QUOTE(contestchris @ Feb 25 2022, 06:55 PM)
Any market for Claire though? Saw that it is official, Bumi Armada is seeking a buyer to monetise the asset.
I think Limbayong can use it.. Oil & Gas Careers V12 - Upstream & Downstream, Market still slump, slow, snail pace...
|
|
Feb 28 2022, 06:52 AM
Return to original view | Post
#181
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
2,143 posts Joined: Mar 2011 |
|
|
|
|
|
|
Mar 1 2022, 10:10 AM
Return to original view | Post
#182
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
2,143 posts Joined: Mar 2011 |
QUOTE(ZZMsia @ Feb 22 2022, 01:32 PM) T7 quite genuine.. I have a friend who have been stationed at China for their MOPU Project.. QUOTE(viole @ Mar 1 2022, 08:44 AM) Rotating. Both also got. To be out from OEM environment, its require you to be professional that able to provide engineering details/technical details.. I believe most of the the time, you just conveys the details that OEM provided to you to Client.Now im kinda stuck in this environment. Hard to move around to other. The only thing i can do and did before is to jump across the oem companies. You may start with Package Engineer (Rotating Equipment) for Main Contractor or Client.. This position its quite demanding for EPCC project. To be Package Engineer, you should well verse on Equipment (Engineering & Technical, Commissioning, Ops & etc), Project Plan and Procurement. Wish you all the best. QUOTE(viole @ Mar 1 2022, 09:57 AM) Ok sounds possible. But hardly i see consultant got this kind of role. Normally i see its like core engineering field; mechanical, electrical, etc. But i will try to find around. As i mentioned above, to be a engineering professional such as Rotating Engineer, its require you to able to provide engineering details/technical details and interpreted manufacturer rotating equipment details design.. what is your education background? Most of the rotating engineer come from Mechanical.. but for start, you can be a package engineer (rotating equipment)..Most of my contacts from consultant are from mechanical, electrical or process engineer who do design. This post has been edited by abgkik: Mar 1 2022, 10:16 AM |
|
|
Mar 1 2022, 10:57 AM
Return to original view | Post
#183
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
2,143 posts Joined: Mar 2011 |
QUOTE(viole @ Mar 1 2022, 10:47 AM) I am from electrical background doing i&c and commissioning of the turbine. Yep, most of turbine detailed engineering (blade design, casing design, thermo calculation) are based in headquarters in oversea. Local offices are just for sale and services. Yup.. Package Engineer will not require to go deep on details design/engineering.. on the surface is required, so that is why I advise you to start from there.. I have dealt with package engineer from consultant before. I doubt they know the detailed engineering as well, but more on the surface for the overall process. Since im into my equipment only, i also lack knowledge on plant process. are you in Compressor or Turbine Generator or power gen contractor? ZZMsia liked this post
|
|
|
Mar 1 2022, 02:23 PM
Return to original view | Post
#184
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
2,143 posts Joined: Mar 2011 |
QUOTE(viole @ Mar 1 2022, 11:12 AM) When there is opening for Package Engineer (Rotating) of FPSO/MOPU/CPP, you can try to apply.. most of the time you need take care of Compressor and Gas Turbine Package.. wish you all the best ZZMsia liked this post
|
|
|
Mar 2 2022, 11:55 AM
Return to original view | Post
#185
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
2,143 posts Joined: Mar 2011 |
https://www.businesstoday.com.my/2022/03/01...preceding-year/
Petronas has reversed its 2020 blip with a convincing Profit After Tax of RM48.6 billion for financial 2021, achieved on the back of RM248 billion in revenue. Bonus.. Bonus... Bonus.. |
|
|
Mar 2 2022, 04:14 PM
Return to original view | Post
#186
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
2,143 posts Joined: Mar 2011 |
QUOTE(mhyug @ Mar 2 2022, 03:42 PM) shshinggg time for GE and beras cap muka <insert name> hahaha. been hearing it alot that many many monies is being syphoned off to the hungry machines, end up us contractor cant even revise but had to further reduce.. aya.. contractor penuh harapan notice the crude prices climbing but got dashed in the end of the day "The group has maintained a dividend payout to the government at RM25 billion as guided last year." |
|
|
|
|
|
Mar 8 2022, 09:42 AM
Return to original view | Post
#187
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
2,143 posts Joined: Mar 2011 |
QUOTE(contestchris @ Mar 7 2022, 04:21 PM) 1) MTC once again in the thick of the action, after submitting sole bid for Limbayong FPSO. Should be no issue for Claire.. However, in term of OPEX, the maintenance cost for turret moored FPSO is higher than spread mooring FPSO. 2) "Sources said the proposal by the favoured consortium is to deploy an existing available FPSO which is moored in Indonesia". Is this in reference to Claire? Will Claire be able to be deployed here? Any other potential FPSO's cold/warm stacked in Indonesia presently? |
|
|
Mar 9 2022, 01:12 PM
Return to original view | Post
#188
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
2,143 posts Joined: Mar 2011 |
QUOTE(Stamp @ Mar 8 2022, 03:07 PM) whoever just started producing oil at their field, feel soooo bless.. Especially in Brazil.. Seem like Petrobras made a good investment, put a purchase order during downtime, and production during oil in demand.. But in Malaysia, Limbayxxg FPSO already been rebid few time since 3 years ago.. This post has been edited by abgkik: Mar 9 2022, 02:22 PM |
|
|
Mar 22 2022, 10:19 AM
Return to original view | Post
#189
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
2,143 posts Joined: Mar 2011 |
QUOTE(ZZMsia @ Mar 21 2022, 08:46 AM) However, previous their CEO high annual salary have been questioned. Maverick85, BS8110, and 1 other liked this post
|
|
|
Mar 31 2022, 06:03 PM
Return to original view | Post
#190
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
2,143 posts Joined: Mar 2011 |
YINSON made profit of RM401 million in year 2021..
https://www.bernama.com/en/business/news.php?id=2066930 Bonus.. bonus.. bonus... |
|
|
Apr 9 2022, 04:03 AM
Return to original view | Post
#191
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
2,143 posts Joined: Mar 2011 |
QUOTE(ZZMsia @ Apr 2 2022, 03:04 PM) Do they have any staff in Malaysia? Mostly I see is in Singapore. Yes.. Yinson have staff in Malaysia. However, most of their engineering/project arm located at Singapore.Bumi armada started hiring recently.. anyone has clue for which project? From junior levels to project manager level I believe Bumi Armada is preparing their key engineers for bidding job. Currently there is no project in Bumi Armada hands. QUOTE(UOS @ Apr 7 2022, 09:35 AM) I don't think Bumi Armada will be participated in Limbayong project as their JV (SP-MTCE) have been participated. |
|
|
Apr 13 2022, 12:24 PM
Return to original view | Post
#192
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
2,143 posts Joined: Mar 2011 |
|
|
|
Apr 18 2022, 08:26 PM
Return to original view | IPv6 | Post
#193
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
2,143 posts Joined: Mar 2011 |
QUOTE(ZZMsia @ Apr 17 2022, 12:18 PM) If I'm not mistaken the lifting wire failed during testing cause the tilt.. QUOTE(ZZMsia @ Apr 18 2022, 05:26 PM) S..... offer optional sabbatical leave to their staff. fuhhh. bad news.. Salary 3 months 40 percent of basic salary and next 3 months 20 percent of basic salary. . |
|
|
|
|
|
Apr 23 2022, 06:13 AM
Return to original view | Post
#194
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
2,143 posts Joined: Mar 2011 |
Seem like McDermott is busy in hiring for their FPU project..
As the project required knowledge on NOPSEMA, I believe this should be for Australia Oil and Gas.. |
|
|
Apr 25 2022, 09:38 AM
Return to original view | Post
#195
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
2,143 posts Joined: Mar 2011 |
|
|
|
May 12 2022, 01:49 PM
Return to original view | Post
#196
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
2,143 posts Joined: Mar 2011 |
|
|
|
May 27 2022, 03:56 PM
Return to original view | Post
#197
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
2,143 posts Joined: Mar 2011 |
QUOTE(contestchris @ May 26 2022, 02:28 PM) According to CIMB, three Malaysian companies are bidding for two large FPSO projects in Angola. I don't think MISC is out from the picture as I don't see any problem with Mero3. Mero 3 is progressing.--------- What are the chances of BAB winning either TotalEnergies’ Cameia FPSO project or Eni’s Agogo FPSO project? We believe that the chances are high for the following reasons. According to industry newspaper Upstream, Yinson, MISC and BAB are all bidding for two Angolan projects. In our view, Yinson will only have the capacity to take one of these two large projects due to its internal project management manpower constraints. BAB’s limited balance sheet capacity suggests that it can only accept one project, while MISC is unlikely to be able to participate as it is likely struggling with Petrobras’ FPSO Mero-3 project, in our analysis. In short, we think that Yinson and BAB may each take one prize. TotalEnergies may award the commercial deal for the Cameia FPSO in 2H22F, as with Eni’s Agogo FPSO. Among this 3 bidders, MISC have the best financial support and engineering team ready. Yinson have limited source due to current projects on-ongoing and BAB is just recovered. |
|
|
May 29 2022, 04:31 AM
Return to original view | Post
#198
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
2,143 posts Joined: Mar 2011 |
QUOTE(contestchris @ May 28 2022, 11:22 AM) Is it possible for Malaysia to be the FPSO hub globally? As we have 3 experienced industry players, in the entire world not many companies specialise in this niche segment. Don't forget we have MTCE and M3nergy (SPC).. both companies are not financially strong, but they have capability.. Recently MTCE just won FPSO project at Indonesia.. |
|
|
May 29 2022, 09:47 PM
Return to original view | Post
#199
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
2,143 posts Joined: Mar 2011 |
QUOTE(langstrasse @ May 29 2022, 08:56 PM) Hi all, There is no such market rate for MNC.. you take it or leave it.. but most of the MNC offer good range of salary. You can query your contact in the MNC to obtain details of salary range for each level.How do you go about determining the "market rate" for your current/future roles? Do you: 1. Ask your network, seniors? 2. Ask recruiters via LinkedIn? 3. Look at job ads with salary information (damn hard to find these in Malaysia)? 4. Check websites e.g.Glassdoor ? Or reports from recruitment companies e.g. below (from what I've seen, these reports tend to be very broad across industries. But would be great to know if there are more industry specific reports). https://www.hays.com.my/salary-guide Which one has provided the best results? Specifically I'm talking about the upstream O&G industry in Malaysia. Would really appreciate any inputs on this. For Expatriation, you can check the index through https://www.air-inc.com/ (Petronas is using this). But you need to pay for the data/calculator. There is other web offer the same service. |
|
|
Jun 6 2022, 07:44 PM
Return to original view | Post
#200
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
2,143 posts Joined: Mar 2011 |
Malaysian water ader guna underwater drone ka? https://www.saipem.com/en/media/press-relea...s-fields-brazil jimbet1337 liked this post
|
|
Topic ClosedOptions
|
| Change to: | 0.1199sec
0.53
7 queries
GZIP Disabled
Time is now: 11th December 2025 - 09:36 AM |