Q1 : Zefer is built beside the slope. What is the degree of slope where Zefer will be built on?
A1. The overall slope gradients is less than 25 degree.
Q2 : Is there any regular maintenance on the slope and what are the regular maintenance to be performed? How often will that be?
A2 : There are various monitoring instrumentation for the project which, during and post construction. Piezometer standpipes and inclinometer will be installed to monitor any movement in ground during construction.
Monitoring after project completed will be carried on 3-4 times a year.
Q3 : What type of structures will be built to prevent slope failure? What are the safety precaution taken by the developer to prevent slope failure?
A3 : The foundation will be bored pile structures which, boring will be until hard layer of earth. Safety precaution are as explained in Item 2 above. If the Purchaser noticed, most of the building will be on flat ground.
Q4 : Has any independent body checked on the slope?
A4 : IKRAM is the approving authority for our proposed foundation structures.
Q5 : Any action to be taken by the developer to built alternative road to Zefer or widen the road as there is only 1 road in/out for all the condominium over there.
A5 : There are upgrading of existing roads only, to include create free-flow going-out traffic lane from zefer to jln bandar puchong jaya, and signalised junction.
[/quote]
1. I seriously doubt answer no 1;
2. We need to confirm if answer to no 2, 3 and 4 consist of all the measures to be taken in accordance to the regulations set by the authorities with regards to hill slope condominium projects;
(Hope someone can provide insight if there is any change in the regulations after the Bkt Antarabangsa tragedy?)
3. Further on answer no 2 above, would the said 3-4 times a year checking be done during the first year after completion or will this be an ongoing thing. I say this because this would require extra costs and who will bear this cost after VP is given to the buyers?
4. As to no 5, other than tarring the road, I doubt the road leading to Zefer can be widen given the narrow access between Villamas Apartment and the 'sport complex' (badminton courts).