Outline ·
[ Standard ] ·
Linear+
Oil & Gas Careers V12 - Upstream & Downstream, Market still slump, slow, snail pace...
|
abgkik
|
Jan 26 2021, 03:43 PM
|
|
QUOTE(mohdyakup @ Jan 26 2021, 11:41 AM) I hope to get some small piece of cake from Jerun. "Hope" is a bold word. Lulz. Competition are stiff. All business owner are fighting to get some cake from Jerun. Oh well. Life goes on. Wish you the best brother..
|
|
|
|
|
|
abgkik
|
Feb 8 2021, 03:19 PM
|
|
QUOTE(mohdyakup @ Feb 8 2021, 11:59 AM) MTC has experience in FSO Ledang, Ophir field development last time. That time MTC JV with Bluewater. And also Bukit Tua FSO at Indonesia if not mistaken (citation needed). Itu big boss MTC Hj Fauzi very well experienced liao. Shapoorji Palorji? I reserved my comment lulz ayam sked LOD inkambing. ha ha.. to naive.. Actual 4 bidders for Limbayong are Yinson MISC Bumi Armada+Sapoorji with MTC SIP MTC have well experienced Naval Architects, Marine Engineers, Topside Engineers.. all of them are my colleagues before, and Fauzi was my supervisor. Even when I were managing my previous FSO EPCIC Project, I hired their team. This post has been edited by abgkik: Feb 8 2021, 03:21 PM
|
|
|
|
|
|
abgkik
|
Feb 8 2021, 04:05 PM
|
|
QUOTE(contestchris @ Feb 8 2021, 03:47 PM) Seems odd that there are three entities (Bumi Armada, Shapoorji and MTC) jointly bidding for what is ultimately a small-midsize FPSO. Isn’t that a bit overkill? Also, from what I know MTC was previously prequalified during their joint bid with Shapoorji. Bumi Armada seems to be a new addition to the bid. its nothing odd.. Company A provide track record small to VLCC in EPCC of FPSO Company B provide financial support. Company C provide engineering support & have good record on small FPSO.
|
|
|
|
|
|
abgkik
|
Feb 8 2021, 05:43 PM
|
|
QUOTE(mohdyakup @ Feb 8 2021, 05:17 PM) Abgkik otai floater otai naval arc ayam lespek liao. not otai.. pencacai only  : Abang Yakub otai manpower... This post has been edited by abgkik: Feb 8 2021, 06:54 PM
|
|
|
|
|
|
abgkik
|
Feb 8 2021, 06:53 PM
|
|
QUOTE(ZZMsia @ Feb 8 2021, 05:25 PM) Sorry mind to ask, what current projects does MTC have After deployment of their Hummingbird, seem like they don't have any EPC project. Currently what I can see they are providing engineering arm to FPSO Company such as Sapoorji for India FPSO project, and also job at terminal.
|
|
|
|
|
|
abgkik
|
Feb 9 2021, 09:21 AM
|
|
QUOTE(Stamp @ Feb 8 2021, 11:26 PM) Finally Brent crude crossed the USD60 threshold. It’s USD60.18 now! Hopefully its maintain through out 2021. This post has been edited by abgkik: Feb 9 2021, 09:21 AM
|
|
|
|
|
|
abgkik
|
Feb 9 2021, 10:56 AM
|
|
QUOTE(mohdyakup @ Feb 8 2021, 07:49 PM) MTC won a SPM change out job with Petron Port Dickson last year if not mistaken. I think there is another SPM change out at Brunei Shell Petroleum and Shell Jurong, a lot of contractor eyeing this job. You are correct.. SPM change was done by MTC...
|
|
|
|
|
|
abgkik
|
Feb 15 2021, 09:53 AM
|
|
QUOTE(contestchris @ Feb 13 2021, 02:27 AM) Any idea what is the new Bumi Armada win with ONGC about? I believe you are referring to D1 Field FPSO extension.. also maybe their installation campaign for Block KG – DWN 98/2 soon..
|
|
|
|
|
|
abgkik
|
Feb 15 2021, 09:54 AM
|
|
QUOTE(mohdyakup @ Feb 13 2021, 08:50 PM) Kecik betul daily rate ni huhuhuhuhuhu  sedap ni bang.. lagi time tak banyak kerja kosong ni..
|
|
|
|
|
|
abgkik
|
Feb 15 2021, 11:35 AM
|
|
QUOTE(contestchris @ Feb 15 2021, 11:05 AM) It’s not the D1 extension for sure. Might be for the 98/2 installation campaign. Did they win anything for that recently? Installation of FPSO at 98/2 field is under them.
|
|
|
|
|
|
abgkik
|
Mar 1 2021, 02:26 PM
|
|
QUOTE(contestchris @ Feb 26 2021, 11:03 PM) https://www.upstreamonline.com/finance/bumi...fits/2-1-970672They seem to have done a good job to manage the financial and solvency risk. Looks like worst is over. The ONGC 98/2 fpso is due for first oil either Q4 2021 or Q1 2022. Excited to see what other large projects they can bag. Misc and Yinson both have been awarded 200k+ bopd projects in Brazil. Shame Bumi Armada couldn’t take part due to their financial position then. Previously due to Client company become bankrupt (Nigeria), contract been terminated (Australia) OSV demand is decreasing have cause the gloom. As they have reduce the OPEX, sold the non-performing asset, Bumi Armada is making profit. Salute to Leon.. and Armada Kraken performing well..
|
|
|
|
|
|
abgkik
|
Mar 5 2021, 11:12 AM
|
|
QUOTE(mohdyakup @ Mar 4 2021, 11:16 PM) Ada campur tangan "wahyu" hahahaha This campur tangan so bad ass huh? This post has been edited by abgkik: Mar 5 2021, 11:12 AM
|
|
|
|
|
|
abgkik
|
Mar 24 2021, 09:27 AM
|
|
QUOTE(mohdyakup @ Mar 18 2021, 02:31 PM) Sometimes I tak faham this Client, our locals experienced engineers banyak jobless, nak sangat ambik foreign talents, macam lah foreign talents terrer sangat, our local Malaysian are much more better and capable. Biasalah bang.. even our locals have delivered EPCIC FPSO project successfully, but for hiring manager, it is not good enough..
|
|
|
|
|
|
abgkik
|
Mar 24 2021, 02:11 PM
|
|
Fuhhhh... This is unbelievable.. Barrosa FPSO EPCI was awarded to MODEC on October 2019.. https://www.modec.com/news/2019/20191030.htmlNow.. Barrosa FPSO EPCIC was awarded to BW Offshore https://finance.yahoo.com/news/bw-offshore-...-224300456.htmlthis is real sailang.. This post has been edited by abgkik: Mar 24 2021, 02:16 PM
|
|
|
|
|
|
abgkik
|
Apr 27 2021, 07:12 AM
|
|
QUOTE(galaxy s forever @ Apr 21 2021, 10:43 PM) Anyone know about kavin engineering? What kind of project they doing now especially in KL office. seems similar with SBM They are totally not like SBM. SBM is EPCIC of FPSO, Owner of FPSO and also do O&M for FPSO. Kavin is like Engineering consultant firm. Kavin have approach me before for HAZID/HAZOP. But I can't remember during my time at Bumi Armada or Carigali Hess.
|
|
|
|
|
|
abgkik
|
May 4 2021, 08:38 AM
|
|
|
|
|
|
|
|
abgkik
|
May 7 2021, 08:48 AM
|
|
QUOTE(Rorschach85 @ May 5 2021, 08:49 AM) I can imagine the approving signatories will taichii, saying not the subject matter experts, we rely on vendor expertise bla bla bla...  1st matter will arise.. May I have a soil investigation/sample at leg area before they proceed with the installation of rig?
|
|
|
|
|
|
abgkik
|
May 29 2021, 09:27 AM
|
|
QUOTE(mhyug @ May 24 2021, 04:28 PM) i see thanks. does misc have another office in singapore handling the project? MISC don't have office in Singapore for handling the project..
|
|
|
|
|
|
abgkik
|
Jun 4 2021, 04:12 PM
|
|
QUOTE(contestchris @ Jun 4 2021, 03:33 PM) Looks like Bumi Armada is on a comeback path. Future developments will be focused on marginal fields. Also they’re going in to floating gas as well. I’m just curious, in their partnerships with Shapoorji Pallonji, which company supplies the engineering know how? Which company is technically more competent? Most of the Engineers been moved to Shapoorji Pallonji.. As in term of engineering know-how, both companies are competent, is just that where are they manpower come from.. Bumi Armada with Marginal fields? Any reference?
|
|
|
|
|
|
abgkik
|
Jun 4 2021, 04:13 PM
|
|
QUOTE(amoxacilin @ Jun 4 2021, 11:40 AM) Any news for Vestigo T&I tender? Awarded already? Not yet..
|
|
|
|
|