QUOTE(supersound @ Jan 29 2015, 07:38 PM)
i guess all the operators start spending back again, rigs easy to get contracts and demand high dayrate....kekekeke...Oil & Gas Careers V6, Upstream and Downstream
Oil & Gas Careers V6, Upstream and Downstream
|
|
Jan 29 2015, 08:51 PM
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,597 posts Joined: Apr 2009 |
|
|
|
|
|
|
Jan 29 2015, 09:37 PM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
4,864 posts Joined: Nov 2008 |
|
|
|
Jan 29 2015, 09:38 PM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
4,864 posts Joined: Nov 2008 |
|
|
|
Jan 29 2015, 09:47 PM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
11,554 posts Joined: Aug 2009 |
|
|
|
Jan 29 2015, 11:32 PM
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,551 posts Joined: May 2009 |
|
|
|
Jan 30 2015, 09:17 AM
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,597 posts Joined: Apr 2009 |
|
|
|
|
|
|
Jan 30 2015, 09:32 AM
|
![]() ![]() ![]()
Junior Member
346 posts Joined: Jun 2007 |
|
|
|
Jan 30 2015, 09:36 AM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
11,554 posts Joined: Aug 2009 |
|
|
|
Jan 30 2015, 12:58 PM
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,551 posts Joined: May 2009 |
|
|
|
Jan 30 2015, 04:23 PM
|
![]() ![]() ![]() ![]() ![]()
Junior Member
840 posts Joined: Feb 2013 |
|
|
|
Jan 30 2015, 04:25 PM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
11,554 posts Joined: Aug 2009 |
|
|
|
Jan 30 2015, 04:48 PM
|
![]() ![]()
Junior Member
89 posts Joined: Feb 2009 |
|
|
|
Jan 30 2015, 04:58 PM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
11,554 posts Joined: Aug 2009 |
|
|
|
|
|
|
Jan 30 2015, 07:09 PM
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,551 posts Joined: May 2009 |
QUOTE(supersound @ Jan 30 2015, 04:58 PM) Nothing to do with OPEC on this. double edge sword that, one side i will be like yoshaaa!!!!im gonna drill and drill!!, other side will be im using a bicycle and will bury any combustion engine i have lol hahahah As now is US and Saudi are fighting, have to see who die first. If Saudi die first, oil price will shoot rocket high dilemma's of us ong workers. |
|
|
Jan 30 2015, 07:16 PM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
11,554 posts Joined: Aug 2009 |
QUOTE(mhyug @ Jan 30 2015, 07:09 PM) double edge sword that, one side i will be like yoshaaa!!!!im gonna drill and drill!!, other side will be im using a bicycle and will bury any combustion engine i have lol hahahah US wins and oil price go rocket high, recession will come faster dilemma's of us ong workers. Oil price rise and other business can't catch up will be problem. US's debt are way too high than we can imagine, they are trying to cover the holes now. That's why they are trying to flood the market with their oil. 1st step is to dominate the market then rise the price. But Saudi already see this, that's why they are playing poker with US. The stakes are high on this game. Both are chasing for the Ace. If Saudi wins, oil price goes back to 70-80 will be the best. |
|
|
Jan 30 2015, 08:54 PM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
2,140 posts Joined: Mar 2011 |
|
|
|
Jan 30 2015, 08:58 PM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
2,140 posts Joined: Mar 2011 |
QUOTE(mohdyakup @ Jan 26 2015, 02:19 AM) MALAYSIAN state player Petronas is screening floating production, storage and offloading vessel concepts for the Sepat oil and gas field in block PM 313 off Malaysia, ehhhh... My FSO SEPAT tak cukup ka??? FPSO SEPAT plak Local contractors Bumi Armada, M3nergy and SapuraKencana are among those that responded to the latest call for estimates for an FPSO. The floater is required to be able to process 34,000 barrels per day of oil and 240 million cubic feet per day of gas. The FPSO is expected to have a 20-year field life. A wellhead platform will also likely be needed. First oil from Sepat is planned in the fourth quarter of 2018. Petronas issued a market survey last October for an FPSO that would handle the field’s oil. The unit had an estimated processing capacity of about 25,000 bpd of oil and a planned field life of 10 years. A wellhead platform would also be required as part of this development solution. In 2013, the operator reviewed options for a central processing platform as an alternative concept to an FPSO. A 20,000-tonne central processing platform and two wellhead platforms were originally planned to exploit Sepat’s gas with production start-up touted in 2017. France’s Technip and Malaysia Marine & Heavy Engineering, Italy’s Saipem and SapuraKencana, McDermott of the US, and South Korea’s Hyundai Heavy Industries submitted proposals for the front-end engineering and engineering, procurement and construction for these facilities. Sepat has been flowing oil since 2011 via an early production system that uses the floating storage and offloading vessel named Sepat. https://www.linkedin.com/groups/FPSO-vessel...#commentID_null This post has been edited by abgkik: Jan 30 2015, 10:41 PM |
|
|
Jan 30 2015, 09:11 PM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
4,351 posts Joined: Oct 2009 From: Bintulu, Sarawak |
|
|
|
Jan 30 2015, 09:12 PM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
4,351 posts Joined: Oct 2009 From: Bintulu, Sarawak |
|
|
|
Jan 30 2015, 09:59 PM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
2,140 posts Joined: Mar 2011 |
|
|
Topic ClosedOptions
|
| Change to: | 0.0340sec
0.39
6 queries
GZIP Disabled
Time is now: 2nd December 2025 - 12:29 AM |