QUOTE(Two5Kid @ Sep 27 2017, 04:42 PM)
How did you install the LEDs inside the shower area for the recessed part? Sure won't get electrocuted or what steps did you take to make sure that doesn't happen?
I chose insulated LEDs (the kind where the LED is inside a rubber tube) - you can also opt for IP67(?) waterproof casing to properly house LED strips which I think is a better way to do this.
QUOTE(champu @ Sep 27 2017, 03:56 PM)
is this the same house?
it's gorgeous. As for the plumbing and wiring I have come to accept there are no proper ones in Klang Valley anymore so it becomes a guessing game more than anything else.
Thanks! Yes, my wiring guy was a nightmare. Also under the contractor. My roof space is a tangle of wires. Lots of tidying up to do.
QUOTE(sonerin @ Sep 28 2017, 07:22 AM)
One lesson learn. Never just got out and find a company that you don't know and do major renovation. I had my fair share of bad contractor. Finally I met a contractor who became my friend and renovation can be very rewarding experience
Yeah definitely. If I don't have time to personally / have someone trusted to manage a project, it will be a no-no for sure in the future.
QUOTE(wkc @ Sep 29 2017, 04:39 PM)
How much TS has to for out again to fix the issue left out by the previous contractor
I have spent close to 15k so far. Leaking issues, wiring tidying up and a host of others (not too urgent ones) not done yet.
QUOTE(adrianjc @ Oct 3 2017, 11:33 AM)
End result looks very nice! The water proofing on the roof can be solved rather easily, don't worry too much about it. Just get the right people to do it for you.
Electrical can't do much if its due to the wiring... had an issue with my old place where the electrician stinged on earth wires causing the different wiring phase to occasionally overload and shut down. Not a big problem but damn annoying when it happens.
Thanks, I definitely hope there's an easy fix. I have not had overloads happen, but only the electricity trips too easily at the slightest lightning. Hopefully once the proper 3phase + fuse etc is done, there will be improvement.