 D'Aman Residence, Puchong

views
     
thszone
post Aug 28 2012, 10:20 AM

Getting Started
**
Junior Member
151 posts

Joined: Mar 2012


QUOTE(mango27 @ Aug 28 2012, 09:52 AM)
100 per month means 1200 per year.. 35 years is 42k d.. so its not less IMO..

But how they calculate the car park since it suppose to be free 2 car parks?
*
Yup, but RM1200 interest per year means they claim from bank around 28k+ (from 4.2% interest) >>> 1200/4.2*100 = 28k+ , quite less also.
I think this may be the initial claim for some minor development, e.g. car park or elevator. They may claim again for facilities, e.g. gym room, swimming pool, it may be another 30k or more.
This is what i think, we have to confirm with Masteron, it's bette if we can get the draft for this from them.

I dunno how they calculate, maybe they will allocate 20k per car park. free 2 car parks i think is just a marketing way by Masteron.
jeoneun
post Aug 28 2012, 11:57 AM

Getting Started
**
Junior Member
228 posts

Joined: Aug 2012
QUOTE(mango27 @ Aug 28 2012, 02:34 AM)
I would like to know about this too... if anyone has further info please do share...

the claims from developer does vary so its quite subjective... there were developers i heard claim from bank once car parks is built and some claims not floor by floor but phases of floors(ie, 3 phases low floors, mid floors and high floors of residential floors)... so its good to know what is confirm... but do we have the right to request for the draft?

and ya, it was the SA that approached me told me STN12 was postponed STN11 is ~2km away... i also do prefer LRT not too close as it would be target of more students if it were just walking distance apart...


Added on August 28, 2012, 2:54 am
so what is the monthly amount after capitalized interest for MBB? banker mentioned is around ~RM100 extra right? so if u dump in extra money to offset the interest, but your minimum monthly repayment will be still extra ~RM100 right? Also, how much is the legal fee for MBB loan?
*
I asked my fren about this. He bought a under-con unit in PJ. The developer needs to claim up to 50% for earthworks, foundation works and car park construction, etc. So, he has to start serving progressive interest after the Bank has disbursed the progressive claim.

Different message (or nicer story) conveyed by the Masteron sales agent. Better check out. Buyers/ Potential buyers deserve to know the truth.
thszone
post Aug 28 2012, 01:44 PM

Getting Started
**
Junior Member
151 posts

Joined: Mar 2012


QUOTE(jeoneun @ Aug 28 2012, 11:57 AM)
I asked my fren about this. He bought a under-con unit in PJ. The developer needs to claim up to 50% for earthworks, foundation works and car park construction, etc. So, he has to start serving progressive interest after the Bank has disbursed the progressive claim.

Different message (or nicer story) conveyed by the Masteron sales agent. Better check out. Buyers/ Potential buyers deserve to know the truth.
*
Ya, we should do smth on this, give some pressure to them, else they will just hide everything in a blackbox.
TSmango27
post Aug 31 2012, 01:20 AM

Enthusiast
*****
Senior Member
965 posts

Joined: Apr 2006


i think the land in front of calisa is to build low cost apartment... 448 units... thats alot... As you can see, the second image below doesnt have Phase 7A, but the only one piece of land available for that, which is beside a sewage treatment... make sense to build low cost there... guess its a bad news for Taman Mas...

user posted image

user posted image
thszone
post Aug 31 2012, 10:12 AM

Getting Started
**
Junior Member
151 posts

Joined: Mar 2012


QUOTE(mango27 @ Aug 31 2012, 01:20 AM)
i think the land in front of calisa is to build low cost apartment... 448 units... thats alot... As you can see, the second image below doesnt have Phase 7A, but the only one piece of land available for that, which is beside a sewage treatment... make sense to build low cost there... guess its a bad news for Taman Mas...

user posted image

user posted image
*
Oops, it was really a bad news.
So pro, how u get this info?
kmao
post Aug 31 2012, 11:12 PM

Getting Started
**
Junior Member
206 posts

Joined: Jun 2008
From: Petaling Jaya



QUOTE(mango27 @ Aug 31 2012, 01:20 AM)
i think the land in front of calisa is to build low cost apartment... 448 units... thats alot... As you can see, the second image below doesnt have Phase 7A, but the only one piece of land available for that, which is beside a sewage treatment... make sense to build low cost there... guess its a bad news for Taman Mas...

user posted image

user posted image
*
Hi Mango, can this news be trusted?? if its true, i might wanna cancel my booking..
bumbubali
post Sep 1 2012, 04:39 PM

New Member
*
Junior Member
34 posts

Joined: Jul 2012
QUOTE(jeoneun @ Aug 28 2012, 11:57 AM)
I asked my fren about this. He bought a under-con unit in PJ. The developer needs to claim up to 50% for earthworks, foundation works and car park construction, etc. So, he has to start serving progressive interest after the Bank has disbursed the progressive claim.

Different message (or nicer story) conveyed by the Masteron sales agent. Better check out. Buyers/ Potential buyers deserve to know the truth.
*
I went to Mbb and clarify with my friend who's working in SP Setia he told me its a standard practiced where start obtain the disbursement from the bank once their completion in accordance to a schedule approved by ministry. So i think we need to check if their schedule is approved or not?

Jeoneun, if your friend's developer claiming 50% i think its too high lor... does this meant we paying 50% of the loan installment amount? I'll go to the developer on monday to check & confirm the percentage.
thszone
post Sep 1 2012, 06:27 PM

Getting Started
**
Junior Member
151 posts

Joined: Mar 2012


QUOTE(kmao @ Aug 31 2012, 11:12 PM)
Hi Mango, can this news be trusted?? if its true, i might wanna cancel my booking..
*
You will never able to get back your deposit unless loan rejected case. This is what the developer told me. Do let me know if u can cancel with refund of deposit, i may cancel it also.


Added on September 1, 2012, 6:28 pm
QUOTE(bumbubali @ Sep 1 2012, 04:39 PM)
I went to Mbb and clarify with my friend who's working in SP Setia he told me its a standard practiced where start obtain the disbursement from the bank once their completion in accordance to a schedule approved by ministry. So i think we need to check if their schedule is approved or not?

Jeoneun, if your friend's developer claiming 50% i think its too high lor... does this meant we paying 50% of the loan installment amount? I'll go to the developer on monday to check & confirm the percentage.
*
do update me if you have any news about this. thanks. smile.gif

This post has been edited by thszone: Sep 1 2012, 06:28 PM
kmao
post Sep 1 2012, 08:57 PM

Getting Started
**
Junior Member
206 posts

Joined: Jun 2008
From: Petaling Jaya



QUOTE(thszone @ Sep 1 2012, 06:27 PM)
You will never able to get back your deposit unless loan rejected case. This is what the developer told me. Do let me know if u can cancel with refund of deposit, i may cancel it also.
i could cancel anytime, this is because i not yet apply loan..
they told me as long as i do not apply loan i could get back my deposit.
thszone
post Sep 1 2012, 09:42 PM

Getting Started
**
Junior Member
151 posts

Joined: Mar 2012


QUOTE(kmao @ Sep 1 2012, 08:57 PM)
i could cancel anytime, this is because i not yet apply loan..
they told me as long as i do not apply loan i could get back my deposit.
*
I think u better confirm with them again. I don't think they will be so kind, let u simply book and cancel without any acceptable reason, acceptable from their point of view, e.g. bank loan rejected.
kmao
post Sep 2 2012, 01:33 PM

Getting Started
**
Junior Member
206 posts

Joined: Jun 2008
From: Petaling Jaya



QUOTE(kmao @ Sep 1 2012, 08:57 PM)
i could cancel anytime, this is because i not yet apply loan..
they told me as long as i do not apply loan i could get back my deposit.
*
i confirm for few times with them before i pay the 3k haha..
should be not a problem..
thanks =)
thszone
post Sep 2 2012, 04:04 PM

Getting Started
**
Junior Member
151 posts

Joined: Mar 2012


QUOTE(kmao @ Sep 2 2012, 01:33 PM)
i confirm for few times with them before i pay the 3k haha..
should be not a problem..
thanks  =)
*
Then which unit u r holding? My fren may be interesting.
jeoneun
post Sep 2 2012, 09:31 PM

Getting Started
**
Junior Member
228 posts

Joined: Aug 2012
QUOTE(bumbubali @ Sep 1 2012, 04:39 PM)
I went to Mbb and clarify with my friend who's working in SP Setia he told me its a standard practiced where start obtain the disbursement from the bank once their completion in accordance to a schedule approved by ministry. So i think we need to check if their schedule is approved or not?

Jeoneun, if your friend's developer claiming 50% i think its too high lor... does this meant we paying 50% of the loan installment amount? I'll go to the developer on monday to check & confirm the percentage.
*
That's what stated in the billing schedule. I saw it.

It means when the bank claims 40% for piling, foundation works and building of car parks, the borrower will be charged progressive interest based on the 40% of property price. If your unit is at lower floor, it's faster you will be charged more coz the developer has probably claimed up to 90%. Meaning to say up to 90% of your property price bcos basically your parcel/ unit has been completed.

View the billing stage as individual case NOT collectively. Then, you will understand.


Added on September 2, 2012, 9:41 pm
QUOTE(kmao @ Sep 2 2012, 01:33 PM)
i confirm for few times with them before i pay the 3k haha..
should be not a problem..
thanks  =)
*
They can confirm many things before you place your deposit. If everyone can simply call off the deal without valid reason (e.g. loan rejected) and get back refund, then developer can close shop already. Do you think they will simply let go?? Perhaps put yourself into their shoe whistling.gif

Anyway, wish you luck. Once succeed, you may share it here. We'll be happy for you.

This post has been edited by jeoneun: Sep 2 2012, 09:41 PM
bumbubali
post Sep 2 2012, 10:22 PM

New Member
*
Junior Member
34 posts

Joined: Jul 2012
QUOTE(jeoneun @ Sep 2 2012, 09:31 PM)
That's what stated in the billing schedule. I saw it.

It means when the bank claims 40% for piling, foundation works and building of car parks, the borrower will be charged progressive interest based on the 40% of property price. If your unit is at lower floor, it's faster you will be charged more coz the developer has probably claimed up to 90%. Meaning to say up to 90% of your property price bcos basically your parcel/ unit has been completed.

View the billing stage as individual case NOT collectively. Then, you will understand.


Added on September 2, 2012, 9:41 pm

They can confirm many things before you place your deposit. If everyone can simply call off the deal without valid reason (e.g. loan rejected) and get back refund, then developer can close shop already. Do you think they will simply let go?? Perhaps put yourself into their shoe  whistling.gif

Anyway, wish you luck. Once succeed, you may share it here. We'll be happy for you.
*
I'll check with them tmrw... anyway we cant stop other development at the surroundings, I think the multi-security system in place will help us safe-guard our residence. Seriously its indeed low entry cost for us compare to some of the new properties i've seen.

Jeoneun, I'll check with them the schedule and really want to know the billing states. Post you gusy update tmrw.....

Chaooooo!
thszone
post Sep 2 2012, 11:09 PM

Getting Started
**
Junior Member
151 posts

Joined: Mar 2012


For who that holding Unit No.25 or No.26 from floor 11th onwards, if you wanted to cancel or loan rejected, do PM me, i'm strongly interested to your unit. For cancel case, you can get back ur deposit easily with my replacement, and for loan rejected case, plz help to inform me so that i can go book that unit immediately. Thank you so much. smile.gif
bumbubali
post Sep 2 2012, 11:36 PM

New Member
*
Junior Member
34 posts

Joined: Jul 2012
QUOTE(thszone @ Sep 2 2012, 11:09 PM)
For who that holding Unit No.25 or No.26 from floor 11th onwards, if you wanted to cancel or loan rejected, do PM me, i'm strongly interested to your unit. For cancel case, you can get back ur deposit easily with my replacement, and for loan rejected case, plz help to inform me so that i can go book that unit immediately. Thank you so much. smile.gif
*
Wow... thszone, these unit seem to be the best view of all! good choice eh! I thought you bought a unit? Buying one more for investment?

My, sister so tempted to buy also. Let's see if any pool view unit loan reject will be great! Hie..hie we seems so bad hoh..! rclxm9.gif
thszone
post Sep 3 2012, 08:21 AM

Getting Started
**
Junior Member
151 posts

Joined: Mar 2012


QUOTE(bumbubali @ Sep 2 2012, 11:36 PM)
Wow... thszone,  these unit seem to be the best view of all! good choice eh! I thought you bought a unit? Buying one more for investment?

My, sister so tempted to buy also. Let's see if any pool view unit loan reject will be great! Hie..hie we seems so bad hoh..!  rclxm9.gif
*
Haha~ not bad, just in case if so lucky got loan rejected unit or cancel unit~
I do have one unit, No.23. My sister interesting to No.25/26~


Added on September 3, 2012, 8:49 am
QUOTE(mango27 @ Aug 31 2012, 01:20 AM)
i think the land in front of calisa is to build low cost apartment... 448 units... thats alot... As you can see, the second image below doesnt have Phase 7A, but the only one piece of land available for that, which is beside a sewage treatment... make sense to build low cost there... guess its a bad news for Taman Mas...

user posted image

user posted image
*
Hi Mango, are u meaning that the land beside the sewage treatment (near Koi Prima), or the land opposite D'Aman/CalisaM/CalisaN (Beside Putra Prima's Double Storey) ?

This post has been edited by thszone: Sep 3 2012, 08:49 AM
TSmango27
post Sep 5 2012, 10:12 PM

Enthusiast
*****
Senior Member
965 posts

Joined: Apr 2006


QUOTE(thszone @ Sep 3 2012, 08:21 AM)
Haha~ not bad, just in case if so lucky got loan rejected unit or cancel unit~
I do have one unit, No.23. My sister interesting to No.25/26~


Added on September 3, 2012, 8:49 am

Hi Mango, are u meaning that the land beside the sewage treatment (near Koi Prima), or the land opposite D'Aman/CalisaM/CalisaN (Beside Putra Prima's Double Storey) ?
*
The land beside koi prima is taman mas d.. so should be the land opposite calisa which belongs to plenitude..
thszone
post Sep 6 2012, 09:00 AM

Getting Started
**
Junior Member
151 posts

Joined: Mar 2012


QUOTE(mango27 @ Sep 5 2012, 10:12 PM)
The land beside koi prima is taman mas d.. so should be the land opposite calisa which belongs to plenitude..
*
Then it was really a bad news~ Just pray for it, Taman Mas will have a good future~ smile.gif
| KENZO |
post Sep 8 2012, 03:15 AM

Casual
***
Junior Member
395 posts

Joined: Jun 2012
QUOTE(thszone @ Sep 6 2012, 09:00 AM)
Then it was really a bad news~ Just pray for it, Taman Mas will have a good future~ smile.gif
*
Y bad news?