Welcome Guest ( Log In | Register )

87 Pages « < 17 18 19 20 21 > » Bottom

Outline · [ Standard ] · Linear+

 Ken Rimba New Green Township, [Sponsored]

views
     
noproblem
post Oct 7 2013, 12:33 PM

Getting Started
**
Junior Member
173 posts

Joined: Jun 2006
QUOTE(joeec @ Oct 5 2013, 11:02 PM)
I'm planning to extend my kitchen soon too.
Did anyone extend and use the 4 feet extra to be a wet kitchen? Or did u guys break the wall entirely and use as one big kitchen with wet/dry kitchen combined?
Just worried about the smoke going into living hall if I dun separate the wet from the dry.
Appreciate all advice, thanks!
*
Break it. Make wet kitchen 8 feet and dry kitchen 7 feet (use sliding door for partition). Install hob in wet kitchen.
pk330
post Oct 7 2013, 12:59 PM

New Member
*
Junior Member
25 posts

Joined: Sep 2013
how much for b
pk330
post Oct 7 2013, 01:02 PM

New Member
*
Junior Member
25 posts

Joined: Sep 2013
how much for break n not to break? thinking of the smoke also..
joeec
post Oct 7 2013, 07:17 PM

Getting Started
**
Junior Member
97 posts

Joined: Jul 2013
QUOTE(noproblem @ Oct 7 2013, 12:33 PM)
Break it. Make wet kitchen 8 feet and dry kitchen 7 feet (use sliding door for partition). Install hob in wet kitchen.
*
It's a good idea. But just worried about the cost. Installing a glass sliding door that size should cost quite a bit.

Have u done urs already? Mind to share how much it costs u?
noproblem
post Oct 8 2013, 11:39 AM

Getting Started
**
Junior Member
173 posts

Joined: Jun 2006
QUOTE(joeec @ Oct 7 2013, 07:17 PM)
It's a good idea. But just worried about the cost. Installing a glass sliding door that size should cost quite a bit.

Have u done urs already? Mind to share how much it costs u?
*
yes did it. Full extension about 20k, sliding door 2.6k++.
kheechow
post Oct 8 2013, 03:20 PM

New Member
*
Junior Member
20 posts

Joined: May 2012
anyone knows where to buy the white horse floor tiles in the living room?
joeec
post Oct 8 2013, 06:03 PM

Getting Started
**
Junior Member
97 posts

Joined: Jul 2013
QUOTE(noproblem @ Oct 8 2013, 11:39 AM)
yes did it. Full extension about 20k, sliding door 2.6k++.
*
Thank for info!
Wow that costs quite a bit. 20k is just to extend downstairs, or it includes upstairs as well?
noproblem
post Oct 8 2013, 07:42 PM

Getting Started
**
Junior Member
173 posts

Joined: Jun 2006
QUOTE(joeec @ Oct 8 2013, 06:03 PM)
Thank for info!
Wow that costs quite a bit. 20k is just to extend downstairs, or it includes upstairs as well?
*
Downstairs, not include tiles cost.
vivalegian
post Oct 10 2013, 03:28 PM

Getting Started
**
Junior Member
56 posts

Joined: Jul 2013


hi friends....any1 here knows...how long the access card will be done after registered?
noproblem
post Oct 10 2013, 08:31 PM

Getting Started
**
Junior Member
173 posts

Joined: Jun 2006
QUOTE(vivalegian @ Oct 10 2013, 03:28 PM)
hi friends....any1 here knows...how long the access card will be done after registered?
*
Usually 5 working days or 1 week.
stevenkkt
post Oct 17 2013, 10:49 AM

On my way
****
Senior Member
600 posts

Joined: Dec 2008


QUOTE(vivalegian @ Oct 10 2013, 03:28 PM)
hi friends....any1 here knows...how long the access card will be done after registered?
*
I did mine with previous slow motion admin girl. Took me more than 1 week, nearly two weeks. I'm glad that she has left, it was quite painful to liaise with her.

I think with the new admin person should be within 5 days or 1 week. Let us know how long it takes you to get yours. smile.gif
max2k
post Oct 17 2013, 02:12 PM

Getting Started
**
Junior Member
236 posts

Joined: Jul 2006
Is those students still renting the place there ? Does flood still happen at the junction ?
forever1979
post Oct 21 2013, 05:10 PM

Look at all my stars!!
*******
Senior Member
2,854 posts

Joined: Jul 2013


QUOTE(max2k @ Oct 17 2013, 02:12 PM)
Is those students still renting the place there ?  Does flood still happen  at the junction ?
*
Student will be there for a while as tenancy normally sign for at least one year.

But i foreseen a lots would not renew due to
a. Higher demand e.g the new General hospital staff. Thus students would not be prefer by owners
b. Higher rental as students cannot afford (in many case, student need to pay premium. eg. now around RM1600 to RM1800 maybe)
c. Better control from the management in term of car parking and access card. Student may think is quite troublesome every time need to gain entrance.
d. Some owner who rented out to students is not for own stay, thus after tenancy expired, maybe will sell the house.

joeec
post Oct 22 2013, 12:25 PM

Getting Started
**
Junior Member
97 posts

Joined: Jul 2013
QUOTE(forever1979 @ Oct 21 2013, 05:10 PM)
Student will be there for a while as tenancy normally sign for at least one year.

But i foreseen a lots would not renew due to
a. Higher demand e.g the new General hospital staff. Thus students would not be prefer by owners
b. Higher rental as students cannot afford (in many case, student need to pay premium. eg. now around RM1600 to RM1800 maybe)
c. Better control from the management in term of car parking and access card. Student may think is quite troublesome every time need to gain entrance.
d. Some owner who rented out to students is not for own stay, thus after tenancy expired, maybe will sell the house.
*
Is there a new general hospital being built there?
noproblem
post Oct 22 2013, 01:46 PM

Getting Started
**
Junior Member
173 posts

Joined: Jun 2006
QUOTE(max2k @ Oct 17 2013, 02:12 PM)
Is those students still renting the place there ?  Does flood still happen  at the junction ?
*
new vehicle policy implemented. each house only have max 3 cars and 2 motorcycles. you will know how much impact to student house cause most of them driving motor.
forever1979
post Oct 22 2013, 01:49 PM

Look at all my stars!!
*******
Senior Member
2,854 posts

Joined: Jul 2013


the new hospital is in Section 7, near the Petronas.
Next year shall be completed.
vivalegian
post Oct 22 2013, 02:48 PM

Getting Started
**
Junior Member
56 posts

Joined: Jul 2013


QUOTE(stevenkkt @ Oct 17 2013, 10:49 AM)
I did mine with previous slow motion admin girl. Took me more than 1 week, nearly two weeks. I'm glad that she has left, it was quite painful to liaise with her.

I think with the new admin person should be within 5 days or 1 week. Let us know how long it takes you to get yours. smile.gif
*
i hope mine will be faster as soon as possible.....i had talked to slow motion girls,,,,sometime she lacks info....and said dunnu....arggggg so stress

This post has been edited by vivalegian: Oct 22 2013, 02:48 PM
crazykiller
post Oct 22 2013, 04:11 PM

New Member
*
Junior Member
40 posts

Joined: Jul 2013
QUOTE(vivalegian @ Oct 22 2013, 02:48 PM)
i hope mine will be faster as soon as possible.....i had talked to slow motion girls,,,,sometime she lacks info....and said dunnu....arggggg so stress
*
Totally agreed with u . rclxub.gif
stevenkkt
post Oct 22 2013, 08:45 PM

On my way
****
Senior Member
600 posts

Joined: Dec 2008


QUOTE(noproblem @ Oct 22 2013, 01:46 PM)
new vehicle policy implemented. each house only have max 3 cars and 2 motorcycles. you will know how much impact to student house cause most of them driving motor.
*
I think this is a good move... sooner or later these students will be fed up with these policies & will move away. I hope this happens sooner. smile.gif
noproblem
post Oct 23 2013, 01:54 PM

Getting Started
**
Junior Member
173 posts

Joined: Jun 2006
QUOTE(stevenkkt @ Oct 22 2013, 08:45 PM)
I think this is a good move... sooner or later these students will be fed up with these policies & will move away. I hope this happens sooner. smile.gif
*
Yeah but I think it should be flexible allow 5 vehicles (doesn't matter car/motor/van/etc).

87 Pages « < 17 18 19 20 21 > » Top
 

Change to:
| Lo-Fi Version
0.0417sec    0.70    6 queries    GZIP Disabled
Time is now: 20th December 2025 - 03:02 PM