Ultimate LRT extension construction update thread!, Ara Damansara, USJ, Puchong!
Ultimate LRT extension construction update thread!, Ara Damansara, USJ, Puchong!
|
|
Oct 7 2013, 11:52 PM
|
![]()
Newbie
0 posts Joined: Oct 2012 |
Thanks for the photos guys..! I'll be in KL next Monday, so hopefully I can add some of my own too..
|
|
|
Oct 8 2013, 10:30 PM
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
Photos by sapphire blue (8/10/2013) of SSC Malaysia
Persiaran jengka ![]() Uploaded with ImageShack.us ![]() Uploaded with ImageShack.us ![]() Uploaded with ImageShack.us ![]() Uploaded with ImageShack.us ![]() Uploaded with ImageShack.us |
|
|
Oct 9 2013, 01:49 AM
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,831 posts Joined: Dec 2009 |
+1
|
|
|
Oct 9 2013, 01:16 PM
|
![]()
Newbie
0 posts Joined: Oct 2012 |
Nice.. Lots of progress there with the pillars up already..
|
|
|
Oct 9 2013, 02:36 PM
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
|
|
|
Oct 12 2013, 09:27 AM
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
Kinrara
12/10/2013 ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
|
|
Oct 12 2013, 09:37 AM
|
|
Elite
3,142 posts Joined: Nov 2010 |
|
|
|
Oct 12 2013, 09:41 AM
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
QUOTE(Neo|ofGeo @ Oct 12 2013, 09:37 AM) Ah...i hope they finish it as soon as possible Depends. As far as I know, Ampang line got one hiccup due to reluctance of a school to allow construction workers to enter its compound for construction.== going out in the morning is being something like a test of endurance with the road getting smaller and smaller while still be double lane. |
|
|
Oct 12 2013, 09:42 AM
|
|
Elite
3,142 posts Joined: Nov 2010 |
QUOTE(Kampung2005 @ Oct 12 2013, 09:41 AM) Depends. As far as I know, Ampang line got one hiccup due to reluctance of a school to allow construction workers to enter its compound for construction. i was referring to the Kinrara site as i live around,still having restriction eh? last time was another school? |
|
|
Oct 12 2013, 09:46 AM
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
|
|
|
Oct 16 2013, 11:53 AM
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
15/10/2013
Flyover between Federal Highway and Jln Lapangan Terbang Subang ![]() USJ area (Persiaran Kewajipan) ![]() ![]() ![]() ![]() ![]() |
|
|
Oct 17 2013, 01:46 AM
|
![]()
Newbie
0 posts Joined: Oct 2012 |
OK, here's my contribution though it is not a lot..
Pre-extension ![]() https://scontent-b-lhr.xx.fbcdn.net/hphotos...827410472_n.jpg Before the commencement of extension works, it is a simple set up where the tracks lead into the depot (called Reception Tracks [RT]).. The old Kelana Jaya Line had a portion of the viaduct flared, probably in anticipation of an eventual extension (which in this case really did happen, albeit 15 or so years later).. Works to be done ![]() https://scontent-a-lhr.xx.fbcdn.net/hphotos...147916158_n.jpg Here, you can see the intended set up.. The original RT tracks are where they are.. But the ones going towards Gombak will probably be removed and replaced by the orange line, the new outbound RT track.. Once this viaduct is up and connected, they can begin track work on the mainline represented by red as the turn out works (cross over) can be installed on the inbound RT track (for trains going to depot).. They will need to keep 1 RT track open at any single time to supply trains to the main line for daily operations.. In my experience in Singapore, with proper preparation, a turn out can be installed within 48 hours.. Now on to pictures..! ![]() https://scontent-b-lhr.xx.fbcdn.net/hphotos...752990850_n.jpg Here you can see the extension of the existing flared viaduct before crossing the NKVE into the depot.. ![]() https://scontent-b-lhr.xx.fbcdn.net/hphotos...514490820_n.jpg A close up showing the immediate extension.. ![]() https://scontent-a-lhr.xx.fbcdn.net/hphotos..._44215485_n.jpg ![]() https://scontent-a-lhr.xx.fbcdn.net/hphotos...605283566_n.jpg Demolition of the existing parapet at the interface point is underway.. ![]() https://fbcdn-sphotos-e-a.akamaihd.net/hpho...859244486_n.jpg This is where the outbound RT track will connect with the extension main line.. And subsequently merge to the existing track towards Kelana Jaya.. |
|
|
Oct 17 2013, 01:51 AM
|
![]()
Newbie
0 posts Joined: Oct 2012 |
Con't
![]() https://scontent-b-lhr.xx.fbcdn.net/hphotos...543309547_n.jpg Here you can see that they have done up most of the main line viaduct leading across NKVE.. Next to it is a pier for the outbound reception track that is being built.. ![]() https://scontent-a-lhr.xx.fbcdn.net/hphotos...268088828_n.jpg A view of the extension turn out.. ![]() https://scontent-a-lhr.xx.fbcdn.net/hphotos...580936996_n.jpg 1 more SBG to go before full completion of the span across NKVE.. I know everybody is waiting for it.. But you'll have to go through round 2 for the new RT track before any hanging above the NKVE is over.. ![]() https://scontent-a-lhr.xx.fbcdn.net/hphotos...262969132_n.jpg Tracks going to Station 01.. ![]() https://scontent-a-lhr.xx.fbcdn.net/hphotos...573399014_n.jpg RT track pier on the Lembah Subang side of NKVE.. ![]() https://scontent-b-lhr.xx.fbcdn.net/hphotos...358013395_n.jpg New shed inside depot area.. ![]() https://scontent-a-lhr.xx.fbcdn.net/hphotos..._47485934_n.jpg Depot-side support structure for Station 01.. The concourse will deck over the existing RT track for sure.. |
|
|
Oct 17 2013, 01:57 AM
|
![]()
Newbie
0 posts Joined: Oct 2012 |
Con't
![]() https://scontent-b-lhr.xx.fbcdn.net/hphotos...927582999_n.jpg Current state of Station 01.. ![]() https://scontent-a-lhr.xx.fbcdn.net/hphotos...222010686_n.jpg Still on concourse slab.. ![]() https://scontent-a-lhr.xx.fbcdn.net/hphotos...155142181_n.jpg ![]() https://scontent-b-lhr.xx.fbcdn.net/hphotos...107960927_n.jpg Good to see that they are improving station access.. This entrance has 2 escalators and a set of stairs.. Also, an elevator to get up to concourse level.. ![]() https://scontent-b-lhr.xx.fbcdn.net/hphotos...187857524_n.jpg Turning to go over the depot.. In future, you will get really good views from there.. I will like this section because it goes up really high, I like those as you get good views.. ![]() https://fbcdn-sphotos-g-a.akamaihd.net/hpho...750149753_n.jpg One of the many portal frames in the depot area with a train going under it.. ![]() https://scontent-a-lhr.xx.fbcdn.net/hphotos...140234668_n.jpg Station 02 gantry is just over the first portal frame across the river.. Pretty slow going if you ask me.. Been here for ages.. ![]() https://scontent-b-lhr.xx.fbcdn.net/hphotos...450124672_n.jpg RT tracks from Station 02 still waiting for SBGs to be launched upon the piers.. The good thing is that RapidKL can send empty trains direct to Kelana Jaya station to ease crowding in future, without having to go through any of the extension stations picking up people and making it more crowded down line.. |
|
|
Oct 17 2013, 02:02 AM
|
![]()
Newbie
0 posts Joined: Oct 2012 |
Con't
![]() https://scontent-a-lhr.xx.fbcdn.net/hphotos...851168615_n.jpg Tail end of Station 02 launch gantry.. ![]() https://scontent-a-lhr.xx.fbcdn.net/hphotos...021410820_n.jpg Station 02 area.. ![]() https://scontent-a-lhr.xx.fbcdn.net/hphotos...290276634_n.jpg Viaduct towards Station 03.. Sorry, I didn't have time to go beyond this.. ![]() https://scontent-b-lhr.xx.fbcdn.net/hphotos...110556427_n.jpg Station 02 launch gantry.. ![]() https://scontent-b-lhr.xx.fbcdn.net/hphotos...761754644_n.jpg Existing RT.. The left lane should be removed in future.. This will allow the trains to turn out to the extension track further up before it comes down this slope.. ![]() https://fbcdn-sphotos-e-a.akamaihd.net/hpho...498439674_n.jpg Structure of Station 01 where concourse slab will go over existing RT is visible.. ![]() https://scontent-a-lhr.xx.fbcdn.net/hphotos...207722769_n.jpg Like a modern day Stonehenge... I think its really cool.. ![]() https://scontent-a-lhr.xx.fbcdn.net/hphotos...384529120_n.jpg New RT pier before the NKVE.. That wraps it up folks..! Till my next trip to KL, which I hopefully can cover more stuff.. |
|
|
Oct 17 2013, 11:12 PM
|
![]()
Newbie
0 posts Joined: Oct 2012 |
|
|
|
Oct 17 2013, 11:16 PM
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,259 posts Joined: May 2012 From: Kaoshiung, Taiwan and Kuala Lumpur |
QUOTE(jonc88 @ Oct 17 2013, 11:12 PM) Ampang Line extension how the long lorry use highway? like transfer from one depot to another?![]() https://fbcdn-sphotos-e-a.akamaihd.net/hpho...360126593_n.jpg ![]() https://fbcdn-sphotos-c-a.akamaihd.net/hpho...035934351_n.jpg ![]() https://fbcdn-sphotos-b-a.akamaihd.net/hpho...547077776_n.jpg ![]() https://fbcdn-sphotos-h-a.akamaihd.net/hpho...296782915_n.jpg This is at IOI Puchong |
|
|
Oct 17 2013, 11:23 PM
|
![]() ![]() ![]()
Junior Member
382 posts Joined: Sep 2006 |
QUOTE(jonc88 @ Oct 18 2013, 12:12 AM) Ampang Line extension Holy hell... how did they even transport that slab.... it's long ![]() https://fbcdn-sphotos-e-a.akamaihd.net/hpho...360126593_n.jpg ![]() https://fbcdn-sphotos-c-a.akamaihd.net/hpho...035934351_n.jpg ![]() https://fbcdn-sphotos-b-a.akamaihd.net/hpho...547077776_n.jpg ![]() https://fbcdn-sphotos-h-a.akamaihd.net/hpho...296782915_n.jpg This is at IOI Puchong |
|
|
Oct 18 2013, 02:30 AM
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,259 posts Joined: May 2012 From: Kaoshiung, Taiwan and Kuala Lumpur |
|