QUOTE(YoungMan @ Oct 8 2020, 12:29 PM)
It's not the green man fault if the BTU cannot support more than 100mbps. The Modem is provided by TM and TM have to change it to a newer one. Maybe since you are porting out TM do not bother to change so that you will complain slow speed after signing with new provider.
QUOTE(Candy12 @ Oct 8 2020, 01:33 PM)
The modem is provisioned and supplied by TM since you're on TM HSBB infra. The reason why it only supports 100M is because your current fibre modem is already obsolete.
But I'm wondering why the TM side needs 2 weeks to swap a fibre modem(ONT)??
Why would they need so many days when everything is already setup at your place.
Yes i know TM provide the modem to team green. But i still blame team green becos I already remind them regarding my modem (never change from 2011)..But I'm wondering why the TM side needs 2 weeks to swap a fibre modem(ONT)??
Why would they need so many days when everything is already setup at your place.
and always the reply is "yes, your current hardware can support up to 800Mbps, we already check bla bla.. dont worry"
If my modem need to be replaced, they must have the new modem available before confirmed installation date with me. wasting my time. The duration between the day I submitted the registration form + walk in to TM point + cooling period to my installation date is weeks. they should have enough time to prepare.
checked online, many people also kena like this. imagine if you apply for annual leave but suddenly thing like this happen.
This post has been edited by Sabenarian: Oct 8 2020, 02:54 PM
Oct 8 2020, 02:42 PM

Quote
0.0456sec
0.83
6 queries
GZIP Disabled