Welcome Guest ( Log In | Register )

90 Pages « < 70 71 72 73 74 > » Bottom

Outline · [ Standard ] · Linear+

Investment Maxim Residences @ Cheras KL

views
     
johnnyg
post Jan 14 2017, 07:10 AM

Getting Started
**
Junior Member
290 posts

Joined: Jul 2008
Just opposite the commercial shop lots, MRT development for multi storey car park under way.
DisneyHome
post Jan 14 2017, 07:57 AM

Casual
***
Junior Member
461 posts

Joined: May 2015
QUOTE(BEANCOUNTER @ Jan 4 2017, 03:57 PM)
cranes still there.........and the other block looks like belum painted yet......

I seriously doubt april or may can vp......
*
Attached Image

This is yesterday outlook

gks
post Jan 14 2017, 09:22 AM

Look at all my stars!!
*******
Senior Member
3,835 posts

Joined: May 2008
QUOTE(DisneyHome @ Jan 14 2017, 07:57 AM)
Attached Image

This is yesterday outlook
*
I think it is not a bad thing Maxim take their sweet time to complete this project. Let the MRT in operational first....
shinoxun
post Jan 14 2017, 09:25 AM

Getting Started
**
Junior Member
261 posts

Joined: Apr 2008
From: For me to know, For you to find out.


So its destined to be in this color eh?
propertybbb
post Jan 15 2017, 03:23 PM

Look at all my stars!!
*******
Senior Member
2,663 posts

Joined: Feb 2013
QUOTE(shinoxun @ Jan 14 2017, 10:25 AM)
So its destined to be in this color eh?
*
Maxim products all same o same o...perhaps a bit darker color scheme may be added in certain part of the building based on their other vped projects. Wont be drastically different i think. Lol. Actual facade if compare to the filmsy brochure, already much better. Lol.
Quang1819
post Jan 15 2017, 03:52 PM

Look at all my stars!!
*******
Senior Member
2,604 posts

Joined: Dec 2012
isn't this the building that caused massive floods to the residents there? lol
kwwong1
post Jan 15 2017, 09:28 PM

Casual
***
Junior Member
484 posts

Joined: Sep 2013


QUOTE(Quang1819 @ Jan 15 2017, 03:52 PM)
isn't this the building that caused massive floods to the residents there? lol
*
This is the fact but the developer always denied
Quang1819
post Jan 15 2017, 09:30 PM

Look at all my stars!!
*******
Senior Member
2,604 posts

Joined: Dec 2012
QUOTE(kwwong1 @ Jan 15 2017, 09:28 PM)
This is the fact but the developer always denied
*
That means the city council didn't impose any penalties or fine?

or has it been covered with bribery
shinoxun
post Jan 15 2017, 10:01 PM

Getting Started
**
Junior Member
261 posts

Joined: Apr 2008
From: For me to know, For you to find out.


QUOTE(propertybbb @ Jan 15 2017, 03:23 PM)
Maxim products all same o same o...perhaps a bit darker color scheme may be added in certain part of the building based on their other vped projects. Wont be drastically different i think. Lol. Actual facade if compare to the filmsy brochure, already much better. Lol.
*
Eventhough the building looks grand from afar,but the color made it looked like edy decades dint repaint.

confused.gif
rickygoh98698
post Jan 31 2017, 11:21 AM

Getting Started
**
Junior Member
115 posts

Joined: Apr 2014
QUOTE(gks @ Jan 14 2017, 09:22 AM)
I think it is not a bad thing Maxim take their sweet time to complete this project. Let the MRT in operational first....
*
Agree... I hope so...
Jagalat
post Jan 31 2017, 01:26 PM

(J)et L(ag) Ji(alat)
*******
Senior Member
5,949 posts

Joined: Oct 2013
During their sweet time to complete, l hope they also resolve the root cause of flash flood.
I had a friend staying next to the project and experienced multiple times the flash flood...
Saw his pictures of water coming home and water staying home for a few hours.
He told, once water left, mud and smell stayed and some wooden furniture has to go(thrown) after a few occasions...can't imagine how he can handle it...

This post has been edited by Jagalat: Jan 31 2017, 01:31 PM
gks
post Feb 1 2017, 02:21 PM

Look at all my stars!!
*******
Senior Member
3,835 posts

Joined: May 2008
https://m.facebook.com/story.php?story_fbid...167813966699572

Seems the pedestrian linkage is under construction.
propertybbb
post Feb 1 2017, 03:42 PM

Look at all my stars!!
*******
Senior Member
2,663 posts

Joined: Feb 2013
QUOTE(gks @ Feb 1 2017, 03:21 PM)
https://m.facebook.com/story.php?story_fbid...167813966699572

Seems the pedestrian linkage is under construction.
*
So suddenly this prop becomes mrt related property. Haha...last time visited the site..can hardly figure out how to reach pheonix plaza now cheras sentral there.
planc
post Feb 1 2017, 08:04 PM

Regular
******
Senior Member
1,416 posts

Joined: Feb 2015
QUOTE(gks @ Feb 1 2017, 01:21 PM)
https://m.facebook.com/story.php?story_fbid...167813966699572

Seems the pedestrian linkage is under construction.
*
Facades look like Kiara Residences Bukit Jalil, are they abang Adik?
kwwong1
post Feb 6 2017, 10:40 AM

Casual
***
Junior Member
484 posts

Joined: Sep 2013


QUOTE(gks @ Feb 1 2017, 02:21 PM)
https://m.facebook.com/story.php?story_fbid...167813966699572

Seems the pedestrian linkage is under construction.
*
doubt so. Can't see any bridge related work. I pass by almost every day.
gks
post Feb 6 2017, 11:32 AM

Look at all my stars!!
*******
Senior Member
3,835 posts

Joined: May 2008
QUOTE(kwwong1 @ Feb 6 2017, 10:40 AM)
doubt so. Can't see any bridge related work. I pass by almost every day.
*
If you noticed from the photos from PROPCAFE, there are steel brackets on the building structural to support the pedestrian linkage.

And the steel structural linkage is still lying on the ground.

The next I wonder whether the developer of cheras center point will build pedestrian linkage from their shoplots to thr cheras Sentral or not.
kwwong1
post Feb 7 2017, 12:18 PM

Casual
***
Junior Member
484 posts

Joined: Sep 2013


QUOTE(gks @ Feb 6 2017, 11:32 AM)
If you noticed from the photos from PROPCAFE, there are steel brackets on the building structural to support the pedestrian linkage.

And the steel structural linkage is still lying on the ground.

The next I wonder whether the developer of cheras center point will build pedestrian linkage from their shoplots to thr cheras Sentral or not.
*
Ok, the predestrian linkage is from Maxim to next door, not directly to the MRT station.


OperaGhost
post Feb 7 2017, 06:07 PM

Casual
***
Junior Member
474 posts

Joined: Nov 2011
QUOTE(kwwong1 @ Feb 7 2017, 12:18 PM)
Ok, the predestrian linkage is from Maxim to next door, not directly to the MRT station.
*
So meaning no such thing as bridge from Maxim to the mall?
kwwong1
post Feb 10 2017, 08:39 AM

Casual
***
Junior Member
484 posts

Joined: Sep 2013


QUOTE(OperaGhost @ Feb 7 2017, 06:07 PM)
So meaning no such thing as bridge from Maxim to the mall?
*
No direct bridge for sure. The next door developer is planning to build a link bridge/sheltered access to MRT station. Residences in Maxim development can "tumpang" their access when completed probably few years later.
kentmeng
post Feb 10 2017, 09:58 AM

Casual
***
Junior Member
339 posts

Joined: Mar 2016
From: Malaysia


QUOTE(kwwong1 @ Feb 10 2017, 08:39 AM)
No direct bridge for sure. The next door developer is planning to build a link bridge/sheltered access to MRT station. Residences in Maxim development can "tumpang" their access when completed probably few years later.
*
better then ntg =)

90 Pages « < 70 71 72 73 74 > » Top
 

Change to:
| Lo-Fi Version
0.0412sec    0.67    6 queries    GZIP Disabled
Time is now: 21st December 2025 - 07:21 AM