yes!! now can balik for raya with LRT
Prasarana to build Shah Alam LRT!, Kelana Jaya-Shah Alam-Klang!! News
Prasarana to build Shah Alam LRT!, Kelana Jaya-Shah Alam-Klang!! News
|
|
Apr 24 2013, 11:13 AM
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,160 posts Joined: Dec 2004 From: Subang Jaya USJ |
yes!! now can balik for raya with LRT
|
|
|
Apr 24 2013, 11:13 AM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
5,369 posts Joined: Jan 2003 |
kroni wan back shah alam
|
|
|
Apr 24 2013, 11:13 AM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
2,058 posts Joined: Mar 2011 From: Today: 9:03 AM |
QUOTE(Kampung2005 @ Apr 24 2013, 11:11 AM) KTM serves more established parts of Klang/Shah Alam. Currently drawing second one. Coming up soon... LRT 3 going to serve new areas, such as recently developed Bukit Jelutong all those. From SPAD map, it seems they are thinking of ELITE (NKVE) alignment. Nice attempt on the map! My idea of LRT in Klang is to build at places without public transport. As for the areas that already have KTM, they can consider to build few LRT stops close to KTM stops. So that we don't have all the trains crammed into one spot |
|
|
Apr 24 2013, 11:13 AM
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
QUOTE(cyanidezyen @ Apr 24 2013, 11:11 AM) Don't think they can abolish the KTM...they are still operating but with few least-frequent station closed down...so that the travel time will be fasten up... those were the suggestion given to SPAD by the transport consultants There is no plan to close any KTM Komuter stations. One new station will be added, which is Eco City.However, there is plan to upgrade the whole stuff into 'KTM Metro'. KTM Metro plan is to allow more frequent trains, up to 5 minutes during peak hour. But, the thing is that KTM Metro will only happen if they build the bypass track for cargo trains, such as Serendah to Port Klang so that the cargo train won't occupy busy Komuter sections. |
|
|
Apr 24 2013, 11:14 AM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
9,206 posts Joined: Jun 2006 |
QUOTE(Ichibanichi @ Apr 24 2013, 10:56 AM) If u won't mind of using 2nd hand or 3rd hand house but I prefer newly built house. at the end of the day 2nd hand or 3rd hand doesnt even matter.. Btw bangsar no more developement while damansara height......come out from house jam here and there more importantly is location.. sorry la.. setia alam is like way out of town.. go KL kena tol. go Klang kena traffic light jam..lol.. and how's the public transport there then? since you say the township like so good. This post has been edited by ar188: Apr 24 2013, 11:15 AM |
|
|
Apr 24 2013, 11:18 AM
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
Two places have been mentioned.
- Shah Alam stadium area - Port Klang KTM station Where will the line serves? |
|
|
Apr 24 2013, 11:18 AM
|
![]()
Junior Member
38 posts Joined: Mar 2013 |
QUOTE(Kampung2005 @ Apr 24 2013, 11:13 AM) There is no plan to close any KTM Komuter stations. One new station will be added, which is Eco City. oops sorry - i meant temporarily close down during peak hours as suggestionHowever, there is plan to upgrade the whole stuff into 'KTM Metro'. KTM Metro plan is to allow more frequent trains, up to 5 minutes during peak hour. But, the thing is that KTM Metro will only happen if they build the bypass track for cargo trains, such as Serendah to Port Klang so that the cargo train won't occupy busy Komuter sections. now have to see whether the Freight Relief Line is gonna materialized or not |
|
|
Apr 24 2013, 11:20 AM
|
![]() ![]()
Junior Member
297 posts Joined: Apr 2010 |
QUOTE(ar188 @ Apr 24 2013, 11:14 AM) at the end of the day 2nd hand or 3rd hand doesnt even matter.. setia alam is like 10 years ago version of puchong. what did ppl said about puchong 10 years ago, and now what happen to puchong ?more importantly is location.. sorry la.. setia alam is like way out of town.. go KL kena tol. go Klang kena traffic light jam..lol.. and how's the public transport there then? since you say the township like so good. |
|
|
Apr 24 2013, 11:21 AM
|
![]() ![]() ![]() ![]() ![]()
Senior Member
769 posts Joined: Aug 2009 |
|
|
|
Apr 24 2013, 11:22 AM
|
![]() ![]() ![]() ![]() ![]()
Senior Member
769 posts Joined: Aug 2009 |
|
|
|
Apr 24 2013, 11:29 AM
|
![]()
Junior Member
6 posts Joined: Sep 2008 From: Klang, Selangor |
How are they going to connect Klang to Kelana Jaya station when the new Kelana Jaya Line Extension have already been connected to the Kelana Jaya Station?
|
|
|
Apr 24 2013, 11:36 AM
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
QUOTE(sabre23t @ Apr 24 2013, 11:29 AM) How are they going to connect Klang to Kelana Jaya station when the new Kelana Jaya Line Extension have already been connected to the Kelana Jaya Station? Somehow, I feel, if they want to connect LRT 3 with Kelana Jaya line, it need not be Kelana Jaya station (KJ 24).Kelana Jaya line extension station 1 or 2 can be considered, but then station 2 might be the most suitable. I wonder will they share the same depot as Lembah Subang too. If they share that same depot, then the same Bombardier ART will be used for LRT 3 It will be easier to build as this LRT 3 can easily follow Jalan Lapangan Terbang Subang. This post has been edited by Kampung2005: Apr 24 2013, 11:39 AM |
|
|
Apr 24 2013, 11:37 AM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
2,058 posts Joined: Mar 2011 From: Today: 9:03 AM |
QUOTE(t3arsCulprit @ Apr 24 2013, 11:21 AM) Sri muda have plenty of foreigners staying at that area.. We can't discriminate them anyway later pipul will complain alot bangala in LRT train.. Here's the Klang-Kemuning-Puchong line. Interchanges at ST13 of the Kelana Jaya-USJ extension. ![]() Klang-Kemuning-Puchong pic1 » Click to show Spoiler - click again to hide... « Purple : some newly build house. Something Phase 3. I can't remember the name well. Pink : TTDI Suria + Alam Impian. Houses here are already close to sold out. pic2 » Click to show Spoiler - click again to hide... « This post has been edited by patienceGNR: Apr 24 2013, 12:20 PM |
|
|
Apr 24 2013, 11:38 AM
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
http://www.prasarana.com.my/projects/prasa...s-sdn-bhd-prime
PROJECTS UNDER PRIME : Covered Walkway and Elevated Pedestrian Linkage Station Integration (Masjid Jamek, Titiwangsa & Hang Tuah) Extension of the AFC system to RapidKL bus network Mid-life Refurbishment of Trains for Kelana Jaya Line Fleet expansion and station upgrading of KL Monorail New Buses for Rapid Bus Installation of Facilities and Systems for Balakong New Bus Headquarters Installation of facilities and Systems for Ampang Station Multi-Storey Parking Facility New 14 x 4-Car Trains for the Kelana Jaya Line Extension Project Integrated AFC System for Kelana Jaya and Ampang Line Extension Project Mid-life Refurbishment of Trains Ampang Line Development of 12 Storey Prasarana Headquarters Building Integrated Control Center for Prasarana public transport services Expansion of Train Workshop and Depot Facilities for Kelana Jaya Line Integrated Ticketing System for Sunway Bus Rapid Transit Feasibility Study for LRT 3 to Klang Upgrading of Network Communication backbone for Ampang and Kelana Jaya Lines Train Simulator for Ampang Line |
|
|
Apr 24 2013, 11:44 AM
|
![]() ![]() ![]() ![]() ![]()
Senior Member
769 posts Joined: Aug 2009 |
QUOTE(patienceGNR @ Apr 24 2013, 11:37 AM) We can't discriminate them anyway Interesting..Here's the Klang-Kemuning-Puchong line. Interchanges at ST13 of the Kelana Jaya-USJ extension. ![]() Klang-Kemuning-Puchong pic1 » Click to show Spoiler - click again to hide... « pic2 » Click to show Spoiler - click again to hide... « But then if Kota Kemuning station can be put near to the Business centre area is good.. |
|
|
Apr 24 2013, 11:44 AM
|
![]()
Junior Member
6 posts Joined: Sep 2008 From: Klang, Selangor |
QUOTE(Kampung2005 @ Apr 24 2013, 11:36 AM) Kelana Jaya line extension station 1 or 2 can be considered, but then station 2 might be the most suitable ... I think Station 1 is geographically as problematic as Kelana Jaya station. Station 2 may be okay to go near NKVE to Klang. What do you think about Station 3? It'll pass through higher density areas in Shah Alam via Glenmarie to Klang, right?If they share that same depot, then the same Bombardier ART will be used for LRT 3 I think even without shared depot, the same Bombardier ART could be used. That subang depot already being expanded to take care of almost double the number of trains it was originally built for. Would another expansion of similar magnitude be possible? |
|
|
Apr 24 2013, 11:49 AM
|
![]() ![]() ![]()
Junior Member
343 posts Joined: Mar 2005 From: This means more ! |
|
|
|
Apr 24 2013, 11:53 AM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
2,058 posts Joined: Mar 2011 From: Today: 9:03 AM |
QUOTE(Ichibanichi @ Apr 24 2013, 09:25 AM) Hope it pass thru Setia Alam and integrate with Klang Sentral. Actually to integrate Klang-Kemuning-Setia Alam quite tedious. Unless we set Setia Alam as last stop. Setia Alam - Klang - Kemuning - Puchong.But the bad point.......Property price in Setia Alam & Setia Eco Park naik lagi QUOTE(t3arsCulprit @ Apr 24 2013, 11:44 AM) Interesting.. I put roughly only But then if Kota Kemuning station can be put near to the Business centre area is good.. |
|
|
Apr 24 2013, 11:56 AM
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
QUOTE(sabre23t @ Apr 24 2013, 11:44 AM) I think Station 1 is geographically as problematic as Kelana Jaya station. Station 2 may be okay to go near NKVE to Klang. What do you think about Station 3? It'll pass through higher density areas in Shah Alam via Glenmarie to Klang, right? Station 3 will be fine too.I think even without shared depot, the same Bombardier ART could be used. That subang depot already being expanded to take care of almost double the number of trains it was originally built for. Would another expansion of similar magnitude be possible? It seems the fixed points of the line are Shah Alam stadium vicinity and KTM Port Klang. Routing from station 3 to Shah Alam through Glenmarie is still possible. Further depot expansion, not sure about this, but I thought they are getting extra 14 sets of four car train as well? Should they need new depot for LRT 3, good thing is that there is ample land east of Setia Alam. I always believe in the capability of Bombardier ART, it can do tight curves, and do steeper gradient, hence more flexible to plan with |
|
|
Apr 24 2013, 12:00 PM
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
QUOTE(patienceGNR @ Apr 24 2013, 11:53 AM) Actually to integrate Klang-Kemuning-Setia Alam quite tedious. Unless we set Setia Alam as last stop. Setia Alam - Klang - Kemuning - Puchong. We need more BRTs too I put roughly only |
| Bump Topic Add ReplyOptions New Topic |
| Change to: | 0.0217sec
0.59
6 queries
GZIP Disabled
Time is now: 19th December 2025 - 05:07 AM |