Overall, Liu Li garden (semi-Ds) has starting the structural frame works.
Club house - ground floor framing ongoing.
SD-001 - SD006 - ongoing with some framing works putting up.
I think by Xmas time should be able to see the frame works completed with M&E installed.
Bro XYYAP - Liu Li garden - piling works still ongoing.
Note - the future road between MCT lakefront and SEG also completed (except the flyover).