Hi!
Not much to share as the progress came to a grinding halt due to problem with my cabinet contractor. Apparently the salesperson left the company so I’m assigned to a new lady that needs to check the design/order again to make sure everything is alright. So it’s a delay from 19th to 30th. There goes my plan to move in early! I’m wondering whether I could claim compensation.
On another note, I signed up with one cabinet company at expo and paid RM1k deposit to lock in prices. I initially plan to get them to do all my wardrobe n shoe cabinet. But they have now quoted me a higher price than what was calculated at the expo. So yeah, beware of this kind of problem also if sign up at expo. Now I just want to either claim back the deposit, or just get them to do one cabinet at cost of RM1k to set off my deposit.
I have finalized the plaster ceiling and lightings. I’m total I installed:
28 eyeballs (living, dining, kitchen, bedroom and family area)
48 downlight (all area including toilet)
9 tracklights
T5 for Lbox and few curtain pelmets
2 chandelier for stair area and dining
3 pendant lights for island counter
8 plug points
10 fans
Plaster ceiling the whole of ground floor and some areas of upstairs (the renovated areas)
The total charge of around rm14k inclusive of repainting.
Sharing some pictures of the final look.
Attached thumbnail(s)