Welcome Guest ( Log In | Register )

85 Pages « < 41 42 43 44 45 > » Bottom

Outline · [ Standard ] · Linear+

 Bandar Puteri Bangi

views
     
TSmes23
post May 12 2015, 05:34 PM

Casual
***
Junior Member
393 posts

Joined: Jul 2009
QUOTE(zzzhhhzzz @ May 12 2015, 04:35 PM)
anyone got any leaks from the SA on the possible price of ph2 terrace ?
*
I think as advertise today at The Star...price from RM748,800
TSmes23
post May 12 2015, 05:45 PM

Casual
***
Junior Member
393 posts

Joined: Jul 2009
user posted image

The show unit currently in progress. SA told launch on 23 & 24 May 2015.
secret recipe
post May 12 2015, 05:47 PM

Getting Started
**
Junior Member
285 posts

Joined: Jul 2012
QUOTE(mes23 @ May 12 2015, 05:34 PM)
I think as advertise today at The Star...price from RM748,800
*
serv apmt boss?
PeriPeri2014
post May 12 2015, 07:28 PM

Look at all my stars!!
*******
Senior Member
8,226 posts

Joined: Jul 2014
From: Kuala Lumpur


QUOTE(mes23 @ May 12 2015, 05:34 PM)
I think as advertise today at The Star...price from RM748,800
*
price increase?? with similar BU or smaller BU ??
brensek
post May 12 2015, 09:16 PM

Regular
******
Senior Member
1,184 posts

Joined: Jan 2015
The Terresse 2 @ Bandar Puteri, Bangi
24 X 70 | 2406 sqft | 4+1 R , 4 B
Total units : 118
Selling price Min : RM 748,800 - Max RM 1007,800


user posted image
PeriPeri2014
post May 12 2015, 10:10 PM

Look at all my stars!!
*******
Senior Member
8,226 posts

Joined: Jul 2014
From: Kuala Lumpur


boss brensek, discount 30K or 50K this time p2??
TSmes23
post May 12 2015, 10:41 PM

Casual
***
Junior Member
393 posts

Joined: Jul 2009
QUOTE(PeriPeri2014 @ May 12 2015, 07:28 PM)
price increase?? with similar BU or smaller BU ??
*
Built up less 100 sq.ft. from The Terresse Phase 1. Phase 1 got another 7 units when visiting their office today.

TSmes23
post May 12 2015, 10:43 PM

Casual
***
Junior Member
393 posts

Joined: Jul 2009
QUOTE(PeriPeri2014 @ May 12 2015, 10:10 PM)
boss brensek, discount 30K or 50K this time p2??
*
Heard it...non bumi 20K rebate.
zzzhhhzzz
post May 12 2015, 11:27 PM

Regular
******
Senior Member
1,671 posts

Joined: Apr 2012
how much was phase 1 after discount ?
TSmes23
post May 13 2015, 12:14 AM

Casual
***
Junior Member
393 posts

Joined: Jul 2009
QUOTE(zzzhhhzzz @ May 12 2015, 11:27 PM)
how much was phase 1 after discount ?
*
Rebate to non bumi RM29K

Jasoncat
post May 13 2015, 07:47 AM

Look at all my stars!!
*******
Senior Member
9,913 posts

Joined: Jun 2014
QUOTE(mes23 @ May 13 2015, 12:14 AM)
Rebate to non bumi RM29K
*
Terresse 1 (22×80) was selling for RM728.8k (before discount) for bigger built up of 2501 sf right? Seems that the increase for Terresse 2 is not significant.

This post has been edited by Jasoncat: May 13 2015, 09:16 AM
zzzhhhzzz
post May 13 2015, 08:22 AM

Regular
******
Senior Member
1,671 posts

Joined: Apr 2012
QUOTE(Jasoncat @ May 13 2015, 07:47 AM)
Terresse 1 (24×80) was selling for RM728.8k (before discount) for bigger built up of 2501 sf right?  Seems that the increase for Terresse 2 is not significant.
*
i thought phase 1 is 22x80 ?
PeriPeri2014
post May 13 2015, 08:31 AM

Look at all my stars!!
*******
Senior Member
8,226 posts

Joined: Jul 2014
From: Kuala Lumpur


QUOTE(zzzhhhzzz @ May 13 2015, 08:22 AM)
i thought phase 1 is 22x80 ?
*
Yes. is 22x80 BU 2500+ 30K rebate Nett Price 700K 3 installment for DPayment each 6 month nod.gif nod.gif
pietired
post May 13 2015, 08:42 AM

New Member
*
Junior Member
36 posts

Joined: Oct 2008


Normally how long would the lawyer require to prepare snp agreement after loan approved?
Jasoncat
post May 13 2015, 09:15 AM

Look at all my stars!!
*******
Senior Member
9,913 posts

Joined: Jun 2014
QUOTE(zzzhhhzzz @ May 13 2015, 08:22 AM)
i thought phase 1 is 22x80 ?
*
Oh yes, it's 22×80. My mistake.
TSmes23
post May 13 2015, 09:25 AM

Casual
***
Junior Member
393 posts

Joined: Jul 2009
QUOTE(Jasoncat @ May 13 2015, 09:15 AM)
Oh yes, it's 22×80. My mistake.
*
Phase 1
Lot size - 22 x 80
Net Built up - 2,510 sq.ft.

Phase 2
Lot size - 24 x 70
Net Built up - 2,406 sq.ft.

The internal building and car porch look similar but the different can be seen at foyer area (first floor) and driveway.

johnobimikel
post May 14 2015, 01:21 PM

Getting Started
**
Junior Member
71 posts

Joined: Jan 2015
QUOTE(mes23 @ May 13 2015, 09:25 AM)
Phase 1
Lot size - 22 x 80
Net Built up - 2,510 sq.ft.

Phase 2
Lot size - 24 x 70
Net Built up - 2,406 sq.ft.

The internal building and car porch look similar but the different can be seen at foyer area (first floor) and driveway.
*
Attached Image Attached Image


Attached thumbnail(s)
Attached Image
reddevil87
post May 16 2015, 05:35 PM

Getting Started
**
Junior Member
164 posts

Joined: Jun 2013
QUOTE(johnobimikel @ May 14 2015, 01:21 PM)
Attached Image Attached Image
*
Hi bro, which block is going to be launched for Almyra? smile.gif
johnobimikel
post May 16 2015, 10:22 PM

Getting Started
**
Junior Member
71 posts

Joined: Jan 2015
[quote=reddevil87,May 16 2015, 05:35 PM]
Hi bro, which block is going to be launched for Almyra? smile.gif
*

[/quote
The email stated block 2 which consist of type a,b and c. If im not mistaken,only 2 out of 4 that have type b and c. So remaining two that will be launch after this phase will only have type a.

This post has been edited by johnobimikel: May 16 2015, 10:36 PM
PeriPeri2014
post May 16 2015, 10:38 PM

Look at all my stars!!
*******
Senior Member
8,226 posts

Joined: Jul 2014
From: Kuala Lumpur


[quote=johnobimikel,May 16 2015, 10:22 PM]
[quote=reddevil87,May 16 2015, 05:35 PM]
Hi bro, which block is going to be launched for Almyra? smile.gif
*

[/quote
The email stated block 2 which consist of type a,b and c. If im not mistaken,only 2 out of 4 that have type b and c. So remaining two that will be launch after this phase after will only have type a.
*

[/quote]


BBB for phase 2?? Franky to say, i also like thier Service apartment with low entry price and low density.....thinking wanna get a unit smile.gif smile.gif

85 Pages « < 41 42 43 44 45 > » Top
 

Change to:
| Lo-Fi Version
0.0280sec    0.65    6 queries    GZIP Disabled
Time is now: 11th December 2025 - 09:38 AM