QUOTE(feizaiII @ Mar 7 2012, 10:39 AM)
see see.. different people give me different sequence... my contractor said after wall and floor thn only build table... by the time thy build table, my tiles will dirty lorrrrr...?
because my table top is using tiles, so my sequence is:
a) build table top with all the sinks installed....(because my sinks are under-mount)
b) open holes for the taps on the table...
c) do mozek tiles on walls for dry kitchen
d) do wall tiles for wet kitchen
e) do tiles for table top...
f) do floor tiles..
g) install taps, hood and hob
h) install kitchen cabinet and island