Welcome Guest ( Log In | Register )

108 Pages « < 16 17 18 19 20 > » Bottom

Outline · [ Standard ] · Linear+

 Amara Service Residence V2, by Jaya Megah

views
     
shyhhua
post Dec 19 2011, 10:04 AM

Getting Started
**
Junior Member
265 posts

Joined: Apr 2008


QUOTE(WLP3234 @ Dec 16 2011, 01:51 PM)
your SnP come with DOC rite? may ask what was the date stamped?
*
what is DOC? hehe tongue.gif
the agreement date written there is 17 Aug 2011. how about other buyers??
tsfatt00
post Dec 22 2011, 11:33 AM

New Member
*
Junior Member
28 posts

Joined: Sep 2009


anyone knows about the maintenace fee p.s.f?
jcl86
post Dec 22 2011, 07:19 PM

Getting Started
**
Junior Member
106 posts

Joined: Jul 2011
QUOTE(tsfatt00 @ Dec 22 2011, 11:33 AM)
anyone knows about the maintenace fee p.s.f?
*
u also bought an unit here?
T.gadget
post Dec 23 2011, 08:37 AM

New Member
*
Junior Member
38 posts

Joined: Dec 2011


who know the progress??
tsfatt00
post Dec 23 2011, 03:47 PM

New Member
*
Junior Member
28 posts

Joined: Sep 2009


QUOTE(jcl86 @ Dec 22 2011, 07:19 PM)
u also bought an unit here?
*
i got 1 unit at D block but forgot to ask about the maintenance fee
adrian0229
post Dec 23 2011, 05:14 PM

Look at all my stars!!
*******
Senior Member
3,913 posts

Joined: Nov 2004
progress at 3 Dec


Attached thumbnail(s)
Attached Image
jcl86
post Dec 23 2011, 07:09 PM

Getting Started
**
Junior Member
106 posts

Joined: Jul 2011
QUOTE(tsfatt00 @ Dec 23 2011, 03:47 PM)
i got 1 unit at D block but forgot to ask about the maintenance fee
*
ohmy.gif is RM0.18 per sqf... u buy for own stay?
0106127
post Dec 23 2011, 09:13 PM

Enthusiast
*****
Senior Member
864 posts

Joined: Apr 2006
QUOTE(adrian0229 @ Dec 23 2011, 05:14 PM)
progress at 3 Dec
*
they are nt using spun piles. these square piles not so strong
T.gadget
post Dec 24 2011, 08:46 AM

New Member
*
Junior Member
38 posts

Joined: Dec 2011


haiz......i dunno when can get my ipad 3...^^
jcl86
post Dec 26 2011, 10:38 AM

Getting Started
**
Junior Member
106 posts

Joined: Jul 2011
I think we all got wrong info on the site progress... refer to the Wikimapia (Link attached in the first post #1), block A is just beside the show room.. and current progress piling job believe was in block B and block C if not mistaken... do you agree?
T.gadget
post Dec 26 2011, 11:50 AM

New Member
*
Junior Member
38 posts

Joined: Dec 2011


Wah..... If u r correct. That mean progress very slow lo......
0106127
post Dec 26 2011, 03:17 PM

Enthusiast
*****
Senior Member
864 posts

Joined: Apr 2006
QUOTE(jcl86 @ Dec 26 2011, 10:38 AM)
I think we all got wrong info on the site progress... refer to the Wikimapia (Link attached in the first post #1), block A is just beside the show room.. and current progress piling job believe was in block B and block C if not mistaken... do you agree?
*
wei.. i thought the showroom land is KTM land they just rent to build the showroom. not the actual block a la.
??????
jcl86
post Dec 26 2011, 08:42 PM

Getting Started
**
Junior Member
106 posts

Joined: Jul 2011
I hope dat I was wrong.. referring to S/P, d coverage site by developer is true... hope dat wikimapia nt correct
aru843
post Dec 26 2011, 09:57 PM

New Member
*
Junior Member
43 posts

Joined: May 2011
QUOTE(jcl86 @ Dec 26 2011, 08:42 PM)
I hope dat I was wrong.. referring to S/P, d coverage site by developer is true... hope dat wikimapia nt correct
*
Where got block A is at showroom...block A,B,C and D are infront of the cement plant la..

cutealex
post Dec 26 2011, 11:39 PM

Buy Lands,Properties& Precious Metals..
*******
Senior Member
4,790 posts

Joined: Dec 2008
smile.gif 1 smile face for this..
mousepad87
post Dec 27 2011, 09:06 AM

***
******
Senior Member
1,008 posts

Joined: Nov 2007
From: Gombak,serdang



QUOTE(0106127 @ Dec 23 2011, 09:13 PM)
they are nt using spun piles. these square piles not so strong
*
this are r.c piles. capacity not only depends on what type of piles, but also depends very much on size & numbers.
anyway I notice block D and some part of block C using Bored Piles. hope the engineers doing good job there rolleyes.gif

This post has been edited by mousepad87: Dec 27 2011, 01:53 PM
tsfatt00
post Dec 27 2011, 12:56 PM

New Member
*
Junior Member
28 posts

Joined: Sep 2009


QUOTE(jcl86 @ Dec 23 2011, 07:09 PM)
ohmy.gif  is RM0.18 per sqf... u buy for own stay?
*
for investment, is this mentioned in SNP?
The pilling process normally will take longer time, i think at least half a yr.
The base must b strong and they hv to plant enough pilllars, so not to be surprised the process is slow
mrPOTATO
post Dec 27 2011, 01:12 PM

Look at all my stars!!
*******
Senior Member
2,113 posts

Joined: Dec 2008


For limestone, they insert a few piles before capping it, so even though spun piles are stronger, the rc piles foundation is sturdier, something like u stand on 1 spun pile leg vs standing on 4 rc pile legs .. if i'm not wrong.
mousepad87
post Dec 27 2011, 02:40 PM

***
******
Senior Member
1,008 posts

Joined: Nov 2007
From: Gombak,serdang



QUOTE(mrPOTATO @ Dec 27 2011, 01:12 PM)
For limestone, they insert a few piles before capping it, so even though spun piles are stronger, the rc piles foundation is sturdier, something like u stand on 1 spun pile leg vs standing on 4 rc pile legs .. if i'm not wrong.
*
But we can capping spun piles also rite? (out of topic, just my curiosity biggrin.gif )
mrPOTATO
post Dec 27 2011, 03:17 PM

Look at all my stars!!
*******
Senior Member
2,113 posts

Joined: Dec 2008


QUOTE(mousepad87 @ Dec 27 2011, 02:40 PM)
But we can capping spun piles also rite? (out of topic,  just my curiosity biggrin.gif )
*
1st wanna clarify i not engineer, so its open to correction.
Limestone areas got cavities/floating stones/stone valleys etc to if just taruh 1 spun pile, it might not sit correctly in the abnormalities mentioned. Thats why have to taruh a few piles to 'diversify' smile.gif like diversify in financing. The strength of spun piles is higher, but when more rc piles is combined, it migh be stronger collectively like the saying breaking 1 chopstick vs a few chopsticks. Also the absolute max strength of spun pile is higher eg can take xxx tons load but mayb no need to use so high loading as only www tons is loaded on the foundation, it will be overdesigned.

108 Pages « < 16 17 18 19 20 > » Top
 

Change to:
| Lo-Fi Version
0.0204sec    0.64    6 queries    GZIP Disabled
Time is now: 18th December 2025 - 07:59 AM