QUOTE(CTD1986 @ Jul 13 2020, 02:39 PM)
Hi, may I know anyone have full article for this "PTTEP progresses giant Malaysia gas field project" from upstream? Any news for this Lang Lebah project?
Technip worked on prefeed Lang Lebah.Oil & Gas Careers V12 - Upstream & Downstream, Market still slump, slow, snail pace...
|
|
Jul 13 2020, 10:29 PM
Return to original view | Post
#461
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
4,864 posts Joined: Nov 2008 |
|
|
|
|
|
|
Jul 23 2020, 12:43 AM
Return to original view | Post
#462
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
4,864 posts Joined: Nov 2008 |
QUOTE(BS8110 @ Jul 22 2020, 11:32 AM) Offshore duration can be between 14, 28, 45 or 60 days nowadays. Depending on company policy. I admired those who could stay offshore on a long duration time.Long ago, where got all these maximum offshore days. You are good mentally + physically, all certs valid and give consent, continue on. Maximum I had been was 120 days straight, no U turn or anything about that. The longest time I spent on an offshore platform was 3 days 2 nights, when we had to carry out surveys on the platform for brown field engineering works. I felt like it was the longest time in my life. I never thought I would feel so joyous and delightful when I heard the chopper approaching the platform to pick up desperadoes ppl like me who missed main land so much! |
|
|
Jul 30 2020, 11:25 PM
Return to original view | Post
#463
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
4,864 posts Joined: Nov 2008 |
|
|
|
Aug 6 2020, 09:23 PM
Return to original view | Post
#464
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
4,864 posts Joined: Nov 2008 |
QUOTE(ZZMsia @ Aug 6 2020, 10:58 AM) It sailed on Monday and heard will arrive smlm or today. Jerun CPP EPC award delayed end of the year.Project was awarded roughly 3 years ago in May. Next CPP at the yard now is Kasawari. .. . Let's see how jerun goes. Next CPP is Lang Lebah. That's one big field development. |
|
|
Aug 11 2020, 07:53 PM
Return to original view | Post
#465
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
4,864 posts Joined: Nov 2008 |
|
|
|
Aug 14 2020, 02:04 PM
Return to original view | IPv6 | Post
#466
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
4,864 posts Joined: Nov 2008 |
|
|
|
|
|
|
Aug 18 2020, 10:39 PM
Return to original view | Post
#467
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
4,864 posts Joined: Nov 2008 |
QUOTE(ZZMsia @ Aug 17 2020, 10:35 PM) https://www.offshore-mag.com/field-developm...offshore-brazil20 months engineering! AKER MGMT must be relieved! All staff can work on the project and no one will be laid off! This post has been edited by Stamp: Aug 19 2020, 08:06 AM |
|
|
Aug 20 2020, 10:13 PM
Return to original view | Post
#468
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
4,864 posts Joined: Nov 2008 |
|
|
|
Aug 21 2020, 12:40 AM
Return to original view | Post
#469
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
4,864 posts Joined: Nov 2008 |
|
|
|
Aug 21 2020, 05:58 PM
Return to original view | Post
#470
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
4,864 posts Joined: Nov 2008 |
QUOTE(NewBodOnTheBlock @ Aug 21 2020, 04:09 PM) Chinese yards most likely for Mero 3 although maybe topsides and hull work at different contractors. Upstream reported that Sembcorp Marine was also interested but no Korean companies in the frame The partnership might have changed. Sembcorp was "equal" partner with MISC initially, but my guess is that MISC has opted to be the main contractor-operator of Mero 3. Easier for them to call the shots. This post has been edited by Stamp: Aug 21 2020, 05:59 PM |
|
|
Aug 25 2020, 05:57 PM
Return to original view | Post
#471
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
4,864 posts Joined: Nov 2008 |
|
|
|
Aug 27 2020, 09:53 PM
Return to original view | Post
#472
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
4,864 posts Joined: Nov 2008 |
christ14 and Maverick85 liked this post
|
|
|
Aug 28 2020, 07:00 AM
Return to original view | Post
#473
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
4,864 posts Joined: Nov 2008 |
Not sure the authenticity of this job ad, but what the heck.
MANPOWER REQUIREMENT 2020/2021 LOCATION: MALAYSIA, SINGAPORE/BATAM, BRAZIL AND CHINA DURATION: 5 YEARS ETA START: Q4 2020 If Interested, Please Send Updated CV with Expected Daily Rate (MYR/USD) to admin@enersea.com.my or recruit@enersea.com.my. Write Position Applying In Subject Email. PROJECT MANAGEMENT 1 Project Manager 2 Delivery Manager 3 Engineering Manager 4 Construction Manager (Topside / Marine) 5 Project Controls Manager 6 Commissioning Manager 7 Quality Manager 8 Safety Manager 9 Risk Manager 10 HSE Manager 11 Procurement Manager ENGINEERING 1 Process Package Delivery Lead 2 Mooring Package Delivery Lead 3 Marine & Mechanical Package Delivery Lead 4 Electrical Equipment Package Lead 5 Metering and Instrument Package Lead 6 Interface Designer 7 Engineering DC 8 Process Lead 9 Process Engineers 10 Naval Arc. Lead 11 Naval Arc. 12 Marine Lead 13 Marine Engineers 14 Mechanical Lead 15 Mechanical Engineers 16 Structural Lead 17 Structural Engineers 18 Electrical Lead 19 Electrical Engineers 20 Piping Lead 21 Piping Engineers 22 Instrument Lead 23 Instrument Engineers 24 Designers 25 Technical Safety Lead 26 Corrosion Lead 27 HVAC Lead 28 Telecom Lead 29 Geotech Lead CONSTRUCTION TEAM 1 Site Structural Engineer 2 Site Piping Engineer 3 Site EIT Engineer 4 Site Mechanical Engineer 5 Site Accommodation Engineer 6 topside interface engineer 7 MC Lead 8 Structural Supervisor 9 Piping Supervisor 10 EIT Supervisor 11 Marine / Mechanical Supervisor 12 Accommodation Supervisor 13 MC Technician 14 Data Entry Clerk 15 Discipline Tech-Accomodation 16 Discipline Tech-Mechanical 17 Discipline Tech -Electrical 18 Discipline Tech -Instrument 19 Discipline Tech –Telecom SITE PROJECT TEAM 1 Projects Control Lead 2 Site Procurement Officer 3 Lead Cost Controller 4 Cost Controller 5 Lead Document Controller 6 Document Controller 7 Quantity Surveyor 8 Lead Site Planner 9 FSO Planner 10 Site Secretary SITE QUALITY CONTROL 1 Quality Lead 2 Topsides Quality Lead 3 Quality Document Controller 4 Paint Inspector 5 Piping Inspector 6 Mechanical Inspector 7 Structural Inspector 8 EIT Inspector 9 Ex Inspector 10 EIT Inspector FSO(S) SITE HSE 1 QHSE Engineer 2 Safety Officer SITE COMMISSIONING 1 Pre Comm Manager & Coms Lead 2 Pre Comm & Coms Lead 3 Electrical Lead 4 Mechanical Lead 5 Marine Lead 6 Instrument Lead 7 Piping Lead 8 Telecoms Lead 9 Electrical Technician 10 Piping Technician 11 Mechanical Technician 12 Instrument Technician 13 Telecoms Coms Technician 14 Marine Coms Technician OFFSHORE INSTALLATION 1 Installation Manager 2 OIC Engineer (P) 3 Operations Manager 4 Operations Superintendent 5 Technical Superintendent 6 Operations Engineer 7 Operations Coordinator 8 Asset Integrity Engineer 9 HSE Coordinator 10 Project Coordinator SHIP STAFF 1 Captain 2 Chief Officer 3 Chief Engineer 4 2nd Engineer 5 3rd Engineer 6 4th Engineer SUBCONTRACTORS 1 Subcontracts Manager - Project 2 Lead Subcontracts 3 Sr Subcontracts Engineer 4 Subcontracts Engineer |
|
|
|
|
|
Aug 29 2020, 04:33 PM
Return to original view | Post
#474
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
4,864 posts Joined: Nov 2008 |
QUOTE(Maverick85 @ Aug 29 2020, 04:30 PM) KKB unit bags EPC contract for Kasawari Gas project Wonder that package include flare tripod, BSF and flare bridge?https://www.theborneopost.com/2020/08/26/kk...ri-gas-project/ |
|
|
Sep 4 2020, 10:37 AM
Return to original view | Post
#475
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
4,864 posts Joined: Nov 2008 |
QUOTE(jimbet1337 @ Sep 3 2020, 10:32 PM) What I heard from my friends there, some portion of Mero 2 work in KL office will be handed over to their jv company in India (cheaper rater per head) from October onwards. AKER might be interested in those exSBM staff since they are working on Mero 3 topsides design now.Many contract staff are affected and got no choice but to look elsewhere. Mero 2 started mid 2019 and gonna end sometime in 1st quarter of 2021 |
|
|
Sep 4 2020, 10:38 AM
Return to original view | Post
#476
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
4,864 posts Joined: Nov 2008 |
Mero 4 bid engineering is on-going now.
|
|
|
Sep 6 2020, 08:48 PM
Return to original view | Post
#477
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
4,864 posts Joined: Nov 2008 |
|
|
|
Sep 13 2020, 08:54 AM
Return to original view | Post
#478
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
4,864 posts Joined: Nov 2008 |
QUOTE(Maverick85 @ Sep 11 2020, 09:09 PM) Lang Lebah platform, the next CPP Floatover in Malaysia after Jerun. Big development, both offshore and onshore.This post has been edited by Stamp: Sep 13 2020, 08:55 AM xiaoxiaoshen, Feliciaeve, and 1 other liked this post
|
|
|
Sep 19 2020, 02:17 PM
Return to original view | Post
#479
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
4,864 posts Joined: Nov 2008 |
QUOTE(abgkik @ Sep 19 2020, 10:10 AM) AKER have started work on Topside.. The Hull work will coming soon. MISC is already flooded with expats. . This is the time that Malaysian Managers/Engineers have chance to shine because of MCO (During normal days, they love to hire expat even if they need to pay 5x more than Malaysian 🤔).. |
|
|
Sep 23 2020, 08:26 PM
Return to original view | Post
#480
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
4,864 posts Joined: Nov 2008 |
|
|
Topic ClosedOptions
|
| Change to: | 0.1341sec
0.37
7 queries
GZIP Disabled
Time is now: 13th December 2025 - 12:52 PM |