posts Joined: Mar 2013 |
|
|
|
Dec 3 2019, 09:32 PM
Return to original view | IPv6 | Post
#483
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,829 posts Joined: Mar 2013 |
QUOTE(melissachoon @ Dec 3 2019, 03:50 PM) So, I have almost no clue about construction process. However, since I am planning to buy a house in the near future, I feel like I should know a little bit about the process so I don't get duped (per se). So, after you sign the SPA, what are the developer's next steps in construction? I've heard of a Schedule. But, I forgot what Schedule was that and also what entails the Schedule. Would really appreciate your thoughts and help! what schedule u talking about? for buyer usually just pay when developer claim the money via stage completion |
|
|
Dec 3 2019, 11:58 PM
Return to original view | IPv6 | Post
#484
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,829 posts Joined: Mar 2013 |
|
|
|
Feb 2 2020, 11:25 AM
Return to original view | Post
#485
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,829 posts Joined: Mar 2013 |
QUOTE(Cheehen @ Feb 2 2020, 11:04 AM) I'm a fresh graduate with Bachelor's of Hons Civil Engineering with kinda low cgpa (2.4) average C+ from Unviersiti Tunku Abdul Rahman (UTAR). Currently, i'm working in a china construction company but i'm working in unrelated field such as M&E drafter or as an assistant M&E coordinator. I am planning to get professional engineer title and IR title in coming future. So, i am thinking to switch job but i quite scare about my cgpa would not be accept by other engineering firm or construction industry. Any suggestion for me? Btw, i'm from Malaysia. u will be fine. with with c&s consultant will do? |
|
|
Feb 2 2020, 11:41 AM
Return to original view | Post
#486
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,829 posts Joined: Mar 2013 |
QUOTE(Cheehen @ Feb 2 2020, 11:36 AM) yes. i hope that i will able to join c&s consultant and gain more knowledge about structural engineering. Currently, i know how to use AutoCad. I have great interest in BIM such as revit but still learning how to use it. learning that software is advantage but not a must in consultant field. coz cad operator know much better than u but they not asking for high salary. what they don't know is they don't know how to design only. |
|
|
|
|
|
Feb 18 2020, 12:50 AM
Return to original view | IPv6 | Post
#487
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,829 posts Joined: Mar 2013 |
QUOTE(dy_kc@yahoo.com @ Feb 17 2020, 11:53 PM) Hi guys, u can ask from developer. they have keep as built drawing.Can I know whether we can get c&s drawing from developer or architect for free after purchasing a new house? Wanted to have a clear look at the beams drawing to plan for renovation but developer say then don't provide & must buy from the architect. Is it true? Or how much it will cost me for that drawigs. Needed your advise. Thanks |
|
|
Feb 18 2020, 07:54 PM
Return to original view | IPv6 | Post
#488
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,829 posts Joined: Mar 2013 |
|
|
|
Mar 13 2020, 07:20 PM
Return to original view | Post
#489
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,829 posts Joined: Mar 2013 |
QUOTE(kinni @ Mar 13 2020, 07:01 PM) Says I have 4 units shop lot and planning to remove 2 out of 4 staircase to make the space larger. But may I know is it legal to remove in order to get bomba approval or what should I do to get the approval from bomba?thanks can refer to ubbl for info. staircase for escape have maximum span prior additional staircase require![]() |
|
|
May 14 2020, 04:27 PM
Return to original view | Post
#490
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,829 posts Joined: Mar 2013 |
|
|
|
May 17 2020, 09:37 PM
Return to original view | Post
#491
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,829 posts Joined: Mar 2013 |
|
|
|
May 17 2020, 11:05 PM
Return to original view | IPv6 | Post
#492
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,829 posts Joined: Mar 2013 |
|
|
|
Jun 3 2020, 09:17 AM
Return to original view | Post
#493
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,829 posts Joined: Mar 2013 |
|
|
|
|
|
|
Aug 5 2020, 12:52 PM
Return to original view | Post
#494
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,829 posts Joined: Mar 2013 |
QUOTE(GIVEMEABREAK @ Aug 5 2020, 12:04 PM) Hi iwubpreve what defect is that first? provided this is latent defect, yes can complain to developer. if they ignore then need took legal actionI need help with latent defect report filing? what is the procedure and how do i file it against the developer. The reason is because i am witnessing defects post the DLP and the developer is ignoring it. With little research i found about the Limitation Act 1953 and i am not sure if this comes under the KPKT tribunal. Thanks in advance razma3534 liked this post
|
|
|
Aug 6 2020, 09:03 AM
Return to original view | Post
#495
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,829 posts Joined: Mar 2013 |
QUOTE(GIVEMEABREAK @ Aug 6 2020, 08:21 AM) The defects are water leaking caused by rain water drain pipe which is installed inside the wall. The only way to check this is by hacking the plaster ceiling near it. rwdp collecting water from roof. so this pipe belong to management. so management have the responsibility to fix this.Legal action meaning that i need to hire my own lawyer ? base on strata title acts, if the pipe is meant to serve ur unit, its ur responsibility after DLP. so this rwdp apparently is collecting rainwater and it should be a common property. management should fix this. |
|
|
Nov 7 2020, 06:42 PM
Return to original view | Post
#496
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,829 posts Joined: Mar 2013 |
QUOTE(iOrange @ Nov 7 2020, 05:08 PM) hi i would like to ask generally how long does it take for a piling process to complete? the said project is a 40 floor condo. super structure 2 years. so piling 1 year plus. should be not a problem to deliver on time.it has been 1 year since i signed the snp and the estimated completion time is 48 months. so far from what i see they are still doing the underground work, is that normal? iOrange liked this post
|
| Change to: | 0.0217sec
0.90
7 queries
GZIP Disabled
Time is now: 24th November 2025 - 11:24 PM |