Outline ·
[ Standard ] ·
Linear+
Investment Window On The Park, By Selangor Dredging Berhad
|
maverickzack
|
Oct 7 2013, 04:38 PM
|
|
QUOTE(doomdoom @ Oct 7 2013, 04:29 PM) i like the design expose more to sun light but at the same time, the bad thing is when it rain, the floor will get wet easilly, and from time to time, the rain water mark wil start appear on the wall which make it looks real ugly... That depends on the material and paint being used. Just like the other side of the building walls which facing out, its exposed to rain as well. It wont have water mark..unless bad quality stuff are being applied..
|
|
|
|
|
|
HELLO HELLO
|
Oct 8 2013, 03:25 PM
|
|
QUOTE(calvin989898 @ Oct 7 2013, 01:44 PM) WOTP looks so similar to this Ritz Carton Millenia< Singapore.. similar layout to Block A and B This post has been edited by HELLO HELLO: Oct 8 2013, 03:26 PM Attached thumbnail(s)
|
|
|
|
|
|
young_guy87
|
Oct 8 2013, 03:32 PM
|
|
Whats the market price currently?
|
|
|
|
|
|
HELLO HELLO
|
Oct 8 2013, 03:44 PM
|
|
|
|
|
|
|
|
HELLO HELLO
|
Oct 10 2013, 01:34 AM
|
|
QUOTE(maverickzack @ Oct 7 2013, 03:42 PM) Concept is pretty awesome but it really depends how well the landscape is being done in actual thing, we will see that when its ready. The rest of the facilities is all about quality and simplicity which I like, coz things are better keep simple as the design will looks great even 10-20-50 years later. The building exterior design is pretty normal I agree but not simple, i would have prefer something even more simple, something like The Village with contrast color white + dark grey, but I guess its the overall buildings that makes it stand out - Orientation of the building in V shapes, which is rather unique. Yes you can say so its design with a long corridor like a flat but I believe none of the details will look like one and corridor would be awesome with lotsa neutral light and ventilation. Part of the reason is because its designed with linear layout which to me its 'premium' design, most condo could not design in such way as it require huge space. I think the park path can be improved, less dead end and straighter path would be great for running and also cycling (If allowed). By the way to let you guys know, the main entrance wooden door would be changed to Black, which I personally prefer the original version which is in Oak texture - Brown Oranges Wood. I like the building design more than concept! V shape.. n especially the "windows" will be the killer scenery. The parks is pretty simple and nothing fancy. but i think this is nice n elegance... Very 80s n 70s! Can cycle I think. Saw kid tricycle on the Wotp illustrated park picture...lol. Oh.... Door change to charcoal Black...hope the texture of the door look good.
|
|
|
|
|
|
HELLO HELLO
|
Oct 10 2013, 01:47 AM
|
|
QUOTE(WilberSc @ Oct 6 2013, 10:58 PM) Really high price tag in cheras south area........  What to do??..Kajang and semenyih is catching up...
|
|
|
|
|
|
maverickzack
|
Oct 10 2013, 11:23 AM
|
|
QUOTE(HELLO HELLO @ Oct 10 2013, 01:34 AM) I like the building design more than concept! V shape.. n especially the "windows" will be the killer scenery. The parks is pretty simple and nothing fancy. but i think this is nice n elegance... Very 80s n 70s! Can cycle I think. Saw kid tricycle on the Wotp illustrated park picture...lol. Oh.... Door change to charcoal Black...hope the texture of the door look good. Guess cycling is for kids then... the park terrain a little hilly, can mountain bike as well I guess. I prefer the original oak door color anytime over the black one. The swings in the park has been removed. Not sure if it still available in the actual plan.
|
|
|
|
|
|
calvin989898
|
Oct 10 2013, 11:55 AM
|
|
QUOTE(maverickzack @ Oct 10 2013, 11:23 AM) Guess cycling is for kids then... the park terrain a little hilly, can mountain bike as well I guess. I prefer the original oak door color anytime over the black one. The swings in the park has been removed. Not sure if it still available in the actual plan. Don't think there is swing la...upon vp the trees going to be so small...not strong enough for those swings. unless they start planting those big trees now....
|
|
|
|
|
|
calapia
|
Oct 10 2013, 04:12 PM
|
|
yo, i remember some bro said that this month for block c the bank will release the 10%?? anyone gotten their loan agreement duplicates yet?? i sms my sales agent, no reply...ish..
|
|
|
|
|
|
HELLO HELLO
|
Oct 10 2013, 05:59 PM
|
|
QUOTE(maverickzack @ Oct 10 2013, 11:23 AM) Guess cycling is for kids then... the park terrain a little hilly, can mountain bike as well I guess. I prefer the original oak door color anytime over the black one. The swings in the park has been removed. Not sure if it still available in the actual plan. should be ok to cycle around. place so big oh tree swing no liao.... wonder how the teen's play area going to look like...will it be something like By The Sea kid's playground? This post has been edited by HELLO HELLO: Oct 10 2013, 05:59 PM Attached thumbnail(s)
|
|
|
|
|
|
maverickzack
|
Oct 10 2013, 06:11 PM
|
|
QUOTE(HELLO HELLO @ Oct 10 2013, 05:59 PM) should be ok to cycle around. place so big oh tree swing no liao.... wonder how the teen's play area going to look like...will it be something like By The Sea kid's playground? That looks like a bootcamp to me.. than a kid's playground.
|
|
|
|
|
|
maverickzack
|
Oct 10 2013, 06:13 PM
|
|
QUOTE(calvin989898 @ Oct 10 2013, 11:55 AM) Don't think there is swing la...upon vp the trees going to be so small...not strong enough for those swings. unless they start planting those big trees now.... They actually did mentioned partially or all the trees will be planted somewhere else first and move in when the building is ready.
|
|
|
|
|
|
HELLO HELLO
|
Oct 10 2013, 06:21 PM
|
|
QUOTE(maverickzack @ Oct 10 2013, 06:13 PM) They actually did mentioned partially or all the trees will be planted somewhere else first and move in when the building is ready. yeah. i tot they use this monster machine to move the mature trees to wotp. see link: http://vimeo.com/654583441 gorek. tree, roots, soil all together up! another video bigger... longer http://www.youtube.com/watch?v=Lx9a6FmRV0UThis post has been edited by HELLO HELLO: Oct 10 2013, 06:28 PM
|
|
|
|
|
|
HELLO HELLO
|
Oct 10 2013, 06:24 PM
|
|
QUOTE(maverickzack @ Oct 10 2013, 06:11 PM) That looks like a bootcamp to me.. than a kid's playground. lol...hohoho... can use it to do cross fit...can train to be like "300" body shape
|
|
|
|
|
|
HELLO HELLO
|
Oct 10 2013, 06:27 PM
|
|
QUOTE(maverickzack @ Oct 10 2013, 06:11 PM) That looks like a bootcamp to me.. than a kid's playground. This post has been edited by HELLO HELLO: Oct 10 2013, 06:28 PM
|
|
|
|
|
|
HELLO HELLO
|
Oct 10 2013, 09:22 PM
|
|
QUOTE(calapia @ Oct 10 2013, 04:12 PM) yo, i remember some bro said that this month for block c the bank will release the 10%?? anyone gotten their loan agreement duplicates yet?? i sms my sales agent, no reply...ish.. Oh... My lawyer call me Liao....block c 10% release anytime soon. Call the lawyer who handle your case. This post has been edited by HELLO HELLO: Oct 10 2013, 09:23 PM
|
|
|
|
|
|
WilberSc
|
Oct 10 2013, 09:49 PM
|
|
QUOTE(HELLO HELLO @ Oct 10 2013, 09:22 PM) Oh... My lawyer call me Liao....block c 10% release anytime soon. Call the lawyer who handle your case. Really? I called last month to the initially lawyer who handle block C was resigned. And take over by la Malay lady, she said will email to me for asking me to hand over the original SPA to her but waited one month still no news from her.
|
|
|
|
|
|
HELLO HELLO
|
Oct 10 2013, 10:41 PM
|
|
QUOTE(WilberSc @ Oct 10 2013, 09:49 PM) Really? I called last month to the initially lawyer who handle block C was resigned. And take over by la Malay lady, she said will email to me for asking me to hand over the original SPA to her but waited one month still no news from her. yeap...you better follow-up with them. sometime they tak peduli.
|
|
|
|
|
|
WilberSc
|
Oct 11 2013, 12:28 AM
|
|
QUOTE(HELLO HELLO @ Oct 10 2013, 10:41 PM) yeap...you better follow-up with them. sometime they tak peduli. Ya Lo, really bad services.did u hand over ur original SPA to them ady? This post has been edited by WilberSc: Oct 11 2013, 12:28 AM
|
|
|
|
|
|
HELLO HELLO
|
Oct 11 2013, 08:57 AM
|
|
QUOTE(WilberSc @ Oct 11 2013, 12:28 AM) Ya Lo, really bad services.did u hand over ur original SPA to them ady? hand over soon. making appointment with my lawyer.
|
|
|
|
|