Welcome Guest ( Log In | Register )

Bump Topic Topic Closed RSS Feed
15 Pages < 1 2 3 4 > » Bottom

Outline · [ Standard ] · Linear+

 Bandar Rimbayu V2, The Township Nature Perfected

views
     
phonixloo
post Aug 1 2014, 03:20 PM

Regular
******
Senior Member
1,162 posts

Joined: Jul 2014
From: Shah Alam


QUOTE(happyice @ Aug 1 2014, 02:12 PM)
i think no need, but u need to wash your car each time u use the road.. lol
i haven't go check check yet.. i think i read somewhere in this thread/previous one showing the road...
*
Faster go and check. Report back and upload some photo here thumbup.gif
phonixloo
post Aug 1 2014, 05:35 PM

Regular
******
Senior Member
1,162 posts

Joined: Jul 2014
From: Shah Alam


QUOTE(JamesPond @ Aug 1 2014, 03:33 PM)
i can bet with you the link wont happen in 2-3 years time.
sales just do their sweet talk and get commissions.
*
Do you refer to the yellow mud road, it is there since 23/Mar blink.gif

Whether normal car can go will be question mark

This post has been edited by phonixloo: Aug 1 2014, 05:36 PM


Attached thumbnail(s)
Attached Image
phonixloo
post Aug 3 2014, 07:42 AM

Regular
******
Senior Member
1,162 posts

Joined: Jul 2014
From: Shah Alam


QUOTE(novel87 @ Aug 2 2014, 11:21 PM)
any new launch for terrace or super link in future?
*
By year end should be another link house. Next year first quarter will launch their first strata house. Just get above info from their sales yesterday
phonixloo
post Aug 3 2014, 07:44 AM

Regular
******
Senior Member
1,162 posts

Joined: Jul 2014
From: Shah Alam


QUOTE(hornetsjet @ Aug 2 2014, 11:01 PM)
May i know where you get the satelite image? Coz google map still not updated.
*
Google earth.... desktop version only. Not mobile
phonixloo
post Aug 3 2014, 11:52 AM

Regular
******
Senior Member
1,162 posts

Joined: Jul 2014
From: Shah Alam


QUOTE(CloudAtla$ @ Aug 3 2014, 08:00 AM)
Many rich people build their castle outskirt in a very quiet place. Can keep mistress too.
*
Wah lau yeh..... good idea. Where you keep yours 😆
phonixloo
post Aug 4 2014, 09:11 AM

Regular
******
Senior Member
1,162 posts

Joined: Jul 2014
From: Shah Alam


QUOTE(JamesPond @ Aug 3 2014, 06:41 PM)
Nearer is a yes but longer. Most road is unpaved. I travel once. Perhaps need to wait until link is ready by 15 years?
*
May be we should reconsider to buy a 4WD. flex.gif
phonixloo
post Aug 5 2014, 12:53 PM

Regular
******
Senior Member
1,162 posts

Joined: Jul 2014
From: Shah Alam


QUOTE(hafizrahimi @ Aug 4 2014, 04:57 PM)
Just gotten the latest progress billing for Chimes. This one is for the internal and external finishes. So in total already 70% billed. Next one should be 5% for when the road is done and then VP!! I think VP by Dec is really plausible right now.
*
If not mistaken my one already 75% (including the initial 10%).
phonixloo
post Aug 5 2014, 02:08 PM

Regular
******
Senior Member
1,162 posts

Joined: Jul 2014
From: Shah Alam


QUOTE(hafizrahimi @ Aug 5 2014, 12:56 PM)
meaning they already billed you for the road accessing to your unit? Mine only this one not billed yet then the rest is billed after VP
*
Until the drain = 75%
Road access = 5%
VP = 15%
B/F = 5%


phonixloo
post Aug 5 2014, 02:59 PM

Regular
******
Senior Member
1,162 posts

Joined: Jul 2014
From: Shah Alam


QUOTE(waiDEE @ Aug 5 2014, 02:51 PM)
mine still they dont call for TNB and Syabas deposit payment...
*
Last weekend I just summit my form for TNB & Syabas. The mail mentioned must summit by 7-Aug blush.gif
phonixloo
post Aug 5 2014, 03:00 PM

Regular
******
Senior Member
1,162 posts

Joined: Jul 2014
From: Shah Alam


QUOTE(happyice @ Aug 5 2014, 02:34 PM)
i think if they build it before launching the shop offices & the luxury area near the lake, then it can help to boost their sales & price of the property.. some more since it's half way, why not completed it? i tthink they don't wan to take stone to hit their own leg? Unless there are some resistence from other area? like the golden triangle road at tmn puchong utama, take 10 years also haven't built, due to budget, government.. etc etc
*
I do support that with more access.... they can boost their price for future launch. whistling.gif
phonixloo
post Aug 8 2014, 12:16 PM

Regular
******
Senior Member
1,162 posts

Joined: Jul 2014
From: Shah Alam


QUOTE(JamesPond @ Aug 8 2014, 10:05 AM)
if ijm built prioir to dijaya and ecoworld. then, they are really stupid.
*
If they don't build it, their property value would not increase. Who will buy their property without proper infrastructure?


phonixloo
post Aug 8 2014, 02:17 PM

Regular
******
Senior Member
1,162 posts

Joined: Jul 2014
From: Shah Alam


QUOTE(waiDEE @ Aug 8 2014, 12:52 PM)
are there solely be borne by first developer? i meant the cost...
what happen is in future the road is gazetted as state road... i believed the stretch behind Chimes and Periwinkle will connecting from KESAS / Jln Kebun through EcoSanctuary and Tropicana Aman to Bdr Saujana Putra at the end...
if not, i think EcoWorld and Tropicana shud pay certain amount to recompensate...
*
They might do "something" in order to share the cost among each other. Still remember last time the connection between Kota Kemuning to Bukit Rimau was disconnected for the last 100m. We can see each other but due to the 100m yet to complete can't get it through. The 100m had been drag on for few years....... brows.gif

Lastly few developer had been share among the KK 2nd interchange with the exception of Gamuda. If not mistaken.

This post has been edited by phonixloo: Aug 8 2014, 02:17 PM
phonixloo
post Aug 8 2014, 05:15 PM

Regular
******
Senior Member
1,162 posts

Joined: Jul 2014
From: Shah Alam


QUOTE(vettel2020 @ Aug 8 2014, 03:35 PM)
SA mentioned by Sep
*
There is phase 4 by year end. Next year 1Q will be their strata (phase 5). What they told me, not sure true or not.

Last week went there Phase 1 show room inside all empty already. Being informed will be dismantle soon.
phonixloo
post Aug 9 2014, 10:27 AM

Regular
******
Senior Member
1,162 posts

Joined: Jul 2014
From: Shah Alam


QUOTE(eastken @ Aug 9 2014, 08:25 AM)
Thanks for info, but here written is strata title, but I am not sure whether is all phase or some phase.
http://setia-alamproperty.blogspot.com/201...ase-8d.html?m=1

Extra info, setia eco hill is individual and eco majestic is strata title.

For Rimbayu, from phase 5 onwards should be all strata title with high end price.
*
Get info the strata link house is RM900+ for intermidiate....

phonixloo
post Aug 9 2014, 10:28 AM

Regular
******
Senior Member
1,162 posts

Joined: Jul 2014
From: Shah Alam


QUOTE(PeriPeri2014 @ Aug 9 2014, 08:55 AM)
Rimbayu still got available unit?? I tot sold off 100% ?? Now is phase 4 or last phase 5??
*
Now left with Bumi lots only. Current still phase 3 smile.gif
phonixloo
post Aug 9 2014, 11:54 AM

Regular
******
Senior Member
1,162 posts

Joined: Jul 2014
From: Shah Alam


QUOTE(PeriPeri2014 @ Aug 9 2014, 11:07 AM)
disappointed....I still hope got 600K to 700k DSL
*
Don't expect any developer will launch something in the 600 - 700 k range. They start to rip the fruit already. Especially when the infrastruture ready.
phonixloo
post Aug 9 2014, 11:57 AM

Regular
******
Senior Member
1,162 posts

Joined: Jul 2014
From: Shah Alam


QUOTE(eastken @ Aug 9 2014, 10:54 AM)
Hahaha. Will not. Tropicana never do that.
But i know they will launch 2 storey / 3 storey parkhome G & G. I believe close to mil.
*
No developer will launch something cheaper than the phase 1 of Rimbayu. They won't use stone to hit their leg

This post has been edited by phonixloo: Aug 9 2014, 11:58 AM
phonixloo
post Aug 10 2014, 04:25 PM

Regular
******
Senior Member
1,162 posts

Joined: Jul 2014
From: Shah Alam


QUOTE(wil-i-am @ Aug 10 2014, 03:32 PM)
Latest update on take up rate:-
Phase 1 - 93%
Phase 2 - 73%
Phase 3 (40%) - 78%
*
Phase 1 I saw only got around 10 units left? How to get 93%

This post has been edited by phonixloo: Aug 10 2014, 04:26 PM
phonixloo
post Aug 10 2014, 04:27 PM

Regular
******
Senior Member
1,162 posts

Joined: Jul 2014
From: Shah Alam


QUOTE(novel87 @ Aug 10 2014, 04:24 PM)
Is BR Gated and Guarded?
*
Guarded only. Strata unit suppose to launch next year 1Q
phonixloo
post Aug 10 2014, 05:34 PM

Regular
******
Senior Member
1,162 posts

Joined: Jul 2014
From: Shah Alam


QUOTE(Fido.Dido @ Aug 10 2014, 05:24 PM)
Have tried out the Bandar Saujana Putra link today. Distance is about 10km from Rimbayu sales gallery. It took me roughly 13 minutes to arrive at Saujana Putra town centre. Would be faster if I didn't slow down/stop to take pics of the journey.

The link is already close to completion as >95% of it is already tarred. It's only a short stretch at the beginning and ending of the link that isn't tarred (Roughly 200m at the beginning and 100m at the end). It's only at this area whereby we need to slowdown due to potholes/gravel road. There rest of the journey would be worry free.

Have attached some pics below....
Journey within Kampong area

user posted image  user posted image
The road beside Elite is nearly completely tarred....  rclxms.gif  rclxms.gif  rclxms.gif

user posted image  user posted image
The short stretch outside City Link where we need to slow down due to potholes. Distance is only roughly around 100m. Once we passed this stretch, would be back to tarred road already and Bandar Saujana Putra is just around the corner... thumbup.gif  thumbup.gif

user posted image  user posted image
*
Bravo.....😊


15 Pages < 1 2 3 4 > » Top
Topic ClosedOptions
 

Change to:
| Lo-Fi Version
0.0453sec    0.61    7 queries    GZIP Disabled
Time is now: 14th December 2025 - 07:06 AM