Investment Elements@Ampang, Good

views
     
hwongt
post Aug 25 2014, 11:29 PM

Getting Started
**
Junior Member
73 posts

Joined: Oct 2013


Isn't full height size for compartment storage near front door, opposite the kitchen?
iancyteo
post Aug 26 2014, 09:43 AM

Getting Started
**
Junior Member
135 posts

Joined: Nov 2009


QUOTE(hwongt @ Aug 26 2014, 12:29 AM)
Isn't full height size for compartment storage near front door, opposite the kitchen?
*
Yes. I will do it all the way up to the ceiling... I still consider whether to do plaster ceiling, if Yes, then will only up to the plaster ceiling.

The A/C is a bit weird, so make the plaster ceiling design weird for living room and bedroom.


hwongt
post Aug 26 2014, 10:43 AM

Getting Started
**
Junior Member
73 posts

Joined: Oct 2013


Full size for 1.5k is cheap. They quoted me for over 2k. Maybe used different materials. For the shoes rack also full height?
hwongt
post Aug 26 2014, 10:46 AM

Getting Started
**
Junior Member
73 posts

Joined: Oct 2013


QUOTE(iancyteo @ Aug 26 2014, 09:43 AM)
Yes. I will do it all the way up to the ceiling... I still consider whether to do plaster ceiling, if Yes, then will only up to the plaster ceiling.

The A/C is a bit weird, so make the plaster ceiling design weird for living room and bedroom.
*
For yr unit's view, are u taking the 640 sf unit or 705 sf?
iancyteo
post Aug 26 2014, 10:50 AM

Getting Started
**
Junior Member
135 posts

Joined: Nov 2009


QUOTE(hwongt @ Aug 26 2014, 11:43 AM)
Full size for 1.5k is cheap. They quoted me for over 2k. Maybe used different materials. For the shoes rack also full height?
*
Yes... full size... but will be trouble to access right? tongue.gif

QUOTE(hwongt @ Aug 26 2014, 11:46 AM)
For yr unit's view, are u taking the 640 sf unit or 705 sf?
*
640sf.
hwongt
post Aug 26 2014, 10:55 AM

Getting Started
**
Junior Member
73 posts

Joined: Oct 2013


Isn't safe to build so big shoes rack outside yr unit?
hwongt
post Aug 26 2014, 11:00 AM

Getting Started
**
Junior Member
73 posts

Joined: Oct 2013


I think plaster ceilling cover bedroom & living room already enough. No feasible to cover kitchen area cause already got lower ceilling.
iancyteo
post Aug 26 2014, 11:20 AM

Getting Started
**
Junior Member
135 posts

Joined: Nov 2009


QUOTE(hwongt @ Aug 26 2014, 11:55 AM)
Isn't safe to build so big shoes rack outside yr unit?
*
I don't have any concern to have make a high shoe rack outside. As said, add lock or add grille...
Just the concern of door bell which is not accessible after adding grille.
So I might add a remote door bell outside the grille.

QUOTE(hwongt @ Aug 26 2014, 12:00 PM)
I think plaster ceilling cover bedroom & living room already enough. No feasible to cover kitchen area cause already got lower ceilling.
*
Cannot add plaster to the kitchen for sure, because the cabinet on top of fridge already up to the ceiling.
difficult to add plaster to the bedroom because for my unit, it is build on top of wardrobe and it was installed up to the ceiling. Unless to move the a/c.
For the living room, i plan to make a box plaster around the living room.
just like this.
user posted image
W4828J
post Aug 26 2014, 05:53 PM

New Member
*
Junior Member
16 posts

Joined: Aug 2014
QUOTE(Amsie @ Aug 25 2014, 12:40 PM)
went surveyed for furnitures and home appliances again.. here is the solution for washing machine lol...

front loading washer and have to buy those top cover is removable. standard height is 85cm minus the top cover should be just ngam to fit into the compartment..

Think block B still many ppl not collected key yet.
*
QUOTE(Wiredx @ Aug 25 2014, 01:26 PM)
A standard bosch or electrolux should do the trick. Theyre designed to have the top removable.
*
FIND FOR FRONT LOAD OR ELECTRIC APP , CAN FIND ME , ALL WELCOME ... thumbup.gif
Cheryl_Mummy
post Aug 26 2014, 06:42 PM

New Member
*
Junior Member
31 posts

Joined: Dec 2013
Developer Elite Forward Sdn Bhd (a subsidiary of Land & General & Mayland Parkview)
Contact Mr Ferdaus Mahmood (Executive Director of Property Planning & Development) Click this to generate / export label Click this to generate letter
60 3 6279 8103 Æ’ 60 3 6279 8324
Email: lgb@land-general.com Website: www.land-general.com
Level 2, Block D, Sri Damansara Business Park, Persiaran Industri, Bandar Sri Damansara, 52200 Kuala Lumpur, Federal Territory, Malaysia

Project Manager Elite Forward Sdn Bhd (a subsidiary of Land & General & Mayland Parkview)
Contact Mr Chai Keng Wai (Project Manager) Click this to generate / export label Click this to generate letter
60 3 6279 8119 Æ’ 60 3 6279 8022
Email: lgb@land-general.com Website: www.land-general.com
Level 2, Block D, Sri Damansara Business Park, Persiaran Industri, Bandar Sri Damansara, 52200 Kuala Lumpur, Federal Territory, Malaysia

Mayland Parkview Sdn Bhd
Contact Mr Chai Keng Wai (Project Manager) Click this to generate / export label Click this to generate letter
60 3 6201 8088 Æ’ 60 3 6201 5088
Website: www.mayland.com.my
K-08, Plaza Damas, 60 Sri Hartamas 1, 50480 Kuala Lumpur, Federal Territory, Malaysia

Coordinator Letrik PJ Union Sdn Bhd
Contact Ms Maizura (Project Engineer & Coordinator) Click this to generate / export label Click this to generate letter
60 3 7803 2266 Æ’ 60 3 7803 2269
Email: info@pjunion.com Website: www.pjunion.com
2, Jalan SS25/35, Taman Mayang, 47301 Petaling Jaya, Selangor, Malaysia

Architect NRY Architects Sdn Bhd (formerly NR Associates Sdn Bhd)
Contact Ms Clarice Chia Sok Ling (Project Architect) Click this to generate / export label Click this to generate letter
60 3 4043 1348 Æ’ 60 3 4043 1349
Email: clarice@nrasb.com.my Website: nry.com.my
Suite 1505, 15th Floor, Bangunan AM Assurance, 1, Jalan Lumut, 50400 Kuala Lumpur, Federal Territory, Malaysia

Landscape Designer Just Right Design Sdn Bhd (JRD)
Contact Mr Lee Choong Hong (Principal) Click this to generate / export label Click this to generate letter
60 3 6257 8983 Æ’ 60 3 6257 8902
Email: jrdesign.asia@gmail.com Website: www.justrightdesign.synthasite.com
67-2, Jalan Metro Perdana Barat 1, Taman Usahawan Kepong, Kepong Utara, 52100 Kuala Lumpur, Federal Territory, Malaysia

Civil & Structural Engineer Perunding ACE Sdn Bhd
Contact Mr Ng You Pang (Associate Director & Structural Engineer) Click this to generate / export label Click this to generate letter
60 3 6141 7330 / 016 227 9599 Æ’ 60 3 6141 7880
Email: ace@pasb.com.my
25-2, Jalan PJU 5/3, Dataran Sunway, Kota Damansara, 47810 Petaling Jaya, Selangor, Malaysia

Mechanical Engineer Arup Jururunding Sdn Bhd - Kuala Lumpur
Contact Ir Mohd Fazidin Faizal (Head of Mechanical Department) Click this to generate / export label Click this to generate letter
60 3 6273 2223 Æ’ 60 3 6273 2227
Email: mailbox@arup.com.my Website: www.arup.com.my
Level 6, Wisma Fiamma, 20, Jalan 7A/62A, Bandar Menjalara, 52200 Kuala Lumpur, Federal Territory, Malaysia

Electrical Engineer Arup Jururunding Sdn Bhd - Kuala Lumpur
Contact Ir Rafiee bin Ishak (Head of Electrical) Click this to generate / export label Click this to generate letter
60 3 6273 2223 ext. 278 Æ’ 60 3 6273 2227
Email: mailbox@arup.com.my Website: www.arup.com.my
Level 6, Wisma Fiamma, 20, Jalan 7A/62A, Bandar Menjalara, 52200 Kuala Lumpur, Federal Territory, Malaysia

Quantity Surveyor Elite Forward Sdn Bhd (a subsidiary of Land & General & Mayland Parkview)
Contact Mr Nor Azim (Quantity Surveyor) Click this to generate / export label Click this to generate letter
60 3 6279 8122 Æ’ 60 3 6279 8022
Email: lgb@land-general.com Website: www.land-general.com
Level 2, Block D, Sri Damansara Business Park, Persiaran Industri, Bandar Sri Damansara, 52200 Kuala Lumpur, Federal Territory, Malaysia

Perunding NFL Sdn Bhd
Contact Ms Chan Lee Nyen (Technical Director) Click this to generate / export label Click this to generate letter
60 3 2283 3503 Æ’ 60 3 2282 6075
Email: chanln@pnfl.com.my Website: www.pnfl.com.my
Wisma PNFL, 8 Jalan Bangsar Utama 9, Bangsar Utama, 59000 Kuala Lumpur, Federal Territory, Malaysia

Gainvest Builders (M) Sdn Bhd (subsidiary of Gainvest Corporation (M) Sdn Bhd)
Contact Mr Tung Tzer Min (Senior Quantity Surveyor) Click this to generate / export label Click this to generate letter
60 3 7803 6368 Æ’ 60 3 7880 0169
Email: tmtung@gainvest.com.my Website: www.gainvestco.com
69, Jalan SS 6/10, Kelana Jaya, 47301 Petaling Jaya, Selangor, Malaysia

Piling Contractor G-Pile Sistem Sdn Bhd
Contact Mr Siow Kon Hee (Contract Manager) Click this to generate / export label Click this to generate letter
60 3 7710 6477 / 8477 Æ’ 60 3 7710 5477
Email: skh@g-pile.com.my Website: www.g-pile.com.my
B-3-01 & B-3A-01, Neo Damansara, Jalan PJU 8/1, Bandar Damansara Perdana, 47820 Petaling Jaya, Selangor, Malaysia
(Works started in December 2010 and is expected to end in August (Tower A) & September 2011 (Tower B) )

Basement Contractor G-Pile Sistem Sdn Bhd
Contact Mr Yau Kim Wei (Senior Operations Manager) Click this to generate / export label Click this to generate letter
60 3 7710 6477 / 8477 Æ’ 60 3 7710 5477
Email: felicia@g-pile.com.my Website: www.g-pile.com.my
B-3-01 & B-3A-01, Neo Damansara, Jalan PJU 8/1, Bandar Damansara Perdana, 47820 Petaling Jaya, Selangor, Malaysia
(Basement & retaining wall works)

Electrical Contractor Letrik PJ Union Sdn Bhd
Contact Mr Wong Kok Foo (Project Director) Click this to generate / export label Click this to generate letter
60 3 7803 2266 Æ’ 60 3 7803 2269
Email: info@pjunion.com Website: www.pjunion.com
2, Jalan SS25/35, Taman Mayang, 47301 Petaling Jaya, Selangor, Malaysia
(Earthing protection)

Mechanical Ventilation and Air Condition (MVAC) Sub-Contractor ISE Air-Cond & Engineering Sdn Bhd
Contact Mr Jack Lim Man Foo (Director) Click this to generate / export label Click this to generate letter
60 3 4107 2226 Æ’ 60 3 4107 2207
Email: ise2000_my@yahoo.com
10, Jalan E1, Phase 4, Taman Melawati, 53100 Kuala Lumpur, Federal Territory, Malaysia

Building Contractor Gainvest Builders (M) Sdn Bhd (subsidiary of Gainvest Corporation (M) Sdn Bhd)
Contact Mr Ivan Ho (Contract Manager) Click this to generate / export label Click this to generate letter
60 3 7803 6368 Æ’ 60 3 7880 0169
Email: ivanho@gainvest.com.my Website: www.gainvestco.com
69, Jalan SS 6/10, Kelana Jaya, 47301 Petaling Jaya, Selangor, Malaysia

Electrical Sub-Contractor Mecomb Malaysia Sdn Bhd
Contact Mr YH Lee (Project Manager) Click this to generate / export label Click this to generate letter
60 3 7874 3422 Æ’ 60 3 7874 3414
Email: mecomb@simedarby.com Website: www.simedarbyenergyutilities.com/Mecomb_Group.aspx
Lot 20, Jalan 225, 46100 Petaling Jaya, Selangor, Malaysia
(Low-voltage (LV) works)

Fire Protection Sub-Contractor Kumpulan Protection Sdn Bhd
Contact Mr Chuah Yew Chai (Director) Click this to generate / export label Click this to generate letter
60 3 6272 8220 Æ’ 60 3 6272 8235
Email: kumpulanprotection@gmail.com Website: www.kumpulanprotection.com
20, Jalan Cempaka SD12/2, Bandar Sri Damansara, 52200 Kuala Lumpur, Federal Territory, Malaysia

Lift Installation Sub-Contractor KONE Elevator (M) Sdn Bhd
Contact Mr Low Lee Fuat (Project Manager) Click this to generate / export label Click this to generate letter
60 3 7494 7500 Æ’ 60 3 7784 1263
Website: www.kone.com
Suite 3.02, 3rd Floor, Wisma Ali Bawal 2, No.11, Jalan Tandang, 46050 Petaling Jaya, Selangor, Malaysia
(Lifts & escalators)

Sanitary & Plumbing Sub-Contractor Chia & Chia Plumbing Sdn Bhd (formerly Riati Chia)
Contact Mr Michael Chia (Project Director) Click this to generate / export label Click this to generate letter
60 3 4294 2888 Æ’ 60 3 4294 2799
Email: riatichia@yahoo.com.my
53, Wisma Chia, Jalan Bunga Tanjung 18, Taman Saraya, 56100 Kuala Lumpur, Federal Territory, Malaysia
(Cold water sanitary plumbing & rainwater downpipes)

Telecommunication Sub-Contractor Mecomb Malaysia Sdn Bhd
Contact Mr Shahrun Nizam (Project Manager) Click this to generate / export label Click this to generate letter
60 3 7874 3422 Æ’ 60 3 7874 3414
Email: mecomb@simedarby.com Website: www.simedarbyenergyutilities.com/Mecomb_Group.aspx
Lot 20, Jalan 225, 46100 Petaling Jaya, Selangor, Malaysia

Waterproof Sub-Contractor Duracon Systems
Contact Mr Colindasamy (General Manager) Click this to generate / export label Click this to generate letter
60 7 351 2212 Æ’ 60 7 355 0146
Email: duracon_34@yahoo.com
34 Jalan Ros Merah 3/2, Taman Johor Jaya, 81100 Johor Bahru, Johore, Malaysia
(Basement & superstructures)

Quicseal Construction Sdn Bhd, Kuala Lumpur
Contact Mr Kan Chee Kin (Office Manager) Click this to generate / export label Click this to generate letter
60 3 7982 3699 Æ’ 60 3 7982 6088
Email: sales_my@quicseal.com Website: www.quicseal.com
D-0-3, Pusat Perdagangan Kuchai Lama, No.2, Jalan 1/127, Off Jalan Kuchai Lama, 58200 Kuala Lumpur, Federal Territory, Malaysia

Show-unit Contractor Arky Bina Sdn Bhd
Contact Mr Ooi Gik Seng (Purchasing Executive) Click this to generate / export label Click this to generate letter
60 3 5882 6130 Æ’ 60 3 5882 6033
Email: arkybina@yahoo.com
31, 2nd Floor, Jalan BPU 8, Bandar Puchong Utama, 47100 Puchong, Selangor, Malaysia

Extra Low Voltage(ELV) Subcontractor Letrik PJ Union Sdn Bhd
Contact Mr Wong Kok Foo (Project Director) Click this to generate / export label Click this to generate letter
60 3 7803 2266 Æ’ 60 3 7803 2269
Email: info@pjunion.com Website: www.pjunion.com
2, Jalan SS25/35, Taman Mayang, 47301 Petaling Jaya, Selangor, Malaysia

Supplier Buildcon Concrete Sdn Bhd (subsidiary of YTL Cement Bhd)
Contact Mr Aaron Ee (Sales Executive) Click this to generate / export label Click this to generate letter
60 18 799 7238 / 7231 / 7229 Æ’ 60 18 818 7222
Email: sales@ytlcement.com Website: www.ytlcement.com
10th Floor, Oriental Place, 1, Jalan Hang Lekiu, 50100 Kuala Lumpur, Federal Territory, Malaysia
(Concrete Supplier)

Gainvest Corporation (M) Shd Bhd
Contact Ms Loh (Puchasing Officer) Click this to generate / export label Click this to generate letter
60 3 7803 6368 Æ’ 60 3 7880 0169
Website: www.gainvestco.com
69, Jalan SS 6/10, Kelana Jaya, 47301 Petaling Jaya, Selangor, Malaysia
(In-house Supplier)

Cemex Concrete Sdn Bhd
Contact Mr Chin Man Sam Click this to generate / export label Click this to generate letter
60 3 7490 1500 Æ’ 60 3 7490 1600
Website: www.cemex.com
16th Floor, Block B, HP Towers, 12, Jalan Gelenggang, Damansara Heights, 50490 Kuala Lumpur, Federal Territory, Malaysia
(Concrete Supplier)

Facade Contractor L & L Glass Aluminium Trading Sdn Bhd
Contact Mr Ow Kok Peng (Contract Manager) Click this to generate / export label Click this to generate letter
60 3 8025 1128 Æ’ 60 3 8024 0218
Email: llgalum@yahoo.com
Lot 893A, Jalan Subang 9, Taman Industri Sungai Penaga, 47620 Subang Jaya, Selangor, Malaysia
(Aluminium & glass glazing works)

Swimming pool contractor KSPC (M) Sdn Bhd (formerly Kam Seng Plumbing & Construction)
Contact Mr Faizal (Site Supervisor) Click this to generate / export label Click this to generate letter
60 3 9200 4428 Æ’ 60 3 9281 3600
Email: admin@kspcpool.com Website: www.kspcpool.com
23A, Jalan Cempaka 15, Taman Cempaka, 68000 Ampang, Selangor, Malaysia





(For you to take direct contact to....) rclxm9.gif
iancyteo
post Aug 26 2014, 08:20 PM

Getting Started
**
Junior Member
135 posts

Joined: Nov 2009


QUOTE(W4828J @ Aug 26 2014, 06:53 PM)
FIND FOR FRONT LOAD OR ELECTRIC APP , CAN FIND ME , ALL WELCOME ...  thumbup.gif
*
Yes bro. Please share me the brand, model and price for fridge, washer w/ or w/o dryer. I'm interested.
ReKz
post Aug 27 2014, 11:05 AM

New Member
*
Junior Member
7 posts

Joined: Aug 2014


QUOTE(iancyteo @ Aug 26 2014, 08:20 PM)
Yes bro. Please share me the brand, model and price for fridge, washer w/ or w/o dryer. I'm interested.
*
Yes please share. I'd like to know too. Thank you.
ojwong
post Aug 27 2014, 11:13 AM

New Member
*
Junior Member
25 posts

Joined: Jul 2010


I got quote rm1350 for front grill door and rm1800 for full height storage compartment (for 705sqft unit beside bathroom)

Anyone got better quote?

Thanks
ReKz
post Aug 27 2014, 11:24 AM

New Member
*
Junior Member
7 posts

Joined: Aug 2014


QUOTE(W4828J @ Aug 24 2014, 02:03 PM)
dont worry , The Element look good , only roof top and parking , .......
others still  thumbup.gif
*
Oh my God... actually I have to admit the exterior looks amazing inspite of all the unfinished work. But I'm not at all pleased with the finishing of our unit. Too many complaints. The workmanship is really bad. I'm in a state of shock. May be because I have never seen such poor workmanship here in Seremban or Nilai in the properties we have bought or invested. Even the regular contractors here are so reliable. But this is an exclusive apartment. Really? And the worst part now is that we bought our unit on the 39th floor facing KLCC all because of the promises made and now the RISDA office building is coming up. It's going to be over 50 floors it seems. There goes the view and not to mention all the noise and pollution! We are seriously considering if we should sell of the unit or try our luck in doing up the unit nicely and renting it out. Extremely disappointing. Their marketing strategy was full of promises. They are definitely not going to get a good review from me and many others whenever we speak to others. No credibility in many ways sorry to say.
iancyteo
post Aug 27 2014, 11:42 AM

Getting Started
**
Junior Member
135 posts

Joined: Nov 2009


QUOTE(ojwong @ Aug 27 2014, 12:13 PM)
I got quote rm1350 for front grill door and rm1800 for full height storage compartment (for 705sqft unit beside bathroom)

Anyone got better quote?

Thanks
*
Not sure is the size of storage compartment same for 705 and 640. I got mine at RM1500 for the customized storage compartment.

I still hesitating to install grill door. I will consider something else.
ReKz
post Aug 27 2014, 11:45 AM

New Member
*
Junior Member
7 posts

Joined: Aug 2014


QUOTE(1282009 @ Aug 21 2014, 08:26 PM)
Are yours high floor unit?
*
Same here. Just collected keys 2 days ago. Living room AC leaking. Most windows cannot be locked. About 5 tiles in bathroom has slight cracks. Cupboard provided of low quality and defects. Parquet flooring finishing is dull. Overall the apartment looks exceptionally amazing from the outside but on the inside it's like any other apartment.
iancyteo
post Aug 27 2014, 11:58 AM

Getting Started
**
Junior Member
135 posts

Joined: Nov 2009


QUOTE(ReKz @ Aug 27 2014, 12:24 PM)
Oh my God... actually I have to admit the exterior looks amazing inspite of all the unfinished work. But I'm not at all pleased with the finishing of our unit. Too many complaints. The workmanship is really bad. I'm in a state of shock. May be because I have never seen such poor workmanship here in Seremban or Nilai in the properties we have bought or invested. Even the regular contractors here are so reliable. But this is an exclusive apartment. Really? And the worst part now is that we bought our unit on the 39th floor facing KLCC all because of the promises made and now the RISDA office building is coming up. It's going to be over 50 floors it seems. There goes the view and not to mention all the noise and pollution! We are seriously considering if we should sell of the unit or try our luck in doing up the unit nicely and renting it out. Extremely disappointing. Their marketing strategy was full of promises. They are definitely not going to get a good review from me and many others whenever we speak to others. No credibility in many ways sorry to say.
*
From what I can see the development now and future.

On going project:
1.) M-City
2.) Arte+

Coming project:
1.) Risda re-development
2.) Ampang City Plaza re-development
3.) Elements 2

Rumor:
1.) MRT circle line (station said to be at Ampang Point)
2.) Pavillion 2 at Flamingo Hotel and Resort

Potential project:
1.) The land infront of Arte+

So, I foresee this area gonna be very busy within the next 10 years.

What you think if you want to stay in an area full of construction? or buying a sub-sale in this area?

To me, not now... but after everything completed, that could be a totally different story.

(There are more on-going and coming projects along Jalan Ampang, all are selling much expensive PSF price compare to Elements.)

What I like most about Elements are:
1.) Freehold
2.) Residential title
3.) It is closed to but next to the heavy noisy dusty Jalan Ampang, MRR2 and AKLEH.
ReKz
post Aug 27 2014, 12:11 PM

New Member
*
Junior Member
7 posts

Joined: Aug 2014


QUOTE(iancyteo @ Aug 27 2014, 11:58 AM)
From what I can see the development now and future.

On going project:
1.) M-City
2.) Arte+

Coming project:
1.) Risda re-development
2.) Ampang City Plaza re-development
3.) Elements 2

Rumor:
1.) MRT circle line (station said to be at Ampang Point)
2.) Pavillion 2 at Flamingo Hotel and Resort

Potential project:
1.) The land infront of Arte+

So, I foresee this area gonna be very busy within the next 10 years.

What you think if you want to stay in an area full of construction? or buying a sub-sale in this area?

To me, not now... but after everything completed, that could be a totally different story.

(There are more on-going and coming projects along Jalan Ampang, all are selling much expensive PSF price compare to Elements.)

What I like most about Elements are:
1.) Freehold
2.) Residential title
3.) It is closed to but next to the heavy noisy dusty Jalan Ampang, MRR2 and AKLEH.
*
So you think this is a good investment?

ReKz
post Aug 27 2014, 12:14 PM

New Member
*
Junior Member
7 posts

Joined: Aug 2014


QUOTE(ReKz @ Aug 27 2014, 12:11 PM)
So you think this is a good investment?
*
So in short you are saying that we will be able to see the benefits and returns in long term?
iancyteo
post Aug 27 2014, 01:13 PM

Getting Started
**
Junior Member
135 posts

Joined: Nov 2009


QUOTE(ReKz @ Aug 27 2014, 01:11 PM)
So you think this is a good investment?
*
QUOTE(ReKz @ Aug 27 2014, 01:14 PM)
So in short you are saying that we will be able to see the benefits and returns in long term?
*
Depend what you want. If you are flipper or do not have holding power, I do not see you can benefit from it.
Property investment is always brighter in long term than short term.

72 Pages « < 56 57 58 59 60 > » Top
 

Change to:
| Lo-Fi Version
0.0285sec    0.56    6 queries    GZIP Disabled
Time is now: 1st December 2025 - 09:29 PM