QUOTE(Cossie1971 @ Nov 16 2013, 10:30 AM)
I collected the keys to my Willow unit. Generally satisfied with the build quality, and the fact that it comes well equipped with 2 water pumps, heater, alarm and others including even a jacuzzi bathtub. Also noticeably there are no hairline cracks on the walls which I hv observed appearing in other phases and the paintwork was also done well without discoloration or patches.
However my biggest gripe is the metal folding garage door. It's operation is downright dangerous and appears to be a heavy duty industrial type of design with no sensors to detect obstacles. And it's one push for open and close, so it'll potentially crush anything in its way! cars, kids, maids, and pets and old folks included. furthermore the garage space is woefully short and you won't be able to park 2 cars of reasonable size in it. Two myvis yes, but two sedans, no way.
This appears to be a serious design flaw by the architect, and developer and I believe many owners have lodged complaints from both a practicality and safety angle. If you haven't, you should in order to get the developer to do something about it.
Sime Darby as a responsible developer must look into this and find a resolution urgently, either to get the contractor to modify the design and incorporate safety features, or replace the folding door with a single pane roller type, before a serious accident occurs and injures a home owner.
Drop me a note if u feel the same way about Willow's garage doors.
I've collected my MT keys and VP last week. The SD guy who did the HO told me about the issue at WP due to the garage door. Heard that some owner have bring this into lawsuit. And yes it look small. I notice this when the SD guy brought me to WP to witness my solar panel on my roof. However the overall built of WP (mind the garage) I would say slightly above par. The design was nice and pleasing. If have money, I would buy (provided they fix the garage issue

).
AS for MT, saw some unit already start reno. Manage to say hi to one of my neighbor across the street a malay lady with a movers infront of the house. Moving in her stuff from her old house first and will stay temp. at her parents in S.alam for while until everything settle.
Plan to go for defect checkup before end of the month..Nothing major I hope although I notice some water mark on the master bedroom and the wooden floor.