> Ultimate LRT extension construction update thread!, Ara Damansara, USJ, Puchong!

views
     
stimix
post Nov 18 2012, 09:34 AM

Dunno
Group Icon
Moderator
3,542 posts

Joined: Jan 2003
From: Puchong, Selangor



U dun ka-kacau-cau... Puchong till IOI Mall also gooding liao... and IOI mall also started already..can see batangs liao
clipguy
post Nov 18 2012, 09:36 AM

New Member
*
Junior Member
10 posts

Joined: Feb 2005


hahahah batangs coming up liao.

TSKampung2005
post Nov 23 2012, 03:32 PM

Proudly Kampungite, will always be one.
Group Icon
VIP
3,028 posts

Joined: Feb 2005
From: 梅田,大阪 //Sabah
Subang Jaya station, near to KTM station

23/11/2012

user posted image

user posted image

user posted image
jonc88
post Nov 24 2012, 10:08 AM

New Member
*
Newbie
0 posts

Joined: Oct 2012


Thanks for the photos. Progress is looking good.
TSKampung2005
post Nov 24 2012, 10:11 AM

Proudly Kampungite, will always be one.
Group Icon
VIP
3,028 posts

Joined: Feb 2005
From: 梅田,大阪 //Sabah
QUOTE(jonc88 @ Nov 24 2012, 10:08 AM)
Thanks for the photos. Progress is looking good.
*
Progress of the Kelana Jaya line is very good indeed. The A package by TRC is quite ahead, and the B package of Sunway are also moving fast.

Ampang line extension is slower, but good to see the Puchong section finally gaining momentum, with the pier beginning to appear near IOI Mall.

It would be interesting to see the design of the USJ6 LRT station as it will incorporate the Sunway BRT.
jonc88
post Nov 24 2012, 10:22 AM

New Member
*
Newbie
0 posts

Joined: Oct 2012


That one would be messy for sure. Can imagine Ampang Line progress is slower as seen from the photos here.

Shall see whether I can drop by in mid-December and take a look around the areas as well. Have they started launching the segments that will join the existing line to the new extension track near Lembah Subang depot for Kelana Jaya Line? Its at the portion near the NKVE.
pr0pofol
post Nov 24 2012, 10:23 AM

Getting Started
**
Junior Member
149 posts

Joined: Oct 2012
as always, cheras kajang area still got no batangs
lembab
thexs
post Nov 24 2012, 10:23 AM

Getting Started
**
Junior Member
202 posts

Joined: Nov 2010


QUOTE(Kampung2005 @ Nov 24 2012, 10:11 AM)
Progress of the Kelana Jaya line is very good indeed. The A package by TRC is quite ahead, and the B package of Sunway are also moving fast.

Ampang line extension is slower, but good to see the Puchong section finally gaining momentum, with the pier beginning to appear near IOI Mall.

It would be interesting to see the design of the USJ6 LRT station as it will incorporate the Sunway BRT.
*
Attended a meeting with Prasarana and MPSJ discussing how work would be done and to minimise the negative effects on residents of USJ.

USJ 6 station would be a huge one.

Now they're digging further down the drains at USJ 6 and placing cement tubes to replace the traditional open drains.
TSKampung2005
post Nov 24 2012, 10:24 AM

Proudly Kampungite, will always be one.
Group Icon
VIP
3,028 posts

Joined: Feb 2005
From: 梅田,大阪 //Sabah
QUOTE(pr0pofol @ Nov 24 2012, 10:23 AM)
as always, cheras kajang area still got no batangs
lembab
*
This is LRT extension, not the MRT smile.gif
pr0pofol
post Nov 24 2012, 10:25 AM

Getting Started
**
Junior Member
149 posts

Joined: Oct 2012
QUOTE(Kampung2005 @ Nov 24 2012, 10:24 AM)
This is LRT extension, not the MRT smile.gif
*
eh heheh sorry
TSKampung2005
post Nov 24 2012, 10:26 AM

Proudly Kampungite, will always be one.
Group Icon
VIP
3,028 posts

Joined: Feb 2005
From: 梅田,大阪 //Sabah
QUOTE(jonc88 @ Nov 24 2012, 10:22 AM)
That one would be messy for sure. Can imagine Ampang Line progress is slower as seen from the photos here.

Shall see whether I can drop by in mid-December and take a look around the areas as well. Have they started launching the segments that will join the existing line to the new extension track near Lembah Subang depot for Kelana Jaya Line? Its at the portion near the NKVE.
*
That section (NKVE) I haven't check anything since 2 months ago.

QUOTE(thexs @ Nov 24 2012, 10:23 AM)
Attended a meeting with Prasarana and MPSJ discussing how work would be done and to minimise the negative effects on residents of USJ.

USJ 6 station would be a huge one.

Now they're digging further down the drains at USJ 6 and placing cement tubes to replace the traditional open drains.
*
Interesting.

There would be a separate session for the Sunway BRT.
jonc88
post Nov 24 2012, 10:27 AM

New Member
*
Newbie
0 posts

Joined: Oct 2012


QUOTE(Kampung2005 @ Nov 24 2012, 10:24 AM)
This is LRT extension, not the MRT smile.gif
*
MRT would take longer anyway since that project started later than the LEP. These extensions have been on the drawing boards for at least 6 years, so its not surprising that these have seemingly more progress considering that they have been discussing it back and forth for ages. So all the necessary clearances would have been approved as compared to the MRT which is relatively newer.
farique
post Nov 24 2012, 10:30 AM

8_8
*******
Senior Member
2,147 posts

Joined: Mar 2005
QUOTE(Kampung2005 @ Nov 24 2012, 10:26 AM)
That section (NKVE) I haven't check anything since 2 months ago.
Interesting.

There would be a separate session for the Sunway BRT.
*
the near NKVE part they have erected the pillars but not connected just yet. I think they've stopped progressing for a month now. Since the one pillar that connects from the depot to the one crossing the nkve is experiencing heavy flood for the past few weeks (heavy rain). The road will be flooded and Im guessing they (contractors) are checking if the soil had sunken due to the flood.
jonc88
post Nov 24 2012, 10:35 AM

New Member
*
Newbie
0 posts

Joined: Oct 2012


QUOTE(Kampung2005 @ Nov 24 2012, 10:26 AM)
That section (NKVE) I haven't check anything since 2 months ago.
Interesting.
*
No worries. smile.gif

QUOTE(farique @ Nov 24 2012, 10:30 AM)
the near NKVE part they have erected the pillars but not connected just yet. I think they've stopped progressing for a month now. Since the one pillar that connects from the depot to the one crossing the nkve is experiencing heavy flood for the past few weeks (heavy rain). The road will be flooded and Im guessing they (contractors) are checking if the soil had sunken due to the flood.
*
Thanks for the info. The last photo posted of that area shows the truss launcher still at the same place as when I went around the area. That was around July?
TSKampung2005
post Nov 25 2012, 09:25 PM

Proudly Kampungite, will always be one.
Group Icon
VIP
3,028 posts

Joined: Feb 2005
From: 梅田,大阪 //Sabah
Jalan Jengka, Subang Jaya

Date : 25/11/2012

user posted image

user posted image
stimix
post Nov 25 2012, 11:29 PM

Dunno
Group Icon
Moderator
3,542 posts

Joined: Jan 2003
From: Puchong, Selangor



All taken Yesterday & Today.

Kinrara - near Mercedes SC...The cornering track rail support laid -24/11
user posted image

Kinrara- heading towards Zest 9 24/11:
user posted image

Special visit to Kg Muhibbah - Entry via Bkt Kuchai/Tmn Perindutrian OUG- View from far @ the narrow flyover on top of Kesas:
user posted image

Kg Muhibbah beside Stn 2- uo close:
user posted image

Surprisingly before that Kg Muhhibah side rail.. The Bkt OUG side still without rail track:
user posted image



TSKampung2005
post Nov 25 2012, 11:32 PM

Proudly Kampungite, will always be one.
Group Icon
VIP
3,028 posts

Joined: Feb 2005
From: 梅田,大阪 //Sabah
Nice progress!

How's Puchong?
stimix
post Nov 25 2012, 11:35 PM

Dunno
Group Icon
Moderator
3,542 posts

Joined: Jan 2003
From: Puchong, Selangor



QUOTE(Kampung2005 @ Nov 25 2012, 11:32 PM)
Nice progress!

How's Puchong?
*
Got 2 batangs up to the summit liao beside IOI Mall brows.gif But din take any picture.. Works on more batangs also started in carpark area of IOI Mall, Beside Tesco & just b4 that Indian school.. Elsewhere... Nothing.. sad.gif
TSKampung2005
post Nov 25 2012, 11:37 PM

Proudly Kampungite, will always be one.
Group Icon
VIP
3,028 posts

Joined: Feb 2005
From: 梅田,大阪 //Sabah
QUOTE(stimix @ Nov 25 2012, 11:35 PM)
Got 2 batangs up to the summit liao beside IOI Mall  brows.gif But din take any picture.. Works on more batangs also started in carpark area of IOI Mall, Beside Tesco & just b4 that Indian school.. Elsewhere... Nothing..  sad.gif
*
I hope the school issue can be sorted out as soon as possible.

Really not a single work started beyond that area? hmm.gif
stimix
post Nov 25 2012, 11:43 PM

Dunno
Group Icon
Moderator
3,542 posts

Joined: Jan 2003
From: Puchong, Selangor



QUOTE(Kampung2005 @ Nov 25 2012, 11:37 PM)
I hope the school issue can be sorted out as soon as possible.

Really not a single work started beyond that area?  hmm.gif
*
There is some works opposite Wisma Tractor but still soil survey wth all the big rocks..There is also something going on beside rakan muda complex but can't really see bcos this site covered up.

Elseweher- Puchiong Perdan- not even single thing there. But opposite the river from Kg Sri Aman i.e Putra Height side, I can see soil testing works started liao