Welcome Guest ( Log In | Register )

13 Pages « < 6 7 8 9 10 > » Bottom

Outline · [ Standard ] · Linear+

 Mah Sing Group to launch new M Residence@Rawang, from the star

views
     
kelvin2080
post Aug 31 2012, 11:00 AM

Casual
***
Junior Member
358 posts

Joined: Jul 2011
QUOTE(iLoveSunday @ Aug 31 2012, 10:03 AM)
for sure they giVing empty promises, since only f&g allowed but they keep say it will be g&g.
they say will provide basic treatment only,for professional pest control, u have to do it by yourself. the 24 mths warranty only on workmanship, termites attack not included.
looking at other available projects around rawang, im bit regret in buying this unit.....
*
I agreed..Meanwhile it's difficult to do it by our resident since not every residence are cooperate on this professional pest control things so that it's better control/ do it earlier during development phase... Mahsing dun know about this or pretend dun know? Guard house expensive???? or image are more important???? company Image is intangible cost....... Mahsing dun know how to calculate????

Yes.. I also bit regret to choose Mahsing in this rawang project.. MAHSING you will SPOIL ur image in rawang project ....This is the way that you provided and explained to our resident...

Previously Mahsing highly mentioned that this project is "secure guarded community"... or you can refer to web URL below under "Overview tab" http://www.mresidence.com.my/ .. This is the evident.....

For me... This statement "secure guarded community" is very funny if the guard house as what we saw in photo... i believe the lousy developer / even condo.. the guard house are even good/secure than Mahsing ...

mad.gif mad.gif mad.gif mad.gif mad.gif


Added on August 31, 2012, 11:08 am
QUOTE(Jigjig @ Aug 31 2012, 10:58 AM)
Usually in any housing project, a standard soil treatment for termites will be inclusive during the construction period. After that "Cheak ka ki" if you want for further treatment.
I did check this with other friend who bought project in Twinplam Semi-D  SG Long & Setia Alam Semi -D ... all same.

Please reserved RM 2k for the "Cheak Ka Ki " price.
*
Jigjig, can you further explain what is "Cheak Ka Ki"??? e.g:- give an example. However, Let say not all residence are agree to bear this cost then how?
Just share your opinion and experience on this.. Thanks in advance.

This post has been edited by kelvin2080: Aug 31 2012, 11:12 AM
kelvin2080
post Aug 31 2012, 12:11 PM

Casual
***
Junior Member
358 posts

Joined: Jul 2011
QUOTE(Jigjig @ Aug 31 2012, 11:28 AM)
"cheak Ka ki "= At your owned cost.

Most of the housing project did not list Termite Treatment  as part of the deliverable  in S&P.  This is  up to developer to comply to the internal  QA during the constructions period.

I had experienced treated my house soil one more time (after VP) before renovation but still get attacked  9 mths later. Usually the soil treatment will last at least one year or more. Some even say 3 yrs.

For your info,  ex-rubber and  palm plantation would be the best habitat for termites. Unfortunately MR is sitting on the ex-palm estate land.
*
Thanks for info.. oooo.. I hate termites....... if got termites, No warranty from Mahsing? Can someone clarify?

This post has been edited by kelvin2080: Aug 31 2012, 12:14 PM
kelvin2080
post Sep 1 2012, 12:09 PM

Casual
***
Junior Member
358 posts

Joined: Jul 2011
QUOTE(koigh @ Sep 1 2012, 10:10 AM)
which leaflet you refer to?
Very disappointed with the guard house  mad.gif  mad.gif  mad.gif  mad.gif  mad.gif  mad.gif  mad.gif  mad.gif  mad.gif


Added on September 1, 2012, 10:26 am

I will be there today evening, around 4pm....
We must do something, cannot let MS take advantage on us..... flex.gif
*
I hope i will be there ... unfortunately i'm oversea now.. Please keep me updated info.. i will gather the information and complaint/share it in Mahsing facebook / mahsing email..


kelvin2080
post Sep 1 2012, 04:03 PM

Casual
***
Junior Member
358 posts

Joined: Jul 2011
QUOTE(iLoveSunday @ Sep 1 2012, 03:44 PM)
quite pissed with their sales persons there, they never study the details bout their products. i saw the ventilation in the toilet under staircase, asked them is that included when we get our house, they said not included. i challenged them, coz by rule toilet must have window and good ventilation, else the design is not right! then only they get someone who really know the details to talk to me. i feel like these sales persons know shit bout their product, all they know is just selling the house! same when they promise the g and g thing, in fact, individual title can only have fence and guard.

the id showroom for.phase 2 is not ready yet, didnt get a chance to see the designer works. but phase 3 id showroom is ready, and now i feel phase 3 is more worthy to buy.

in short, the house is not as big as what we think. and their workmanship sucks! u'll know when u see it. :-(


Added on September 1, 2012, 3:45 pmanother photo grid..
*
Why phase 2 show unit is not ready? I thought the project previously are saying that only phase 2 got show unit..
Suddenly Mahsing change their mid set and setup phase 3 show unit there..

In my personal Opinion, Mahsing want to push their phase 3 show unit (many unit are still empty there.. even thought u saw some of the unit sticker are put as not available or someone are booking but the reality that is empty!!!! This is the information that i get from someone) ...
FYI , the Phase 3 show unit should not be located there....


However the sales operator there really not professional.... Last time when i bought they also promised got this and there.... same like Mahsing bandar kinrara project.... i regret to believe this developer... and sign the S&P.

Expected like what we saw in photo, 22*80 in this project not as big as what we think? really SUCK!!! Last time even dare to put orange color main entrance door... right????

Designer and the sub-contractor really got problem to do this project... FYI, This sub-contrator is first time to do project in Rawang... maybe that is the reason we get the suck things..however, Mahsing also need to take responsible to monitor on this......

All, do you think that we need to gather all the name / hp/ unit lot number and then send a complaint letter to Mahsing to show our dissatisfaction?
Please advice. I got discuss with my friends which he got encountered the similar issue... they even report to multicasting company such as TV3/ newspaper... after that the developer only take concern on this?

Mahsing want to spoil their image then i believe we can help them....How u think?????


******
For investor -> Please do remember, even you are not stay in this unit you bought in future .. .If the products are lousy did you think you can sell it a good price in future????

For own stay buyers -> Please take into consideration, you put RM 600k++ to bought this unit but in the end you get a lousy product, and live in the unsecure place... is it the one you want???? please ask urself
********


We DUN WANT A CON-PROMISE AND NO PROFESSIONAL SALES OPERATOR IN THIS PROJECT.... BEFORE BUY!!!!! SAID IT GOT, BELIEVE US !!!!!
AFTER BOUGHT!!!!DIFFERENT STORY!!!!!


vmad.gif vmad.gif vmad.gif

This post has been edited by kelvin2080: Sep 1 2012, 06:48 PM
kelvin2080
post Sep 1 2012, 06:43 PM

Casual
***
Junior Member
358 posts

Joined: Jul 2011
QUOTE(iLoveSunday @ Sep 1 2012, 04:52 PM)
u went there too? better go there see it for yourself...
i need 2nd opinions too, dun let my comments affecting what u think first, i might be wrong as it's very subjective to say good or bad...

for me, im not very satisfy with their salesman, and i feel the workmanship of the house is bad too, it's like last minute work to me.. this is my first house and perhaps i expect too much, i dunno....need inputs from u guys too..

agree with the phase 3 show unit as initially they didnt plan to have phase 3 show unit...and they complete and open phase 3 show unit to public moat probably to boost up their phase 3 sales.
*
iLoveSunday, After the viewing, why phase 3 are good than phase 2 show unit? exterior design? or space?
Did you know when we only able to see the phase 2 show unit?

Okay, Others Please comment as well before take any further action..

Below is the gather list, please add if you got any concern....

Complaint/ Dissatisfaction:-
1) Guard House too small and not secure and it's not as what Mahsing promote slogan"secure guarded community"
2) M-residence Sales Operator got attitude problem and not convey the information in professional way.
3) Show house workmanship not good.

Question (Please let us know if you got an answer):-
1) termites attack under warranty?
2) g and g as promised when purchase or f and g? access card? in and out control? security and safety issue.
3) toilet under the staircase, air circulation issue?

Thanks

This post has been edited by kelvin2080: Sep 1 2012, 07:43 PM
kelvin2080
post Sep 2 2012, 11:28 AM

Casual
***
Junior Member
358 posts

Joined: Jul 2011
QUOTE(kittyong @ Sep 2 2012, 12:23 AM)
hi gals all, finally i booked a unit in phase 3 after viewing both actual hse + show hse...

i was lucky cause i can "curi-curi" masuk phase 2's show hse before it locked... drool.gif

feel phase 3 design is more spacious than phase 2 design, i think the main problem in phase 2 is the bathroom design, espcially 1st floor bedroom 2 n bedroom 3...

btw the showhse in phase 2 will reopen after 3 weeks, i can tell u gals the id design really really suck...i dun like~~~ (salesman told me their manager/ceo very dissatisfied the outcome,so what i can see inside the showhse is the sticker "change" "change" "change"... n a alot of sticker there~~~)  doh.gif  doh.gif  doh.gif

regarding the workmanship, i can say ms hv a standard compare with setia alam...i quite satisfied... i went to bkt kemuning, bukit raja & setia alam tis few months, bkt raja is the best workmanship but ms oso hv the quality there, not so poor... biggrin.gif

anyway tis is my 2cent n i am happy here to know all of my neighbour  biggrin.gif  biggrin.gif  biggrin.gif

p/s: the only thing im not so happy is the "cheap" guard hse~~~ hopefully we can do something
*
Kittyong, Thanks for comment. Unfortunately i bought phase 2 ... Last time i got chance to choose phase 2 and phase 3 but the sales operator highly recommend to choose Phase 2... reason as below:

(1) Phase 2 space => 2380 qf and phase 3 space => 2280qf
(2) Phase 2 got balcony
(3) phase 2 upper floor medium room got its own toilet.
(4) Phase 2 got show unit..

* However, the price in phase 2 are much more higher than phase 3..

In the end, Mahsing can deliver OK OK phase 3 but phase 2 disappointed the consumer like us... and phase 2 show unit are delay!!!
Personally i really dissatisfied the way this sub-contractor work!!!! RM 600k++ is not a small amount... i believe everybody have a same feeling here...

Kittyyong, we do saw a photo in phase 2 previously...!!!! really suck and a lot of things are not make sense...and we all are know.. however we hope that Mahsing can do somethings before the show unit are open... we will give them a chance before make an official complaint to mahsing . As what Mahsing promised in newspaper last time... with slogan "They will build a secure guarded community in rawang" ...If in the end, Mahsing deliver this kind of suck product and all consumer are unhappy. Did you think that M-residence 2 and M-residence 1 Semi-D sales can increase?

For this unsecure guard house in photo... i think we can discuss with Mahsing how to get a solution!!! remember, we need solution instead of excuse!!! For term and condition , for sure we can discuss within Mahsing and consumer.... instead of blaming each other!!!!

For consumer, for sure we need a product that as what Mahsing got promised!!! we no need very luxury guard house!!! or material!!! but always remember what we give (RM 600k!!!), Mahsing should give back what it should deliver!!!. Agree?

We wait again the action from Mahsing and show unit phase 2!!!!

others, any comment? Thanks

This post has been edited by kelvin2080: Sep 6 2012, 08:27 PM
kelvin2080
post Sep 2 2012, 11:44 AM

Casual
***
Junior Member
358 posts

Joined: Jul 2011
QUOTE(Nadeje @ Sep 2 2012, 11:41 AM)
just a thought..with Phase 2 and 3 having so much problems with the showhouse.. how about the Phase 1 buyers? they've not seen their units ..and they will never have an opportunity to give feedbacks before letting MS build the entire Phase 1 stretch of houses... hmm..?
*
You are correct!!! But always remember, they will standardized it... If phase 2 and phase 3 is OKay!!! impossible they will built a lousy house in phase 1 to spoil the whole project image, correct?

However, phase 1 and phase 2 design are almost same except phase 2 are more spacious .....


Added on September 2, 2012, 11:47 am
QUOTE(siew1984 @ Sep 2 2012, 12:15 AM)
Wow seem like the id not really that terrible.. at least got some special thing showing..
*
iLovesunday, Can share bigger photo for this ? =)

This post has been edited by kelvin2080: Sep 2 2012, 11:47 AM
kelvin2080
post Sep 2 2012, 09:47 PM

Casual
***
Junior Member
358 posts

Joined: Jul 2011
QUOTE(iLoveSunday @ Sep 2 2012, 09:08 PM)
any idea what we should do next? formal complaint letter? gather every unhappy buyers and nego with them in official meeting?
*
Yes!!! but we still no view the phase 2 show unit? should we give a chance to mahsing before send formal complaint letter? Kittyong said Mahsing Manager/ CEO already taken an initiative to change the design in phase2.. however i dun know whether he just change on this show unit only or all phase 2 house there?.... i think we need a clarification as well =(

* It's good suggestion to have an official meeting within Mahsing and consumer.... Meanwhile, i believe Multicasting company are very interested to know why consumer are so angry about the delivered product !!! We dun want Mahsing drying .. but Mahsing, please do somethings and make sure it's fair to every buyers here!!!!

However, please put urs dissatisfied comment here.. we need it .....


Added on September 2, 2012, 10:02 pm
QUOTE(iLoveSunday @ Sep 2 2012, 01:40 PM)
sure smile.gif
but that flexi ladder cost rm10k ya.
*
Thanks for sharing

This post has been edited by kelvin2080: Sep 2 2012, 10:10 PM
kelvin2080
post Sep 3 2012, 09:49 AM

Casual
***
Junior Member
358 posts

Joined: Jul 2011
QUOTE(iLoveSunday @ Sep 3 2012, 09:42 AM)
hmm.gif all the developer sucks but does it means we need to compromise?
so if all the developer made empty promises, I think we still need to raise our concerns to them and whether they take actions or not, it depends on how "sucks" they are....

hmm.gif The show units suppose to be a sample house, a sample that in best quality and nice nice interior design to attract buyers and build confidence right? I tot it suppose to show their capability and convince ppl to buy by giving potential buyers the best feeling about their product.... hmm.gif
*
All, i received some comment/ email/ message from those who bought the house in phase 2 (In my hand got more than 5 unit owner in phase 2 are not satisfied)... They suggest to send a formal complaint letter to Mahsing!!! However, i'm planning to do that...

Buyers, Please raise your concern on here


Complaint/ Dissatisfaction:-
1) Guard House too small and not secure and it's not as what Mahsing promote slogan"secure guarded community"
2) M-residence Sales Operator got attitude problem and not convey the information in professional way.
3) Show house workmanship not good.

Question (Please let us know if you got an answer):-
1) termites attack under warranty?
2) g and g as promised when purchase or f and g? access card? in and out control? security and safety issue.
3) toilet under the staircase, air circulation issue?

Phase 2 show unit only ready on 3rd week of september? can someone clarify?

This post has been edited by kelvin2080: Sep 3 2012, 09:52 AM
kelvin2080
post Sep 3 2012, 11:36 AM

Casual
***
Junior Member
358 posts

Joined: Jul 2011
QUOTE(choong20 @ Sep 3 2012, 11:24 AM)
hi, i am new here. has been followup this forum for quite some time. bought a phase 2 unit. this is my first house so not really sure what to expect. but i do think that the ground floor toilet is somewhere not in proper location without proper or no ventilation at all (i think thats why they change the design for phase 3??).
agree on any action to protect buyers interest from taiko and taiche here!!
*
Appreciate the comment...


Complaint/ Dissatisfaction:-
1) Guard House too small and not secure and it's not as what Mahsing promote slogan"secure guarded community"
2) M-residence Sales Operator got attitude problem and not convey the information in professional way.
3) Show house workmanship not good.
4) Phase 2 Ground floor toilet is somewhere not in proper location and no ventilation.
5) Phase 2 unit window material used are no up to standard/ no quality.


Question (Please let us know if you got an answer):-
1) termites attack under warranty?
2) g and g as promised when purchase or f and g? access card? in and out control? security and safety issue.
3) toilet under the staircase, air circulation issue?

Others, please comment......
kelvin2080
post Sep 3 2012, 12:27 PM

Casual
***
Junior Member
358 posts

Joined: Jul 2011
All,
I think we should give an official complaint letter to Mahsing. At least can make them aware / concern on this..

Can please PM me your information as below ASAP:-
Your Name :
Unit number that you bought :
Which phase: phase 1, 2 or 3?

Please send me your email as well so that i can cc the letter to you all......


* Remember, Cooperation only will help on this matter... if you think it's no necessary then it's Ok....

Thanks.

This post has been edited by kelvin2080: Sep 6 2012, 08:25 PM
kelvin2080
post Sep 3 2012, 01:54 PM

Casual
***
Junior Member
358 posts

Joined: Jul 2011
QUOTE(koigh @ Sep 3 2012, 01:40 PM)
Design is very subjective....for me i like phase 2 more compare with phase 3.....there is something unique toilet under the staircase.yesterday went to show house n 100% confirmed got ventilation for the toilet.
The interior look narrow not like what i expect.

But i agreed with you all on guard house, small n look not efficient.
*
Thanks for comment..
Phase 2 and phase 3 interior design not same? I thought just upper floor toilet are different??any other are different? Can someone please clarify?

This post has been edited by kelvin2080: Sep 3 2012, 01:54 PM
kelvin2080
post Sep 3 2012, 03:02 PM

Casual
***
Junior Member
358 posts

Joined: Jul 2011
QUOTE(wsfun79 @ Sep 3 2012, 02:43 PM)
hi, i am new here & i am also phase 2 buyer.
I am a phase 2 buyer and shared the same feeling as kelvin2080... feeling that phase 2 is not worth the price tag after viewing the show unit.
*
Okay, well, please give your comment which one you are dissatisfied on phase 2? so that we can gather the info and let mahsing know ....

Complaint/ Dissatisfaction:-
1) Guard House too small and not secure and it's not as what Mahsing promote slogan"secure guarded community"
2) M-residence Sales Operator got attitude problem and not convey the information in professional way.
3) Show house workmanship not good.
4) Phase 2 Ground floor toilet is somewhere not in proper location and no ventilation.
5) Phase 2 unit window material used are no up to standard/ no quality.


Question (Please let us know if you got an answer):-
1) termites attack under warranty?
2) g and g as promised when purchase or f and g? access card? in and out control? security and safety issue.
3) toilet under the staircase, air circulation issue?


Added on September 3, 2012, 3:05 pm
QUOTE(kelvin2080 @ Sep 3 2012, 12:27 PM)
All,
I think we should give an official complaint letter to Mahsing. At least can make them aware / concern on this..

Can please PM me your information as below ASAP:-
Your Name :
Unit number that you bought :
Which phase:  phase 1, 2 or 3?

Please send  me your email as well so that i can cc the letter to you all......
* Remember, Cooperation only will help on this matter... if you think it's no necessary then it's Ok....

Thanks.
*
Please take note on this if you think it's necessary!!!

This post has been edited by kelvin2080: Sep 6 2012, 08:25 PM
kelvin2080
post Sep 3 2012, 04:49 PM

Casual
***
Junior Member
358 posts

Joined: Jul 2011
QUOTE(SNathan @ Sep 3 2012, 04:38 PM)
should I list my details here in the forum? Phase 1 22X80 buyer.
*
please send me pm... in case your information are in confidential....
kelvin2080
post Sep 3 2012, 06:33 PM

Casual
***
Junior Member
358 posts

Joined: Jul 2011
QUOTE(Jojo @ Sep 3 2012, 05:55 PM)
Hi,

Saw the photo of air ventilation for in the toilet. The question is:

1. Where the air to be flow to?

By logic. Maybe everyone here not aware about this. The toilet air cannot be flow out of your house. It still flow within the toilet ceiling and the smell still inside toilet.

This design is unacceptable even you had install air ventilation unit.
*
jojo. you got good point and i think it's no make sense to have toilet there.... smile.gif
Design got problem!!!


This post has been edited by kelvin2080: Sep 3 2012, 06:34 PM
kelvin2080
post Sep 4 2012, 08:48 AM

Casual
***
Junior Member
358 posts

Joined: Jul 2011
QUOTE(kelvin2080 @ Sep 3 2012, 12:27 PM)
All,
I think we should give an official complaint letter to Mahsing. At least can make them aware / concern on this..

Can please PM me your information as below ASAP:-
Your Name :
Unit number that you bought :
Which phase:  phase 1, 2 or 3?

Please send  me your email as well so that i can cc the letter to you all......
* Remember, Cooperation only will help on this matter... if you think it's no necessary then it's Ok....

Thanks.
*
All, Only cooperation will help on this matter... Thanks.

This post has been edited by kelvin2080: Sep 6 2012, 08:24 PM
kelvin2080
post Sep 4 2012, 11:10 AM

Casual
***
Junior Member
358 posts

Joined: Jul 2011
All, i already prepared the complaint letter.. Please voice out what is your dissatisfaction. Thanks in advance.
kelvin2080
post Sep 4 2012, 11:14 AM

Casual
***
Junior Member
358 posts

Joined: Jul 2011
QUOTE(SNathan @ Sep 4 2012, 11:12 AM)
what is "PM"
*
PM - Personal message

please refer the photo in attachment.


Added on September 4, 2012, 11:16 am
QUOTE(koigh @ Sep 4 2012, 10:37 AM)
Who agree if the main door paint with wood shellack color instead of dark brown?
I feel wood shellac color is more luxury and elegant.....
*
Koigh, please PM me your personal email .. so that we can share the complaint letter.

This post has been edited by kelvin2080: Sep 4 2012, 11:16 AM


Attached thumbnail(s)
Attached Image
kelvin2080
post Sep 4 2012, 12:37 PM

Casual
***
Junior Member
358 posts

Joined: Jul 2011
QUOTE(kelvin2080 @ Sep 4 2012, 08:48 AM)
All, Only cooperation will help on this matter... Thanks.
*
Really Thanks for those owner are sharing the information. others, please joining us... please do remember cooperation only help on this matter... wait and see will not help...


kelvin2080
post Sep 4 2012, 02:55 PM

Casual
***
Junior Member
358 posts

Joined: Jul 2011
QUOTE(koigh @ Sep 4 2012, 01:54 PM)
Kelvin, I will PM my personal to you later, I'm phase 2 buyer.

Anyway I do agree will all your complaints here except for ground floor toilet location and 1st floor individual toilet which I like it  blush.gif

The rest like main door color, finishing quality/workmanship, material, guard house, window frame material, toilet sink, toilet/room door, staircase railing etc are very disappointed, not worth it for RM600K+ house  mad.gif  mad.gif  mad.gif  mad.gif  mad.gif  mad.gif
*
Thanks in advance... We need a clarification from Mahsing.. so buyers, please do cooperation on this matter...


13 Pages « < 6 7 8 9 10 > » Top
 

Change to:
| Lo-Fi Version
0.0541sec    0.43    7 queries    GZIP Disabled
Time is now: 8th December 2025 - 12:35 PM