Thanks for you information, But i dnt think they will tell u the exactly vp date if they cnt finish on that time.
Investment Ivory Residence @ Mutiara Heights, Kajang, by TLS, share your opinions here
Investment Ivory Residence @ Mutiara Heights, Kajang, by TLS, share your opinions here
|
|
Apr 5 2014, 10:01 AM
|
![]() ![]() ![]()
Junior Member
341 posts Joined: Dec 2012 |
Thanks for you information, But i dnt think they will tell u the exactly vp date if they cnt finish on that time.
|
|
|
|
|
|
Apr 5 2014, 10:02 AM
|
![]() ![]() ![]()
Junior Member
341 posts Joined: Dec 2012 |
It sound like next year only will complete
|
|
|
Apr 6 2014, 11:36 PM
Show posts by this member only | IPv6 | Post
#2003
|
![]() ![]() ![]()
Junior Member
445 posts Joined: Nov 2012 |
water rationing will slow down construction progress or not?
|
|
|
Apr 9 2014, 01:44 AM
|
![]() ![]() ![]()
Junior Member
341 posts Joined: Dec 2012 |
|
|
|
Apr 10 2014, 02:40 PM
|
![]() ![]() ![]() ![]() ![]()
Senior Member
925 posts Joined: Jan 2003 From: Malaysia |
|
|
|
Apr 16 2014, 07:59 PM
|
![]()
Junior Member
15 posts Joined: Apr 2014 |
|
|
|
|
|
|
Apr 16 2014, 08:05 PM
|
![]() ![]() ![]()
Junior Member
445 posts Joined: Nov 2012 |
|
|
|
Apr 16 2014, 08:50 PM
|
![]() ![]() ![]()
Junior Member
445 posts Joined: Jan 2014 |
QUOTE(bukithot @ Apr 16 2014, 08:05 PM) Great!!Thanks for the update of Photo. ( i usually will walk up the flat on the right hand side to take a better photo shot of both ivory and ameera). Glad to see Ameera block C also at 12-15 floor level. Looking at bbb mode at savillie@ kajang selling at 420 psf, I think the Ivory buyer will be glad of their decision make in 2012. The kajang service apartment is ready to reach 500 psf , when Ivory vp |
|
|
Apr 16 2014, 10:59 PM
|
![]()
Junior Member
15 posts Joined: Apr 2014 |
QUOTE(Chun36 @ Apr 16 2014, 08:50 PM) Great!! u mean the far right block in the photo is ameera?i thought that is ivory block c.Thanks for the update of Photo. ( i usually will walk up the flat on the right hand side to take a better photo shot of both ivory and ameera). Glad to see Ameera block C also at 12-15 floor level. Looking at bbb mode at savillie@ kajang selling at 420 psf, I think the Ivory buyer will be glad of their decision make in 2012. The kajang service apartment is ready to reach 500 psf , when Ivory vp what is vp? |
|
|
Apr 18 2014, 04:17 PM
|
![]() ![]() ![]() ![]() ![]()
Senior Member
925 posts Joined: Jan 2003 From: Malaysia |
Block B and C of Ivory forms a "L" shape.. the one far right is Ameera
VP is Vacant Possession means fit to move into the property and stay |
|
|
Apr 19 2014, 02:47 PM
|
![]() ![]() ![]()
Junior Member
341 posts Joined: Dec 2012 |
|
|
|
Apr 19 2014, 02:49 PM
|
![]() ![]() ![]()
Junior Member
341 posts Joined: Dec 2012 |
QUOTE(Chun36 @ Apr 16 2014, 08:50 PM) Great!! Yes near by tht area already 450psfThanks for the update of Photo. ( i usually will walk up the flat on the right hand side to take a better photo shot of both ivory and ameera). Glad to see Ameera block C also at 12-15 floor level. Looking at bbb mode at savillie@ kajang selling at 420 psf, I think the Ivory buyer will be glad of their decision make in 2012. The kajang service apartment is ready to reach 500 psf , when Ivory vp |
|
|
Apr 19 2014, 10:02 PM
|
![]() ![]() ![]() ![]()
Senior Member
630 posts Joined: Dec 2011 |
block a n b structure complted.. where is C?
|
|
|
|
|
|
Apr 19 2014, 10:11 PM
|
![]() ![]() ![]()
Junior Member
319 posts Joined: Nov 2012 |
|
|
|
Apr 19 2014, 10:35 PM
|
![]() ![]() ![]() ![]()
Senior Member
630 posts Joined: Dec 2011 |
if they dont build block C, can they obtain CCC??
|
|
|
Apr 20 2014, 04:56 PM
|
![]() ![]() ![]() ![]() ![]()
Senior Member
925 posts Joined: Jan 2003 From: Malaysia |
|
|
|
Apr 20 2014, 11:49 PM
|
![]() ![]() ![]()
Junior Member
341 posts Joined: Dec 2012 |
Herewith attach you all updated photos on 18 April 2014, highlight in red are Block C construction cane
Block A now left internal and window installation, block B left one floor to finish the top construct floor 22, and Block C that i mentioned above...circle in red... This post has been edited by peggylin: Apr 20 2014, 11:52 PM |
|
|
Apr 21 2014, 12:00 AM
|
![]() ![]() ![]() ![]() ![]()
Senior Member
925 posts Joined: Jan 2003 From: Malaysia |
QUOTE(peggylin @ Apr 20 2014, 11:49 PM) Herewith attach you all updated photos on 18 April 2014, highlight in red are Block C construction cane Arr, hope that is the case. Thanks PeggyBlock A now left internal and window installation, block B left one floor to finish the top construct floor 22, and Block C that i mentioned above...circle in red... |
|
|
Apr 21 2014, 12:14 AM
|
![]() ![]() ![]()
Junior Member
341 posts Joined: Dec 2012 |
Block C 8 units per floor should be no problem to finished it on time within 1 years, as I know Block B 12 units they just take 9 months time build on top..once Block B done sure will focus on C to speed it up
This post has been edited by peggylin: Apr 21 2014, 12:16 AM |
|
|
Apr 21 2014, 09:43 PM
|
![]() ![]() ![]() ![]()
Senior Member
630 posts Joined: Dec 2011 |
nice info!!
thanks so much! |
|