Welcome Guest ( Log In | Register )

52 Pages « < 21 22 23 24 25 > » Bottom

Outline · [ Standard ] · Linear+

> Ultimate LRT extension construction update thread!, Ara Damansara, USJ, Puchong!

views
     
stimix
post Dec 5 2012, 09:16 PM

Dunno
Group Icon
Moderator
3,542 posts

Joined: Jan 2003
From: Puchong, Selangor



QUOTE(JinXXX @ Dec 5 2012, 09:12 PM)
can;t see anything looks like.. ahhh nothing there... lol

thanks for sharing..
*
Kampung area for sure can't really see anything.. BTW, not far from the side I took this picture, suppose to be the stn 12 in the middle of the kampong!
TSKampung2005
post Dec 6 2012, 04:36 AM

Proudly Kampungite, will always be one.
Group Icon
VIP
3,028 posts

Joined: Feb 2005
From: 梅田,大阪 //Sabah
QUOTE(stimix @ Dec 5 2012, 09:16 PM)
Kampung area for sure can't really see anything.. BTW, not far from the side I took this picture, suppose to be the stn 12 in the middle of the kampong!
*
Stn 12 won't be there in the initial stage.
stimix
post Dec 6 2012, 08:58 AM

Dunno
Group Icon
Moderator
3,542 posts

Joined: Jan 2003
From: Puchong, Selangor



Yeah. Stn 12 already been postponed/stopped after heavy protest from kampung folks...good also as..no one can imagine a LRT stn in the middle of not so densely populated kampung haha.

Anyway...as per the photo, lotsa activities on the other side of the river (Sunway) compare to No activities at all after stn 7 onwards on Puchong side
ANNIYAN_X
post Dec 6 2012, 11:34 AM

On my way
****
Senior Member
572 posts

Joined: Dec 2011


QUOTE(stimix @ Dec 6 2012, 08:58 AM)
Yeah. Stn 12 already been postponed/stopped after heavy protest from kampung folks...good also as..no one can imagine a LRT stn in the middle of not so densely populated kampung haha.

Anyway...as per the photo, lotsa activities on the other side of the river (Sunway) compare to No activities at all after stn 7 onwards on Puchong side
*
in can be either way.. the populations can increase in kampung..let say in future thy development any malays reversed land there into a condo/watsoever(only imaginations, low density luxury condo in middle of serene kampung enviroment,kekekeke),sure all they bumi's will buy there mah..... maybe thts the goverment future plan...anyway the kampung folks heavily reject the lrt..i guess/sure they same old folks will come and use station 11/10..... so will add crowd to that 2 stations..mst probably will station 11... looking the station currently built in puchong...each station can almost walking distance to the residential place.. if station 12 is built..all kampung folks can use station 12...puchong prima residendent can use station 11. puchong perdana residents can use station 10... so no over crowd,illegal parking will reduce, coz all can walk to the stations.....i think they should built it... just like MRT..although some place got heavy protest..still teh project is ON... sometimes TRANSFORMATION comes with some sacrifice's too........ hope the plan on station 12 wil become reality... others tasek prima/putra prima/taman mas can choose with ever nearer..
TSKampung2005
post Dec 6 2012, 11:40 AM

Proudly Kampungite, will always be one.
Group Icon
VIP
3,028 posts

Joined: Feb 2005
From: 梅田,大阪 //Sabah
Trains for the new Ampang line will be automated, just like MTR West Rail Line smile.gif
stimix
post Dec 6 2012, 12:08 PM

Dunno
Group Icon
Moderator
3,542 posts

Joined: Jan 2003
From: Puchong, Selangor



QUOTE(ANNIYAN_X @ Dec 6 2012, 11:34 AM)
in can be either way.. the populations can increase in kampung..let say in future thy development any malays reversed land there into a condo/watsoever(only imaginations, low density luxury condo in middle of serene kampung enviroment,kekekeke),sure all they bumi's will buy there mah..... maybe thts the goverment future plan...anyway the kampung folks heavily  reject the lrt..i guess/sure they same old folks will come and use station 11/10..... so will add crowd to that 2 stations..mst probably will station 11... looking the station currently built in puchong...each station can almost walking distance to the residential place.. if station 12 is built..all kampung folks can use station 12...puchong prima residendent can use station 11. puchong perdana residents can use station 10... so no over crowd,illegal parking will reduce, coz all can walk to the stations.....i think they should built it... just like MRT..although some place got heavy protest..still teh project is ON... sometimes TRANSFORMATION comes with some sacrifice's too........ hope the plan on station 12 wil become reality... others tasek prima/putra prima/taman mas can choose with ever nearer..
*
I am hoping they will extend the rail track across the river and doubled up as small road connecting Putra Height & Puchong brows.gif ...Toll free to USJ side rclxms.gif
jonc88
post Dec 8 2012, 11:15 PM

New Member
*
Newbie
0 posts

Joined: Oct 2012


http://danielc5592.files.wordpress.com/201...hq2111cw051.jpg

Taken from http://danielc5592.wordpress.com/2012/11/2...ter-of-2012-pm/

This post has been edited by jonc88: Dec 8 2012, 11:16 PM
tokdukun
post Dec 9 2012, 03:33 AM

Casual
***
Junior Member
376 posts

Joined: Nov 2006


QUOTE(Kampung2005 @ Dec 6 2012, 11:40 AM)
Trains for the new Ampang line will be automated, just like MTR West Rail Line smile.gif
*
What will happen to current trains? Reconfigure to become driverless as well?
TSKampung2005
post Dec 9 2012, 03:35 AM

Proudly Kampungite, will always be one.
Group Icon
VIP
3,028 posts

Joined: Feb 2005
From: 梅田,大阪 //Sabah
QUOTE(tokdukun @ Dec 9 2012, 03:33 AM)
What will happen to current trains? Reconfigure to become driverless as well?
*
Probably, as the existing trains will undergo mid life refurbishment too.
TSKampung2005
post Dec 10 2012, 12:44 AM

Proudly Kampungite, will always be one.
Group Icon
VIP
3,028 posts

Joined: Feb 2005
From: 梅田,大阪 //Sabah

Completed LRT extension section just after Sri Petaling station

Photos are all taken by sapphire blue (SSC Malaysia)

QUOTE
user posted image

Uploaded with ImageShack.us

user posted image

Uploaded with ImageShack.us

mohdhamri
post Dec 14 2012, 02:41 PM

New Member
*
Newbie
0 posts

Joined: Dec 2012

Sunway got MRT maaa.....


QUOTE(gjohn @ Jan 17 2012, 12:15 PM)
why dun have in sunway??/haiyaaaa....
to bad..
otherwise can go work by lrt..
*
mohdhamri
post Dec 14 2012, 02:43 PM

New Member
*
Newbie
0 posts

Joined: Dec 2012

Thats called LOAD TEST . 1 or 1.25 Ton for each cube.



QUOTE(JinXXX @ Jan 17 2012, 11:59 AM)
just curious

in the constuction industry whats the purpose of the stone block stacking ??

like in the second picture.. what is it for ? the stacking ?
*
TSKampung2005
post Dec 14 2012, 02:55 PM

Proudly Kampungite, will always be one.
Group Icon
VIP
3,028 posts

Joined: Feb 2005
From: 梅田,大阪 //Sabah
QUOTE(mohdhamri @ Dec 14 2012, 02:41 PM)
Sunway got MRT maaa.....
*
BRT with LRT transfer at USJ6
gjohn
post Dec 14 2012, 03:33 PM

Casual
***
Junior Member
388 posts

Joined: Oct 2008
QUOTE(Kampung2005 @ Dec 10 2012, 12:44 AM)
Completed LRT extension section just after Sri Petaling station

Photos are all taken by sapphire blue (SSC Malaysia)

*
wow...completed...
stimix
post Dec 14 2012, 05:45 PM

Dunno
Group Icon
Moderator
3,542 posts

Joined: Jan 2003
From: Puchong, Selangor



QUOTE(gjohn @ Dec 14 2012, 03:33 PM)
wow...completed...
*
Only the viaduct.. still no station.. furthermore the viaduct already completed months ago..nothing new.. now waiting for the station.
firewire
post Dec 17 2012, 10:24 AM

Enthusiast
*****
Senior Member
785 posts

Joined: Jan 2003
From: http://sewnstitches.blogspot.com/
when is this LRT extension going to be completed? end of 2013? beginning of 2014?
TSKampung2005
post Dec 17 2012, 11:19 AM

Proudly Kampungite, will always be one.
Group Icon
VIP
3,028 posts

Joined: Feb 2005
From: 梅田,大阪 //Sabah
QUOTE(firewire @ Dec 17 2012, 10:24 AM)
when is this LRT extension going to be completed? end of 2013? beginning of 2014?
*
2015.
firewire
post Dec 17 2012, 12:08 PM

Enthusiast
*****
Senior Member
785 posts

Joined: Jan 2003
From: http://sewnstitches.blogspot.com/
QUOTE(Kampung2005 @ Dec 17 2012, 11:19 AM)
2015.
*
what causes the delay, i remember it was written that it is suppose to complete by end of 2013/beginning of 2014
TSKampung2005
post Dec 17 2012, 02:21 PM

Proudly Kampungite, will always be one.
Group Icon
VIP
3,028 posts

Joined: Feb 2005
From: 梅田,大阪 //Sabah
QUOTE(firewire @ Dec 17 2012, 12:08 PM)
what causes the delay, i remember it was written that it is suppose to complete by end of 2013/beginning of 2014
*
Land and access to construction site.
jonc88
post Dec 18 2012, 09:57 PM

New Member
*
Newbie
0 posts

Joined: Oct 2012


QUOTE(firewire @ Dec 17 2012, 12:08 PM)
what causes the delay, i remember it was written that it is suppose to complete by end of 2013/beginning of 2014
*
I always thought it was end 2014/early 2015 once the construction stage had begun.

To be honest, the date has changed several times though. When first announced, it was toyed around with, then 2012, then 2014.

52 Pages « < 21 22 23 24 25 > » 
Bump Topic Add ReplyOptions New Topic
 

Change to:
| Lo-Fi Version
0.0296sec    2.14    6 queries    GZIP Disabled
Time is now: 23rd December 2025 - 05:33 AM