QUOTE(Pezu @ Jul 13 2013, 12:31 PM)
no such clause mentioning 60 days period. My specific case is strictly for first dirbursement from bank for the purchase of "advanced" completed property. I purchased a 55% completed property, thus the billing is issued immediately after i booked.  From the date of booking date to billing due date, it s 51 days, definitely it s not sufficient for me, lawyer, the bank bank to finalize loan documentation. This is totally ridiculous.

The 60 day period from booking date was mentioned by the acc staff when went to their office questioning the sudden issuing of billing.
*
Thanks Peju.

A lot of controversy cud have been avoided if Nadayu had made the 60 day rule for advanced completion project very clear at time of booking so that buyers have a choice to accept these terms i.e. accept the high likelihood of paying some 'late payment' interest vs saving interest by buying an advanced completed property or, if they dint like the terms, just walk away. Obviously Nadayu would not want you to walk away hence not so transparent (I'm guessing)...
jit13
post Jul 15 2013, 03:21 PM

Getting Started
**
Junior Member
117 posts

Joined: May 2013
QUOTE(kkteng @ Jul 15 2013, 01:44 PM)
make it this way, the problem finishing are with current phase of key release.
i would called it phase2a/3 for the under construction semi-D/Bangalow/3sty-link, where expected finished end of 2014.

My concern now is can I take their words now, i starting losing confident now, as I'm giving all my saving for this "home".. sad.gif
*
Dont worry bro, I am Type I with u. You got a good price. Lets support the earlier phases in rectifying defects. Most defects can be rectified satusfactorily. Its more the emotional response of seeing defects naturally overwhelms us. I also think possibly specific problem with contractor since earlier phases not much defects reported Like Type E and B as reported in this forum.
Lets be proactive and work it out. Thx

jit13
post Jul 22 2013, 08:26 PM

Getting Started
**
Junior Member
117 posts

Joined: May 2013
Folks

I will be signing my SPA for Type I soon, and need to prepare my funds for the progress billing which will be issued soon after signing. Can someone please confirm that the SPA adopts the standard HDA Act 1966 "Schedule H" where, under the Third Schedule, payment is due within 21 working days of receipt of the Vendor's written notice of completion of each stage?

Mucho gracias!
jit13
post Jul 22 2013, 10:02 PM

Getting Started
**
Junior Member
117 posts

Joined: May 2013
QUOTE(kkteng @ Jul 22 2013, 09:44 PM)
Hi Jit13,

You can contact Wendy or the lawyer, ask them to send you the softcopy of snp, and take your time to read it,  have fun....
Anyway, as I remember, it's schedule H, but didn't recall about the 21 days stuff.

Also type-I still yet to release the first billing, is it still require to pay the first progress billing ?

p/s : I've signed mine last Saturday...
*
Thanks, and many congrats on your decision to purchase... rclxms.gif

If it is Schedule H, then should be 21 working days. Can refer here - http://www.kpkt.gov.my/kpkt/borang/lesen/Schedule_H.pdf

I think if yours still not completed piling - stage 2(a), no billing yet. Saving you some interest, since we all handover same time...

Mine already completed 2(a), and 2(b) will be completed or almost near completed by the time my SPA signed, so I have to expect 25% billing claim soon! ohmy.gif
jit13
post Jul 22 2013, 10:42 PM

Getting Started
**
Junior Member
117 posts

Joined: May 2013
QUOTE(kkteng @ Jul 22 2013, 10:22 PM)
I'm not sure where is the current status, but Zila mentioned there is none of the type-I billing issued till last Sat....could it be that the construction already completed for 2a/b, but dev office still not start the billing? can you confirm with Wendy or head office on this, i only have the words from lawyer firm only so far.
*
That's funny. Wendy informed me a month ago that 2(a) completed for my unit, which confirmed what I had seen when I visited the construction site 2 months ago - piling completed with pillars and some floor beams up to 1st floor. Your unit started construction later.

Based on what Zila said, probably means that the architect has yet to issue any cert for Type I units, but will be doing it in batches. Unless any other purchaser of Type I has received billings? I guess the developer will not delay the billing if cert issued. lol.


jit13
post Jul 23 2013, 12:37 PM

Getting Started
**
Junior Member
117 posts

Joined: May 2013
QUOTE(cheon @ Jul 23 2013, 11:59 AM)
Nice photo, bro! rclxms.gif

I feeling the same too. It's a nice design!
However, i will make some renovation on 2nd and 3rd floor.

Here's my plan, i will 'tampal' the big hole on the second floor which make the second floor a lot bigger.

Our master bedroom is quite small too. Thus, i plan to convert half of the living room on the 3rd floor becoming a big 'walk in wardrobe'

I have the quotation already with a good interior design contractor. The contractor will settle everything for me including renovation, wardrobe, kitchen cabinet etc...  rclxms.gif  rclxms.gif

I survey more than 10 companies and this is the best price & service i could get. biggrin.gif

It's a all in one contractor, do let me know if anyone need the telephone number for the contractor.
*
Bro, is the ID guy known to you? previous work done?

Anyway, can we view your nice unit after your big reno? smile.gif
jit13
post Jul 23 2013, 01:19 PM

Getting Started
**
Junior Member
117 posts

Joined: May 2013
QUOTE(cheon @ Jul 23 2013, 01:11 PM)
PM already. The contractor said can give some free gift or discount if we doing together tongue.gif  tongue.gif
*
Can do 3D and advertise in mags - must be a professional ID guy, huh? If he include semidee side owners for discount, will definitely consider end 2014. biggrin.gif
jit13
post Jul 23 2013, 04:05 PM

Getting Started
**
Junior Member
117 posts

Joined: May 2013
QUOTE(cheon @ Jul 23 2013, 02:42 PM)
Done. Pls check~
*
Is it against the forum rules to post your ID guy details just once here, instead of so many PMs?? lol
jit13
post Jul 23 2013, 07:03 PM

Getting Started
**
Junior Member
117 posts

Joined: May 2013
QUOTE(AMINT @ Jul 23 2013, 09:44 AM)
Sharing some photo of type A.

user posted image

Uploaded with ImageShack.us

user posted image

Uploaded with ImageShack.us

user posted image

Uploaded with ImageShack.us
Initially I thought type A was a little bit weird but when i see finish product, the concept is actually not bad. Can you guys share your photos for different types?
*
Reminded me of a movie I saw yesterday - " Sleuth", starring Michael Caine and Jude Law. The house in the movie has a small and beautiful passenger glass lift from GF to 1F.

Possible to do that here - void and courtyard are suitable places, can even go to 2F for some Types. Not cheap of course, but not that expensive for basic models.

Just throwing out an idea if have old folks staying. It is very useful then...Will it be allowed? tongue.gif
jit13
post Jul 23 2013, 08:14 PM

Getting Started
**
Junior Member
117 posts

Joined: May 2013
QUOTE(wongtk @ Jul 23 2013, 07:53 PM)
you mean the slope land is from the last corner unit of the type I that still available? I actually didn't know as I haven't go to the construction to survey the land itself  blush.gif
*
Bro

Don't sweat, your unit is on last row, no extra land at the back la smile.gif

It's the ones opposite the semidee (facing east) that have extra land at the back.
jit13
post Jul 24 2013, 03:19 PM

Getting Started
**
Junior Member
117 posts

Joined: May 2013
QUOTE(kkteng @ Jul 24 2013, 12:30 PM)
Damn, mine is intermediate unit got land behind......but I remember when Wendy showed me the plan view from architect, there is actually a small jogging/walking track next to the fence/gate behind.
*
To ease your concerns, when I was contemplating purchasing a lot like yours, Wendy informed me that because N92 land e.g. Type I facing semidee where your lot is located, is (about 10 feet?) higher than road level yes, there is a slope right now at the common land behind your lot. Nadayu will be filling up the entire slope in the common land so that all the common land/jogging track will be fully level with your lot, and they will build a retaining wall to replace the temporary metal advertising wall currently in position. You are not paying for a slopy backyard. So steady and have some faith in Nadayu Bro, no need to swear biggrin.gif .

jit13
post Jul 24 2013, 03:39 PM

Getting Started
**
Junior Member
117 posts

Joined: May 2013
QUOTE(AMINT @ Jul 24 2013, 03:21 PM)
Really aa bro? If so those 3 storeys superlink and corner bungalow arent bad la. How come the retaining low are so low now?
*
I have some pics of the metal wall, it looks like temporary only. Is there any concrete wall? Anyway Wendy said these are temporary...

If you are thinking of buying some more houses here (u must be so loaded my friend laugh.gif ), can get more details from the Lady
jit13
post Jul 24 2013, 03:50 PM

Getting Started
**
Junior Member
117 posts

Joined: May 2013
QUOTE(AMINT @ Jul 24 2013, 03:42 PM)
ooo really? cilakak. i thought got slope. thats why i didnt go for bungalow. jialat.  cry.gif bought semi d oredi
*
sorry, my bad.. it is a concrete wall with advertising stuck on it. It is bengkang bengkok and looks too flimsy to be permanent wall. I guess Nadayu will replace this wall with a more solid and higher concrete wall.

Cheers!


Attached thumbnail(s)
Attached Image
jit13
post Jul 24 2013, 03:53 PM

Getting Started
**
Junior Member
117 posts

Joined: May 2013
QUOTE(jit13 @ Jul 24 2013, 03:50 PM)
sorry, my bad.. it is a concrete wall with advertising stuck on it. It is bengkang bengkok and looks too flimsy to be permanent wall. I guess Nadayu will replace this wall with a more solid and higher concrete wall.

Cheers!
*
some parts are just metal wall


Attached thumbnail(s)
Attached Image
jit13
post Jul 24 2013, 04:10 PM

Getting Started
**
Junior Member
117 posts

Joined: May 2013
QUOTE(AMINT @ Jul 24 2013, 04:02 PM)
how to really know whether they will build a higher and more solid concrete wall? doesnt look like they will. but i do hope they will.
*
I dunno either. Just sharing what Wendy told me. Anyway, if we look at their website, as KKTeng said, there is a road/path behind these Type I houses. I doubt they can do this if the land is sloping. KKTeng or other buyer on this row, u may wanna clarify further with Wendy, and post it here?
jit13
post Jul 25 2013, 04:57 PM

Getting Started
**
Junior Member
117 posts

Joined: May 2013
QUOTE(ORIZ @ Jul 25 2013, 04:42 PM)
I have seen that lady. she is always at the guard house. I don't see anything wrong with her. FYI it is not the duty of the guards to "Defend" the grounds. they are just assigned to patrol the place and ensure everything is in order. if there is anything wrong it is their duty to inform the police. we usually assume the other way round right.
*
equal opportunities, as long as she is fit for the job. even banks do employ some female security guards.
jit13
post Jul 25 2013, 07:19 PM

Getting Started
**
Junior Member
117 posts

Joined: May 2013
QUOTE(optimus28 @ Jul 25 2013, 07:12 PM)
Aiyoo don't take the suggestion like that la, I have nothing against her because she is a woman. I am all for equal opportunity and all that. I'm more worried for that lady's safety.

Security guards are the first line of defence of the place. They are supposed to be physical fit enough to ward of criminals and then call the police. I'm not saying they should attack the criminals, but they need to defend the place, the residents and themselves against the criminals.

If you realise there are robbers in your house, would you prefer to call the security guards who are 2 minutes away or call the police who might take 20 minutes (maybe even longer) to get there? If the security guards are not capable of dealing with the robbers, they will not come for your help, they will wait for the police to arrive and then only proceed to your house. This happened at a friend's condo in brickfields. The resident was badly hurt and the robbers had already fled by the time the police and security guards got there. The security company was immediately terminated after that. Honestly, I don't want to wait for something to happen before taking action.

I've seen security guards patrolling housing areas with batons and guard dogs. They are ready to defend the place if required. I truly believe this should be the standard of our security guards.
*
Bro, how do you know she doesn't have a black belt and can kick some badass? biggrin.gif biggrin.gif

I mean, presumably she wouldn't have chosen this kind of job and be employed by the security company if she doesn't have the attributes and relevant experience before.


jit13
post Jul 25 2013, 07:51 PM

Getting Started
**
Junior Member
117 posts

Joined: May 2013
QUOTE(optimus28 @ Jul 25 2013, 07:26 PM)
Haha...yes yes I really hope she is a karate expert for both of our sakes :-)
*
go chat with her, find out more tongue.gif


jit13
post Jul 25 2013, 07:53 PM

Getting Started
**
Junior Member
117 posts

Joined: May 2013
QUOTE(jit13 @ Jul 25 2013, 07:51 PM)
go chat with her, find out more  tongue.gif
*
but seriously, don't mind having gurkha guards.. they will cost more though
jit13
post Jul 26 2013, 02:43 PM

Getting Started
**
Junior Member
117 posts

Joined: May 2013
QUOTE(ORIZ @ Jul 26 2013, 02:25 PM)
Just got back from n92. Rained like hell. noticed that almost the whole driveway gets wet and thr is a weird water outlet from the second floor that lets the water flow down, like a tap, close to the main door. Spalshes everywhere.

Worst thing when i drove down to reko, the u turn area was flooded like hell to the extent tat a car broke down in it. Luckily i managed to pass wo any probs. The whole area on reko seems to be flood prone  la. HORRIBLE
*
Why no gutter pipe? Something not right there...

6 Pages « < 2 3 4 5 6 >Top
Topic ClosedOptions
 

Change to:
| Lo-Fi Version
0.0338sec    0.34    7 queries    GZIP Disabled
Time is now: 23rd December 2025 - 07:27 AM