Welcome Guest ( Log In | Register )

Bump Topic Topic Closed RSS Feed

Outline · [ Standard ] · Linear+

 Oil & Gas Careers V6, Upstream and Downstream

views
     
TSmohdyakup
post Feb 8 2015, 02:59 PM

Look at all my stars!!
*******
Senior Member
4,351 posts

Joined: Oct 2009
From: Bintulu, Sarawak


I see. Ahaa Warga Hikmat I heard that before. Havent deal with PEC before but coming soon I guess hope they wont give much headache to me...
TSmohdyakup
post Feb 8 2015, 03:28 PM

Look at all my stars!!
*******
Senior Member
4,351 posts

Joined: Oct 2009
From: Bintulu, Sarawak


http://rt.com/news/224371-oil-rig-berkut-extraction/

Biggest oil rig ever: 200k-ton Sakhalin giant begins production
Published time: January 20, 2015 14:57
Edited time: January 22, 2015 08:10 Get short URL
image from http://sdelanounas.ru
image from http://sdelanounas.ru
Tags

Natural resources, Oil, Russia, Russia and the global economy, Sanctions, SciTech

The world’s biggest oil platform has begun commercial production at the Sakhalin-1 offshore project in Russia’s Far East. The Berkut oil rig is expected to extract 4.5 million tons of oil annually.

The Sakhalin-1 Consortium was formed in 1996 is the first major shelf project in Russia created under terms of a Product Sharing Agreement (PSA). The international consortium is made up of the US major ExxonMobil (30 percent), Japan's Sodeco (30 percent), Russia’s Rosneft (20 percent) and India's ONGC Videsh (20 percent).

The total cost of the project is estimated to be $10-12 billion, making it the largest direct foreign investment in Russia.

The Berkut platform is expected to produce 12,000 tons of oil daily or about 4.5 million tons annually, raising the total output of the Sakhalin-1 Consortium to 27,000 tons a day.

Oil from the Arkutun-Dagi oil field will be processed at the Chaivo onshore treatment facility and then delivered by a pipeline to the DeKastri oil export terminal.

The tax revenues from oil produced by the Berkut platform will provide Russia’s regional and federal budgets with no less than $9 billion over the next ten years.


The Berkut rig is designed to work in harsh Arctic conditions, and has an autonomous power supply and can work even when temperatures go down to minus 44 degrees Celsius. Floating ice up to two meters thick cannot damage its substructure.

The drilling platform can withstand a 9 magnitude earthquake, and waves up to 18 meters high.

READ MORE: Arctic crude becomes new Russia's oil blend

The field which spreads 60 kilometers offshore holds 72 million tons of recoverable oil, is also being developed by another oil rig specially built for the task.

The US and the EU sanctions are targeting Russia’s big Arctic and Siberia shale oil ambitions by barring foreign oil companies from supplying any technology or equipment for joint ventures in deep water, offshore, or shale projects.

Drilling will continue even if sanctions prevent foreign companies from participating in Russia’s Arctic, Rosneft CEO Igor Sechin said in September in an interview with Bloomberg News.

READ MORE: Russia can drill in Arctic, even without Exxon – energy official

“Of course we’ll do it on our own and attract the necessary technology and different partners who don’t have limitations on cooperation,” the Rosneft CEO said.
TSmohdyakup
post Feb 8 2015, 05:25 PM

Look at all my stars!!
*******
Senior Member
4,351 posts

Joined: Oct 2009
From: Bintulu, Sarawak


I sense Hyundai Heavy Engineering is expanding overseas and coming to Bintulu soon? Or Daewoo Engineering? The possibility of opening a large fabrication yard can be realized at Similajau area. Insyaallah.

S. Korean firm mulls US$4 bln investment in oil and gas sector

by Johnson K Saai, reporters@theborneopost.com. Posted on February 5, 2015, Thursday

Adenan (centre) welcomes Cho Byungjae to his office. On the right is Tiong.
KUCHING: A South Korean power company is keen to invest about US$4 billion (RM14.27 billion) in the state’s oil and gas industry.

This was revealed to reporters by Malaysian Special Envoy to Japan, Korea and Taiwan Datuk Seri Tiong King Sing, who accompanied the South Korean delegation to pay a courtesy call on Chief Minister Datuk Patinggi Tan Sri Adenan Satem here yesterday.

The delegation was led by South Korean Ambassador to Malaysia Cho Byungjae.
“This (proposed investment) was among things they conveyed to the chief minister just now.

“According to them, the company is interested to invest in our oil and gas.

“They, however, told Adenan that they needed to do a feasibility study first.”

Tiong, who is also Bintulu MP, said the Korean firm would work with the state government to identify opportunities in the oil and gas industry, particularly in Bintulu.

“Thus far, we have quite a number of Korean companies investing in various sectors in Sarawak, such as in Sibu, Miri, Bintulu and in Kuching, but in the oil and gas industry, I think this is the first of its kind (by the Koreans).”

Read more: http://www.theborneopost.com/2015/02/05/s-.../#ixzz3R8ybo1wB
ch_teo
post Feb 8 2015, 10:07 PM

Enthusiast
*****
Senior Member
809 posts

Joined: Jan 2006
eat balance and moderately with less meat and seasonings, control diet. the photo on the chicken rice with curry fish is very tempting biggrin.gif
do exercise at least 2 or 3 times a week.
lesser smoking and drinking or totally avoid these...

so high BP can be regulated down to normal rate.
TSmohdyakup
post Feb 8 2015, 10:08 PM

Look at all my stars!!
*******
Senior Member
4,351 posts

Joined: Oct 2009
From: Bintulu, Sarawak


QUOTE(ch_teo @ Feb 8 2015, 10:07 PM)
eat balance and moderately with less meat and seasonings, control diet. the photo on the chicken rice with curry fish is very tempting  biggrin.gif
do exercise at least 2 or 3 times a week.
lesser smoking and drinking or totally avoid these...

so high BP can be regulated down to normal rate.
*
Hehehehe noted brows.gif
TSmohdyakup
post Feb 8 2015, 10:08 PM

Look at all my stars!!
*******
Senior Member
4,351 posts

Joined: Oct 2009
From: Bintulu, Sarawak


It wasnt curry fish, ikan patin masak lemak tempoyak to be exact. Nomsnomsnoms
thpace
post Feb 8 2015, 11:04 PM

Rising Star
******
Senior Member
1,210 posts

Joined: Aug 2011
may i ask what the different between field engineer and field specialist?

Some told me job scope diff while some say it the same without engineer tittle

so any concrete opinion?
nash9701
post Feb 8 2015, 11:30 PM

looking for a bright future...
******
Senior Member
1,356 posts

Joined: Feb 2007
From: somewhere in Perak...



QUOTE(mohdyakup @ Feb 8 2015, 02:59 PM)
I see. Ahaa Warga Hikmat I heard that before. Havent deal with PEC before but coming soon I guess hope they wont give much headache to me...
*
If you dealing with downstream, you will know there are big umbrella main contractor inside each plant (Petronas, Shell, Esso a.k.a Petron etc.) Btw, Warga Hikmat no more already after got problem with overseas project. They are one of pioneer contractor in downstream business

(^__^)
nash9701
post Feb 8 2015, 11:43 PM

looking for a bright future...
******
Senior Member
1,356 posts

Joined: Feb 2007
From: somewhere in Perak...



QUOTE(alvinkhorfire @ Feb 8 2015, 05:57 AM)
Really, I generally thought that companies only emphasize on years of working experience we have, and our ability in handling various projects, before promoting us to higher position. For Ir. title, it may be important, as having several professional engineers may enhance the CV of personnel submitted for the award of a project. Plus, the AFC drawing may need Ir. stamp to be valid.

Master degree? I do not think that companies would value on-paper knowledge, citing that these theoretical knowledge is too idealistic to be applied in real life offshore challenges.  Thus, for companies, the Master degrees is not important, unless the research topic for Master degree is really relevant to company's area of interest.

Oil and gas experts, feel free to correct me, if I am wrong.  smile.gif I am more than willing to learn from you all, and this has been a useful forum thread for all.
*
well i did not say it is totally right, but it do assist. sometimes it has conflict within top level management which I saw couple of times. Hence, if you have both, it is better. Some companies do not care much on this, but some company does. If you talk about CEO, COO position, then it will be also take into consideration. But it must always come together with experience, as qualification alone will not make it.

Note : As I say, it do assist but depending on the situation. Thus, it not a compulsory to have master degree, but if you got chance and time to do it, why not

(^__^)
TSmohdyakup
post Feb 9 2015, 12:10 AM

Look at all my stars!!
*******
Senior Member
4,351 posts

Joined: Oct 2009
From: Bintulu, Sarawak


Check this out:

Operations and Commissioning Positions in Iraq

https://www.linkedin.com/pulse/operations-c...-paul-mcgrother
TSmohdyakup
post Feb 9 2015, 01:09 AM

Look at all my stars!!
*******
Senior Member
4,351 posts

Joined: Oct 2009
From: Bintulu, Sarawak


We are currently looking to fill the following positions for our projects in the Middle East & North African Region.
Interested applicants are requested to send their updated CV to sarala.rao@petrofac.com

1. Construction Director
2. Site Manager
3. Construction Manager
4. Fabrication Manager

Candidate should have executed Mega LSTK projects in EPC environment.

Regards,
Sarala Rao
TSmohdyakup
post Feb 9 2015, 01:23 AM

Look at all my stars!!
*******
Senior Member
4,351 posts

Joined: Oct 2009
From: Bintulu, Sarawak


QUOTE(abgkik @ Feb 7 2015, 11:03 AM)
Boleh.. Boleh.. Tunggu 100 dulu  smile.gif
*
This thread has reached 100 pages hopefully abgkik will be the next thread starter. Am closing this V6 thread. See you guys at V7 thread via abgkik. Chaloooo.



99 Pages « < 97 98 99Top
Topic ClosedOptions
 

Change to:
| Lo-Fi Version
0.0246sec    0.35    6 queries    GZIP Disabled
Time is now: 27th November 2025 - 10:58 PM