QUOTE(WLP3234 @ Dec 16 2011, 01:51 PM)
what is DOC? hehe the agreement date written there is 17 Aug 2011. how about other buyers??
Amara Service Residence V2, by Jaya Megah
|
|
Dec 19 2011, 10:04 AM
|
![]() ![]()
Junior Member
265 posts Joined: Apr 2008 |
|
|
|
|
|
|
Dec 22 2011, 11:33 AM
|
![]()
Junior Member
28 posts Joined: Sep 2009 |
anyone knows about the maintenace fee p.s.f?
|
|
|
Dec 22 2011, 07:19 PM
|
![]() ![]()
Junior Member
106 posts Joined: Jul 2011 |
|
|
|
Dec 23 2011, 08:37 AM
|
![]()
Junior Member
38 posts Joined: Dec 2011 |
who know the progress??
|
|
|
Dec 23 2011, 03:47 PM
|
![]()
Junior Member
28 posts Joined: Sep 2009 |
|
|
|
Dec 23 2011, 05:14 PM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
3,913 posts Joined: Nov 2004 |
|
|
|
|
|
|
Dec 23 2011, 07:09 PM
|
![]() ![]()
Junior Member
106 posts Joined: Jul 2011 |
|
|
|
Dec 23 2011, 09:13 PM
|
![]() ![]() ![]() ![]() ![]()
Senior Member
864 posts Joined: Apr 2006 |
|
|
|
Dec 24 2011, 08:46 AM
|
![]()
Junior Member
38 posts Joined: Dec 2011 |
haiz......i dunno when can get my ipad 3...^^
|
|
|
Dec 26 2011, 10:38 AM
|
![]() ![]()
Junior Member
106 posts Joined: Jul 2011 |
I think we all got wrong info on the site progress... refer to the Wikimapia (Link attached in the first post #1), block A is just beside the show room.. and current progress piling job believe was in block B and block C if not mistaken... do you agree?
|
|
|
Dec 26 2011, 11:50 AM
|
![]()
Junior Member
38 posts Joined: Dec 2011 |
Wah..... If u r correct. That mean progress very slow lo......
|
|
|
Dec 26 2011, 03:17 PM
|
![]() ![]() ![]() ![]() ![]()
Senior Member
864 posts Joined: Apr 2006 |
QUOTE(jcl86 @ Dec 26 2011, 10:38 AM) I think we all got wrong info on the site progress... refer to the Wikimapia (Link attached in the first post #1), block A is just beside the show room.. and current progress piling job believe was in block B and block C if not mistaken... do you agree? wei.. i thought the showroom land is KTM land they just rent to build the showroom. not the actual block a la.?????? |
|
|
Dec 26 2011, 08:42 PM
|
![]() ![]()
Junior Member
106 posts Joined: Jul 2011 |
I hope dat I was wrong.. referring to S/P, d coverage site by developer is true... hope dat wikimapia nt correct
|
|
|
|
|
|
Dec 26 2011, 09:57 PM
|
![]()
Junior Member
43 posts Joined: May 2011 |
|
|
|
Dec 26 2011, 11:39 PM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
4,790 posts Joined: Dec 2008 |
|
|
|
Dec 27 2011, 09:06 AM
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,008 posts Joined: Nov 2007 From: Gombak,serdang |
QUOTE(0106127 @ Dec 23 2011, 09:13 PM) this are r.c piles. capacity not only depends on what type of piles, but also depends very much on size & numbers. anyway I notice block D and some part of block C using Bored Piles. hope the engineers doing good job there This post has been edited by mousepad87: Dec 27 2011, 01:53 PM |
|
|
Dec 27 2011, 12:56 PM
|
![]()
Junior Member
28 posts Joined: Sep 2009 |
QUOTE(jcl86 @ Dec 23 2011, 07:09 PM) for investment, is this mentioned in SNP?The pilling process normally will take longer time, i think at least half a yr. The base must b strong and they hv to plant enough pilllars, so not to be surprised the process is slow |
|
|
Dec 27 2011, 01:12 PM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
2,113 posts Joined: Dec 2008 |
For limestone, they insert a few piles before capping it, so even though spun piles are stronger, the rc piles foundation is sturdier, something like u stand on 1 spun pile leg vs standing on 4 rc pile legs .. if i'm not wrong.
|
|
|
Dec 27 2011, 02:40 PM
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,008 posts Joined: Nov 2007 From: Gombak,serdang |
QUOTE(mrPOTATO @ Dec 27 2011, 01:12 PM) For limestone, they insert a few piles before capping it, so even though spun piles are stronger, the rc piles foundation is sturdier, something like u stand on 1 spun pile leg vs standing on 4 rc pile legs .. if i'm not wrong. But we can capping spun piles also rite? (out of topic, just my curiosity |
|
|
Dec 27 2011, 03:17 PM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
2,113 posts Joined: Dec 2008 |
QUOTE(mousepad87 @ Dec 27 2011, 02:40 PM) 1st wanna clarify i not engineer, so its open to correction.Limestone areas got cavities/floating stones/stone valleys etc to if just taruh 1 spun pile, it might not sit correctly in the abnormalities mentioned. Thats why have to taruh a few piles to 'diversify' |
| Change to: | 0.0204sec
0.64
6 queries
GZIP Disabled
Time is now: 18th December 2025 - 07:59 AM |