Outline ·
[ Standard ] ·
Linear+
Kiara Residence 2, Bukit Jalil / Bukit OUG v2, A concept quadrant zone living in BJ
|
puchongite
|
Jun 16 2015, 10:33 PM
|
|
Prasarana is saying the phase 1 Ampang line LRT extension will be open Oct 31. http://www.orientaldaily.com.my/central/zm1050This has been said before but as time goes by, they have not shifted the date yet. So I think their estimate becomes more and more realistic. This post has been edited by puchongite: Jun 16 2015, 10:33 PM
|
|
|
|
|
|
ronn77
|
Jun 16 2015, 11:12 PM
|
|
So our units number has changed in accordance with the bomba or whatever sequence it is..a bit disappointed since fot a nice number and now it goes a level down.
|
|
|
|
|
|
cybermaster98
|
Jun 17 2015, 05:19 PM
|
|
QUOTE(ronn77 @ Jun 16 2015, 11:12 PM) So our units number has changed in accordance with the bomba or whatever sequence it is..a bit disappointed since fot a nice number and now it goes a level down. Same problem here. I had a 8 before this. Now became 7.
|
|
|
|
|
|
ronn77
|
Jun 17 2015, 06:07 PM
|
|
QUOTE(cybermaster98 @ Jun 17 2015, 05:19 PM) Same problem here. I had a 8 before this. Now became 7.  Lol..we are same unit type. There goes our no.8
|
|
|
|
|
|
puchongite
|
Jun 18 2015, 09:32 AM
|
|
QUOTE(cybermaster98 @ Jun 17 2015, 05:19 PM) Same problem here. I had a 8 before this. Now became 7.  You should be grateful that it has not become 4. But funny that somebody told me his unit changed from 8 to 2.
|
|
|
|
|
|
TSChris Chew
|
Jun 18 2015, 11:32 AM
|
|
QUOTE(ronn77 @ Jun 16 2015, 11:12 PM) So our units number has changed in accordance with the bomba or whatever sequence it is..a bit disappointed since fot a nice number and now it goes a level down. Ya, that was a bit stupid although I understand it was a sequence of bomba. But, the coordinate of unit postal arrangemenr is a bit sucks and not proper, just see Kr1, they told developer that Postal Unit No 1 must be the first unit you came out from the lift and left hand side. And rounded back till No 8, the unit beside lift on right side. Now, this KR2 is diff, the No 1 must be the unit on right side but facing lift. Lol.
|
|
|
|
|
|
TSChris Chew
|
Jun 18 2015, 11:36 AM
|
|
QUOTE(puchongite @ Jun 18 2015, 09:32 AM) You should be grateful that it has not become 4. But funny that somebody told me his unit changed from 8 to 2. If he or she is owner of Tower 1, then its correct. From 8 to 2. Tower 1 lot no is different compare to Tower 2 & 3. Developer puts it as Lot No 8 bcz its stands for big size of 1457 or more sq ft.
|
|
|
|
|
|
ronn77
|
Jun 18 2015, 02:01 PM
|
|
QUOTE(Chris Chew @ Jun 18 2015, 11:32 AM) Ya, that was a bit stupid although I understand it was a sequence of bomba. But, the coordinate of unit postal arrangemenr is a bit sucks and not proper, just see Kr1, they told developer that Postal Unit No 1 must be the first unit you came out from the lift and left hand side. And rounded back till No 8, the unit beside lift on right side. Now, this KR2 is diff, the No 1 must be the unit on right side but facing lift. Lol. The thing is they do not have standard guidelines on how the numbering works, each of the stupid bomba fella will have their own definitions.
|
|
|
|
|
|
TSChris Chew
|
Jun 18 2015, 03:32 PM
|
|
QUOTE(ronn77 @ Jun 18 2015, 02:01 PM) The thing is they do not have standard guidelines on how the numbering works, each of the stupid bomba fella will have their own definitions. Haha, under DBKL, I get used to it and expected. This thing seldom happened for projects under Selangor. So, plan to rent out your KR2 or own stay?
|
|
|
|
|
|
cybermaster98
|
Jun 18 2015, 03:36 PM
|
|
QUOTE(Chris Chew @ Jun 18 2015, 03:32 PM) Haha, under DBKL, I get used to it and expected. This thing seldom happened for projects under Selangor.
So, plan to rent out your KR2 or own stay? What kind of rentals can I expect for a 1457sf unit mid floor?
|
|
|
|
|
|
ronn77
|
Jun 18 2015, 03:43 PM
|
|
QUOTE(Chris Chew @ Jun 18 2015, 03:32 PM) Haha, under DBKL, I get used to it and expected. This thing seldom happened for projects under Selangor. So, plan to rent out your KR2 or own stay? Plan to rent out and hold until Pavillion 2 is ready Initially plan for own stay but gf do not want to stay in condo so at the end change plan to stay in landed.
|
|
|
|
|
|
TSChris Chew
|
Jun 18 2015, 04:08 PM
|
|
QUOTE(cybermaster98 @ Jun 18 2015, 03:36 PM) What kind of rentals can I expect for a 1457sf unit mid floor? Hmm, I think around RM 2.5k max, with LRT up, LRT road connectivity ( main ) and full furnished, I believe can be higher a bit only, as contradict to number of units available for let in the same road.
|
|
|
|
|
|
TSChris Chew
|
Jun 18 2015, 04:18 PM
|
|
QUOTE(ronn77 @ Jun 18 2015, 03:43 PM) Plan to rent out and hold until Pavillion 2 is ready Initially plan for own stay but gf do not want to stay in condo so at the end change plan to stay in landed. Ic. Wahh, with the new landed your purchased recently, definitely it was a much much better choice compare to this leh, lol.
|
|
|
|
|
|
TSChris Chew
|
Jun 18 2015, 04:52 PM
|
|
QUOTE(Yenn08 @ Jun 18 2015, 04:41 PM) Just got update from FB, handover key to owner tentatively in Aug/Sep for Tower 3. So fast meh ?  I thought by batch and Tower 1 and 2 should be earlier due to they signed S&P earlier than Tower 3. Nevertheless, all the internal units had been fully done, pending some rectification and the facilities floor. BUt, it looks a bit rushing if by Aug 2015, just 2 months away to finish up the pool and so ... I long time nvr passby so I am not sure.
|
|
|
|
|
|
elmond
|
Jun 18 2015, 04:53 PM
|
|
fast not good meh? developer save a lot from DIBS wo.
|
|
|
|
|
|
cybermaster98
|
Jun 18 2015, 04:56 PM
|
|
QUOTE(Chris Chew @ Jun 18 2015, 04:52 PM) I thought by batch and Tower 1 and 2 should be earlier due to they signed S&P earlier than Tower 3.
Nevertheless, all the internal units had been fully done, pending some rectification and the facilities floor. BUt, it looks a bit rushing if by Aug 2015, just 2 months away to finish up the pool and so ... I long time nvr passby so I am not sure. Hows the internal quality? Fittings? Workmanship?
|
|
|
|
|
|
cybermaster98
|
Jun 18 2015, 04:58 PM
|
|
QUOTE(elmond @ Jun 18 2015, 04:53 PM) fast not good meh? developer save a lot from DIBS wo. Good for developer but not good for us. If they rush, finishing quality will be affected. Plus, we want the LRT to be operational before we get VP. That would ensure slightly better chances of getting decent rental and capital appreciation. It will also ensure the construction debris in front of the condo is cleared.
|
|
|
|
|
|
ronn77
|
Jun 18 2015, 05:06 PM
|
|
QUOTE(Chris Chew @ Jun 18 2015, 04:18 PM) Ic. Wahh, with the new landed your purchased recently, definitely it was a much much better choice compare to this leh, lol. Landed is more convenient la bro..can have own compound and if you going to supermarket buying goodies and it's easier to move the thing to the house. Anyway I still like condo due to better view and less insects coming into the house. How about you? Mind to share your intention on your units?
|
|
|
|
|
|
Yenn08
|
Jun 18 2015, 05:13 PM
|
New Member
|
QUOTE(cybermaster98 @ Jun 18 2015, 04:58 PM) Good for developer but not good for us. If they rush, finishing quality will be affected. Plus, we want the LRT to be operational before we get VP. That would ensure slightly better chances of getting decent rental and capital appreciation. It will also ensure the construction debris in front of the condo is cleared. Agreed even though can't wait to see the final workmanship of KR2  . Anyway, i'm doubt they can make it by Aug/Sept.
|
|
|
|
|