Ultimate LRT extension construction update thread!, Ara Damansara, USJ, Puchong!
|
thexs
|
Feb 12 2012, 06:05 PM
|
Getting Started

|
Unless the frequency and quality of the KTM is improved drastically, it is never a viable option for Malaysians.
Waited 40 mins and got molested not human take one.
|
|
|
|
|
|
thexs
|
Nov 24 2012, 10:23 AM
|
Getting Started

|
QUOTE(Kampung2005 @ Nov 24 2012, 10:11 AM) Progress of the Kelana Jaya line is very good indeed. The A package by TRC is quite ahead, and the B package of Sunway are also moving fast. Ampang line extension is slower, but good to see the Puchong section finally gaining momentum, with the pier beginning to appear near IOI Mall. It would be interesting to see the design of the USJ6 LRT station as it will incorporate the Sunway BRT. Attended a meeting with Prasarana and MPSJ discussing how work would be done and to minimise the negative effects on residents of USJ. USJ 6 station would be a huge one. Now they're digging further down the drains at USJ 6 and placing cement tubes to replace the traditional open drains.
|
|
|
|
|