U dun ka-kacau-cau... Puchong till IOI Mall also gooding liao... and IOI mall also started already..can see batangs liao
Ultimate LRT extension construction update thread!, Ara Damansara, USJ, Puchong!
Ultimate LRT extension construction update thread!, Ara Damansara, USJ, Puchong!
|
|
Nov 18 2012, 09:34 AM
|
|
Moderator
3,542 posts Joined: Jan 2003 From: Puchong, Selangor |
U dun ka-kacau-cau... Puchong till IOI Mall also gooding liao... and IOI mall also started already..can see batangs liao
|
|
|
Nov 18 2012, 09:36 AM
|
![]()
Junior Member
10 posts Joined: Feb 2005 |
hahahah batangs coming up liao.
|
|
|
Nov 23 2012, 03:32 PM
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
Subang Jaya station, near to KTM station
23/11/2012 ![]() ![]() ![]() |
|
|
Nov 24 2012, 10:08 AM
|
![]()
Newbie
0 posts Joined: Oct 2012 |
Thanks for the photos. Progress is looking good.
|
|
|
Nov 24 2012, 10:11 AM
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
QUOTE(jonc88 @ Nov 24 2012, 10:08 AM) Progress of the Kelana Jaya line is very good indeed. The A package by TRC is quite ahead, and the B package of Sunway are also moving fast.Ampang line extension is slower, but good to see the Puchong section finally gaining momentum, with the pier beginning to appear near IOI Mall. It would be interesting to see the design of the USJ6 LRT station as it will incorporate the Sunway BRT. |
|
|
Nov 24 2012, 10:22 AM
|
![]()
Newbie
0 posts Joined: Oct 2012 |
That one would be messy for sure. Can imagine Ampang Line progress is slower as seen from the photos here.
Shall see whether I can drop by in mid-December and take a look around the areas as well. Have they started launching the segments that will join the existing line to the new extension track near Lembah Subang depot for Kelana Jaya Line? Its at the portion near the NKVE. |
|
|
Nov 24 2012, 10:23 AM
|
![]() ![]()
Junior Member
149 posts Joined: Oct 2012 |
as always, cheras kajang area still got no batangs
lembab |
|
|
Nov 24 2012, 10:23 AM
|
![]() ![]()
Junior Member
202 posts Joined: Nov 2010 |
QUOTE(Kampung2005 @ Nov 24 2012, 10:11 AM) Progress of the Kelana Jaya line is very good indeed. The A package by TRC is quite ahead, and the B package of Sunway are also moving fast. Attended a meeting with Prasarana and MPSJ discussing how work would be done and to minimise the negative effects on residents of USJ. Ampang line extension is slower, but good to see the Puchong section finally gaining momentum, with the pier beginning to appear near IOI Mall. It would be interesting to see the design of the USJ6 LRT station as it will incorporate the Sunway BRT. USJ 6 station would be a huge one. Now they're digging further down the drains at USJ 6 and placing cement tubes to replace the traditional open drains. |
|
|
Nov 24 2012, 10:24 AM
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
|
|
|
Nov 24 2012, 10:25 AM
|
![]() ![]()
Junior Member
149 posts Joined: Oct 2012 |
|
|
|
Nov 24 2012, 10:26 AM
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
QUOTE(jonc88 @ Nov 24 2012, 10:22 AM) That one would be messy for sure. Can imagine Ampang Line progress is slower as seen from the photos here. That section (NKVE) I haven't check anything since 2 months ago.Shall see whether I can drop by in mid-December and take a look around the areas as well. Have they started launching the segments that will join the existing line to the new extension track near Lembah Subang depot for Kelana Jaya Line? Its at the portion near the NKVE. QUOTE(thexs @ Nov 24 2012, 10:23 AM) Attended a meeting with Prasarana and MPSJ discussing how work would be done and to minimise the negative effects on residents of USJ. Interesting.USJ 6 station would be a huge one. Now they're digging further down the drains at USJ 6 and placing cement tubes to replace the traditional open drains. There would be a separate session for the Sunway BRT. |
|
|
Nov 24 2012, 10:27 AM
|
![]()
Newbie
0 posts Joined: Oct 2012 |
QUOTE(Kampung2005 @ Nov 24 2012, 10:24 AM) MRT would take longer anyway since that project started later than the LEP. These extensions have been on the drawing boards for at least 6 years, so its not surprising that these have seemingly more progress considering that they have been discussing it back and forth for ages. So all the necessary clearances would have been approved as compared to the MRT which is relatively newer. |
|
|
Nov 24 2012, 10:30 AM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
2,147 posts Joined: Mar 2005 |
QUOTE(Kampung2005 @ Nov 24 2012, 10:26 AM) That section (NKVE) I haven't check anything since 2 months ago. the near NKVE part they have erected the pillars but not connected just yet. I think they've stopped progressing for a month now. Since the one pillar that connects from the depot to the one crossing the nkve is experiencing heavy flood for the past few weeks (heavy rain). The road will be flooded and Im guessing they (contractors) are checking if the soil had sunken due to the flood.Interesting. There would be a separate session for the Sunway BRT. |
|
|
Nov 24 2012, 10:35 AM
|
![]()
Newbie
0 posts Joined: Oct 2012 |
QUOTE(Kampung2005 @ Nov 24 2012, 10:26 AM) No worries. QUOTE(farique @ Nov 24 2012, 10:30 AM) the near NKVE part they have erected the pillars but not connected just yet. I think they've stopped progressing for a month now. Since the one pillar that connects from the depot to the one crossing the nkve is experiencing heavy flood for the past few weeks (heavy rain). The road will be flooded and Im guessing they (contractors) are checking if the soil had sunken due to the flood. Thanks for the info. The last photo posted of that area shows the truss launcher still at the same place as when I went around the area. That was around July? |
|
|
Nov 25 2012, 09:25 PM
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
Jalan Jengka, Subang Jaya
Date : 25/11/2012 ![]() ![]() |
|
|
Nov 25 2012, 11:29 PM
|
|
Moderator
3,542 posts Joined: Jan 2003 From: Puchong, Selangor |
All taken Yesterday & Today.
Kinrara - near Mercedes SC...The cornering track rail support laid -24/11 ![]() Kinrara- heading towards Zest 9 24/11: ![]() Special visit to Kg Muhibbah - Entry via Bkt Kuchai/Tmn Perindutrian OUG- View from far @ the narrow flyover on top of Kesas: ![]() Kg Muhibbah beside Stn 2- uo close: ![]() Surprisingly before that Kg Muhhibah side rail.. The Bkt OUG side still without rail track: ![]() |
|
|
Nov 25 2012, 11:32 PM
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
Nice progress!
How's Puchong? |
|
|
Nov 25 2012, 11:35 PM
|
|
Moderator
3,542 posts Joined: Jan 2003 From: Puchong, Selangor |
|
|
|
Nov 25 2012, 11:37 PM
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
QUOTE(stimix @ Nov 25 2012, 11:35 PM) Got 2 batangs up to the summit liao beside IOI Mall I hope the school issue can be sorted out as soon as possible.Really not a single work started beyond that area? |
|
|
Nov 25 2012, 11:43 PM
|
|
Moderator
3,542 posts Joined: Jan 2003 From: Puchong, Selangor |
QUOTE(Kampung2005 @ Nov 25 2012, 11:37 PM) I hope the school issue can be sorted out as soon as possible. There is some works opposite Wisma Tractor but still soil survey wth all the big rocks..There is also something going on beside rakan muda complex but can't really see bcos this site covered up.Really not a single work started beyond that area? Elseweher- Puchiong Perdan- not even single thing there. But opposite the river from Kg Sri Aman i.e Putra Height side, I can see soil testing works started liao |