Welcome Guest ( Log In | Register )

Outline · [ Standard ] · Linear+

> Ultimate Sg Buloh-Kajang MRT construction thread

views
     
spacelion
post Aug 12 2013, 01:04 PM

Ada Liu
******
Senior Member
1,692 posts

Joined: Mar 2009
From: Probation?
does anyone have architect picture for kota damansara station? i think that's the one where they stack 2 platform on top of each other, i cant seem to visualize it.
spacelion
post Aug 12 2013, 07:29 PM

Ada Liu
******
Senior Member
1,692 posts

Joined: Mar 2009
From: Probation?
QUOTE(jonc88 @ Aug 12 2013, 05:13 PM)

Where did you hear that it is stacked..? As far as I know, the only stacked stations are Bukit Bintang and Pasar Rakyat..
*
when i look at all the m&e drawing, it is the only elevated station with more than 1 platform.
spacelion
post Aug 13 2013, 05:53 PM

Ada Liu
******
Senior Member
1,692 posts

Joined: Mar 2009
From: Probation?
QUOTE(jonc88 @ Aug 12 2013, 10:03 PM)
Haha, I see.. More than one platform doesn't mean stacked.. From what I know, there is supposed to be a depot nearby.. Perhaps this is an extra track for ease of allowing trains to enter or exit the main line from the depot..  smile.gif
*
it's ok, i got the drawing to visualize, it is a stacked platform (top is southbound and bottom is northbound), sorry cant share it ya smile.gif
spacelion
post Aug 13 2013, 09:27 PM

Ada Liu
******
Senior Member
1,692 posts

Joined: Mar 2009
From: Probation?
QUOTE(jonc88 @ Aug 13 2013, 07:51 PM)
If so, quite interesting.. Would look something like Bangkok's Siam station I suppose..
*
ya, i looked at the pictures and it\s roughly the same design
spacelion
post Aug 30 2013, 07:53 PM

Ada Liu
******
Senior Member
1,692 posts

Joined: Mar 2009
From: Probation?
QUOTE(De_Luffy @ Aug 20 2013, 04:34 PM)
should make it 6 cars instead, 4 cars sure cramped again
*
the idea is to increase the number of trains in the future, about 77 trains target by 2020 iinm . That's the current plan they discuss during meeting, might change later on.
spacelion
post Oct 10 2013, 11:21 AM

Ada Liu
******
Senior Member
1,692 posts

Joined: Mar 2009
From: Probation?
another 6 month to sg buloh dpt1 site access and installation works >.<
spacelion
post Oct 22 2013, 12:21 PM

Ada Liu
******
Senior Member
1,692 posts

Joined: Mar 2009
From: Probation?
kampung if u drop by gamuda building u can find the 2nd mrt newsletter
spacelion
post Oct 24 2013, 11:06 AM

Ada Liu
******
Senior Member
1,692 posts

Joined: Mar 2009
From: Probation?
QUOTE(Kampung2005 @ Oct 23 2013, 10:17 PM)
2nd MRT newsletter by Gamuda or MRT Corp? smile.gif
*
this is gamuda or MRT thread?
spacelion
post Dec 3 2013, 02:36 PM

Ada Liu
******
Senior Member
1,692 posts

Joined: Mar 2009
From: Probation?
need to lay track

then the power cable go on the track from stesen to stesen

then we go install stuff lorh
spacelion
post Jan 14 2014, 11:51 PM

Ada Liu
******
Senior Member
1,692 posts

Joined: Mar 2009
From: Probation?
hopefully delayed a bit

bcos schedule a bit tight for our side as well >.<
spacelion
post Sep 2 2014, 11:38 AM

Ada Liu
******
Senior Member
1,692 posts

Joined: Mar 2009
From: Probation?
WOIIIIIIIIIIIII

WHY BIJAN CHANGE ALMOST 60% OF THE MRT STESEN NAME

HOW TO REMEMBER NEW NAME
spacelion
post Nov 23 2014, 08:34 PM

Ada Liu
******
Senior Member
1,692 posts

Joined: Mar 2009
From: Probation?
QUOTE(jonc88 @ Nov 23 2014, 08:25 PM)
TRC Website - Package V1 - Sungai Buloh, Kampung Selamat, Kwasa Damansara (Sept 2014)
Oh, that's right. Weren't they the contractor that was involved with the MRT beam collapse also? See a trend?


*
huh? wrong company ka
spacelion
post Nov 23 2014, 08:43 PM

Ada Liu
******
Senior Member
1,692 posts

Joined: Mar 2009
From: Probation?
QUOTE(jonc88 @ Nov 23 2014, 08:37 PM)
They've also had lots of incidents on LEP Kelana Jaya Line package A
*
yeah but i dont recall them being responsible for the Kwasa damansara mrt beam collapse
spacelion
post Dec 2 2014, 03:23 PM

Ada Liu
******
Senior Member
1,692 posts

Joined: Mar 2009
From: Probation?
QUOTE(jonc88 @ Dec 2 2014, 10:21 AM)
Package V1 is under their charge. The accident happened in package V1 no? If not them, which company then? Care to clarify? Thanks.
*
SMPP sdn bhd

spacelion
post Dec 3 2014, 08:22 PM

Ada Liu
******
Senior Member
1,692 posts

Joined: Mar 2009
From: Probation?
QUOTE(jonc88 @ Dec 3 2014, 07:50 PM)
TRC website shows Package V1 as one of their projects. They should be a sub-contractor there then. In any case, highly suspicious that the MRT project they are working on also had an accident.
*
yes they are subcon but not the one responsible for the loss of life

anyway u should be suspicious of all construction in Malaysia , u think any of them got 0 accident before meh ???

Bump Topic Add ReplyOptions New Topic
 

Change to:
| Lo-Fi Version
0.0212sec    0.75    7 queries    GZIP Disabled
Time is now: 18th December 2025 - 04:38 AM