Welcome Guest ( Log In | Register )

52 Pages « < 34 35 36 37 38 > » Bottom

Outline · [ Standard ] · Linear+

> Ultimate LRT extension construction update thread!, Ara Damansara, USJ, Puchong!

views
     
jonc88
post Oct 7 2013, 11:52 PM

New Member
*
Newbie
0 posts

Joined: Oct 2012


Thanks for the photos guys..! I'll be in KL next Monday, so hopefully I can add some of my own too.. smile.gif
TSKampung2005
post Oct 8 2013, 10:30 PM

Proudly Kampungite, will always be one.
Group Icon
VIP
3,028 posts

Joined: Feb 2005
From: 梅田,大阪 //Sabah
Photos by sapphire blue (8/10/2013) of SSC Malaysia

Persiaran jengka

user posted image

Uploaded with ImageShack.us

user posted image

Uploaded with ImageShack.us

user posted image

Uploaded with ImageShack.us

user posted image

Uploaded with ImageShack.us

user posted image

Uploaded with ImageShack.us
cnvery
post Oct 9 2013, 01:49 AM

Regular
******
Senior Member
1,831 posts

Joined: Dec 2009

+1
jonc88
post Oct 9 2013, 01:16 PM

New Member
*
Newbie
0 posts

Joined: Oct 2012


Nice.. Lots of progress there with the pillars up already..
TSKampung2005
post Oct 9 2013, 02:36 PM

Proudly Kampungite, will always be one.
Group Icon
VIP
3,028 posts

Joined: Feb 2005
From: 梅田,大阪 //Sabah
QUOTE(jonc88 @ Oct 9 2013, 01:16 PM)
Nice.. Lots of progress there with the pillars up already..
*
The road between Empire and Subang Parade also has been closed for LRT construction, so it is good.
TSKampung2005
post Oct 12 2013, 09:27 AM

Proudly Kampungite, will always be one.
Group Icon
VIP
3,028 posts

Joined: Feb 2005
From: 梅田,大阪 //Sabah
Kinrara

12/10/2013

user posted image

user posted image

user posted image

user posted image

user posted image

user posted image

user posted image

user posted image

user posted image
Neo|ofGeo
post Oct 12 2013, 09:37 AM

Stop Complaining and Read
Group Icon
Elite
3,142 posts

Joined: Nov 2010


QUOTE(Kampung2005 @ Oct 12 2013, 09:27 AM)
Kinrara

12/10/2013

user posted image

user posted image

user posted image

user posted image

user posted image

user posted image

user posted image

user posted image

user posted image
*
Ah...i hope they finish it as soon as possible
== going out in the morning is being something like a test of endurance with the road getting smaller and smaller while still be double lane.

TSKampung2005
post Oct 12 2013, 09:41 AM

Proudly Kampungite, will always be one.
Group Icon
VIP
3,028 posts

Joined: Feb 2005
From: 梅田,大阪 //Sabah
QUOTE(Neo|ofGeo @ Oct 12 2013, 09:37 AM)
Ah...i hope they finish it as soon as possible
==  going out in the morning is being something like a test of endurance with the road getting smaller and smaller while still be double lane.
*
Depends. As far as I know, Ampang line got one hiccup due to reluctance of a school to allow construction workers to enter its compound for construction.
Neo|ofGeo
post Oct 12 2013, 09:42 AM

Stop Complaining and Read
Group Icon
Elite
3,142 posts

Joined: Nov 2010


QUOTE(Kampung2005 @ Oct 12 2013, 09:41 AM)
Depends. As far as I know, Ampang line got one hiccup due to reluctance of a school to allow construction workers to enter its compound for construction.
*
i was referring to the Kinrara site as i live around,
still having restriction eh?
last time was another school?
TSKampung2005
post Oct 12 2013, 09:46 AM

Proudly Kampungite, will always be one.
Group Icon
VIP
3,028 posts

Joined: Feb 2005
From: 梅田,大阪 //Sabah
QUOTE(Neo|ofGeo @ Oct 12 2013, 09:42 AM)
i was referring to the Kinrara site as i live around,
still having  restriction eh?
last time was another school?
*
That issue is in Puchong.

Kinrara section is progressing well as far as I can see smile.gif
TSKampung2005
post Oct 16 2013, 11:53 AM

Proudly Kampungite, will always be one.
Group Icon
VIP
3,028 posts

Joined: Feb 2005
From: 梅田,大阪 //Sabah
15/10/2013

Flyover between Federal Highway and Jln Lapangan Terbang Subang

user posted image

USJ area (Persiaran Kewajipan)

user posted image

user posted image

user posted image

user posted image

user posted image


jonc88
post Oct 17 2013, 01:46 AM

New Member
*
Newbie
0 posts

Joined: Oct 2012


OK, here's my contribution though it is not a lot..

Pre-extension

user posted image
https://scontent-b-lhr.xx.fbcdn.net/hphotos...827410472_n.jpg

Before the commencement of extension works, it is a simple set up where the tracks lead into the depot (called Reception Tracks [RT]).. The old Kelana Jaya Line had a portion of the viaduct flared, probably in anticipation of an eventual extension (which in this case really did happen, albeit 15 or so years later)..

Works to be done

user posted image
https://scontent-a-lhr.xx.fbcdn.net/hphotos...147916158_n.jpg

Here, you can see the intended set up.. The original RT tracks are where they are.. But the ones going towards Gombak will probably be removed and replaced by the orange line, the new outbound RT track.. Once this viaduct is up and connected, they can begin track work on the mainline represented by red as the turn out works (cross over) can be installed on the inbound RT track (for trains going to depot).. They will need to keep 1 RT track open at any single time to supply trains to the main line for daily operations.. In my experience in Singapore, with proper preparation, a turn out can be installed within 48 hours..

Now on to pictures..!

user posted image
https://scontent-b-lhr.xx.fbcdn.net/hphotos...752990850_n.jpg

Here you can see the extension of the existing flared viaduct before crossing the NKVE into the depot..

user posted image
https://scontent-b-lhr.xx.fbcdn.net/hphotos...514490820_n.jpg

A close up showing the immediate extension..

user posted image
https://scontent-a-lhr.xx.fbcdn.net/hphotos..._44215485_n.jpg

user posted image
https://scontent-a-lhr.xx.fbcdn.net/hphotos...605283566_n.jpg

Demolition of the existing parapet at the interface point is underway..

user posted image
https://fbcdn-sphotos-e-a.akamaihd.net/hpho...859244486_n.jpg

This is where the outbound RT track will connect with the extension main line.. And subsequently merge to the existing track towards Kelana Jaya..
jonc88
post Oct 17 2013, 01:51 AM

New Member
*
Newbie
0 posts

Joined: Oct 2012


Con't

user posted image
https://scontent-b-lhr.xx.fbcdn.net/hphotos...543309547_n.jpg

Here you can see that they have done up most of the main line viaduct leading across NKVE.. Next to it is a pier for the outbound reception track that is being built..

user posted image
https://scontent-a-lhr.xx.fbcdn.net/hphotos...268088828_n.jpg

A view of the extension turn out..

user posted image
https://scontent-a-lhr.xx.fbcdn.net/hphotos...580936996_n.jpg

1 more SBG to go before full completion of the span across NKVE.. I know everybody is waiting for it.. But you'll have to go through round 2 for the new RT track before any hanging above the NKVE is over..

user posted image
https://scontent-a-lhr.xx.fbcdn.net/hphotos...262969132_n.jpg

Tracks going to Station 01..

user posted image
https://scontent-a-lhr.xx.fbcdn.net/hphotos...573399014_n.jpg

RT track pier on the Lembah Subang side of NKVE..

user posted image
https://scontent-b-lhr.xx.fbcdn.net/hphotos...358013395_n.jpg

New shed inside depot area..

user posted image
https://scontent-a-lhr.xx.fbcdn.net/hphotos..._47485934_n.jpg

Depot-side support structure for Station 01.. The concourse will deck over the existing RT track for sure..
jonc88
post Oct 17 2013, 01:57 AM

New Member
*
Newbie
0 posts

Joined: Oct 2012


Con't

user posted image
https://scontent-b-lhr.xx.fbcdn.net/hphotos...927582999_n.jpg

Current state of Station 01..

user posted image
https://scontent-a-lhr.xx.fbcdn.net/hphotos...222010686_n.jpg

Still on concourse slab..

user posted image
https://scontent-a-lhr.xx.fbcdn.net/hphotos...155142181_n.jpg

user posted image
https://scontent-b-lhr.xx.fbcdn.net/hphotos...107960927_n.jpg

Good to see that they are improving station access.. This entrance has 2 escalators and a set of stairs.. Also, an elevator to get up to concourse level..

user posted image
https://scontent-b-lhr.xx.fbcdn.net/hphotos...187857524_n.jpg

Turning to go over the depot.. In future, you will get really good views from there.. I will like this section because it goes up really high, I like those as you get good views..

user posted image
https://fbcdn-sphotos-g-a.akamaihd.net/hpho...750149753_n.jpg

One of the many portal frames in the depot area with a train going under it..

user posted image
https://scontent-a-lhr.xx.fbcdn.net/hphotos...140234668_n.jpg

Station 02 gantry is just over the first portal frame across the river.. Pretty slow going if you ask me.. Been here for ages..

user posted image
https://scontent-b-lhr.xx.fbcdn.net/hphotos...450124672_n.jpg

RT tracks from Station 02 still waiting for SBGs to be launched upon the piers.. The good thing is that RapidKL can send empty trains direct to Kelana Jaya station to ease crowding in future, without having to go through any of the extension stations picking up people and making it more crowded down line..
jonc88
post Oct 17 2013, 02:02 AM

New Member
*
Newbie
0 posts

Joined: Oct 2012


Con't

user posted image
https://scontent-a-lhr.xx.fbcdn.net/hphotos...851168615_n.jpg

Tail end of Station 02 launch gantry..

user posted image
https://scontent-a-lhr.xx.fbcdn.net/hphotos...021410820_n.jpg

Station 02 area..

user posted image
https://scontent-a-lhr.xx.fbcdn.net/hphotos...290276634_n.jpg

Viaduct towards Station 03.. Sorry, I didn't have time to go beyond this..

user posted image
https://scontent-b-lhr.xx.fbcdn.net/hphotos...110556427_n.jpg

Station 02 launch gantry..

user posted image
https://scontent-b-lhr.xx.fbcdn.net/hphotos...761754644_n.jpg

Existing RT.. The left lane should be removed in future.. This will allow the trains to turn out to the extension track further up before it comes down this slope..

user posted image
https://fbcdn-sphotos-e-a.akamaihd.net/hpho...498439674_n.jpg

Structure of Station 01 where concourse slab will go over existing RT is visible..

user posted image
https://scontent-a-lhr.xx.fbcdn.net/hphotos...207722769_n.jpg

Like a modern day Stonehenge... I think its really cool..

user posted image
https://scontent-a-lhr.xx.fbcdn.net/hphotos...384529120_n.jpg

New RT pier before the NKVE..

That wraps it up folks..! Till my next trip to KL, which I hopefully can cover more stuff..
jonc88
post Oct 17 2013, 11:12 PM

New Member
*
Newbie
0 posts

Joined: Oct 2012


Ampang Line extension

user posted image
https://fbcdn-sphotos-e-a.akamaihd.net/hpho...360126593_n.jpg

user posted image
https://fbcdn-sphotos-c-a.akamaihd.net/hpho...035934351_n.jpg

user posted image
https://fbcdn-sphotos-b-a.akamaihd.net/hpho...547077776_n.jpg

user posted image
https://fbcdn-sphotos-h-a.akamaihd.net/hpho...296782915_n.jpg

This is at IOI Puchong
SUSvuetnam
post Oct 17 2013, 11:16 PM

Regular
******
Senior Member
1,259 posts

Joined: May 2012
From: Kaoshiung, Taiwan and Kuala Lumpur


QUOTE(jonc88 @ Oct 17 2013, 11:12 PM)
how the long lorry use highway? like transfer from one depot to another?

HuorEarfalas
post Oct 17 2013, 11:23 PM

Casual
***
Junior Member
382 posts

Joined: Sep 2006


QUOTE(jonc88 @ Oct 18 2013, 12:12 AM)
Holy hell... how did they even transport that slab.... it's long shocking.gif shocking.gif
jonc88
post Oct 17 2013, 11:27 PM

New Member
*
Newbie
0 posts

Joined: Oct 2012


Con't

user posted image
https://fbcdn-sphotos-b-a.akamaihd.net/hpho...002042181_n.jpg

user posted image
https://fbcdn-sphotos-h-a.akamaihd.net/hpho...182890681_n.jpg

user posted image
https://fbcdn-sphotos-f-a.akamaihd.net/hpho...110892022_n.jpg

user posted image
https://fbcdn-sphotos-d-a.akamaihd.net/hpho...963338306_n.jpg

user posted image
https://fbcdn-sphotos-g-a.akamaihd.net/hpho...228116744_n.jpg

user posted image
https://fbcdn-sphotos-a-a.akamaihd.net/hpho...475161728_n.jpg

user posted image
https://fbcdn-sphotos-b-a.akamaihd.net/hpho...61_367516_n.jpg

user posted image
https://fbcdn-sphotos-h-a.akamaihd.net/hpho...413986485_n.jpg

This is at Bandar Kinrara 4 in July
SUSvuetnam
post Oct 18 2013, 02:30 AM

Regular
******
Senior Member
1,259 posts

Joined: May 2012
From: Kaoshiung, Taiwan and Kuala Lumpur


QUOTE(HuorEarfalas @ Oct 17 2013, 11:23 PM)
Holy hell... how did they even transport that slab.... it's long  shocking.gif  shocking.gif
*
Kampung2005 please help explain

52 Pages « < 34 35 36 37 38 > » 
Bump Topic Add ReplyOptions New Topic
 

Change to:
| Lo-Fi Version
0.0286sec    1.34    6 queries    GZIP Disabled
Time is now: 24th December 2025 - 06:31 PM