Amara Service Residence V2, by Jaya Megah
|
mrPOTATO
|
Aug 2 2011, 10:25 AM
|
|
QUOTE(kochin @ Aug 2 2011, 08:46 AM) hhmmmm.... if only amara can do something like a air-conditioned covered walkway leading all the way to the railway station + a fully covered and air-conditioned bus-stop ala the zest. it will be way.......... cool. anybody got jalan to write petition to jaya megah using trinity's the zest article or not? hehe  am sure amara value will easily jump additional 10% then. Boss, i second yr proposal. But very hard to find their email, tel fax got .. http://thinkproperty.com.my/realestate/Jay...t-Sdn-Bhd54329/..duno if this is a 'community developer' or not. TT updated their website, very proud of their 'building communities' culture.
|
|
|
|
|
|
mrPOTATO
|
Aug 6 2011, 01:53 PM
|
|
Hi, anyone been to the site recently ? Have they started foundation works yet ?
|
|
|
|
|
|
mrPOTATO
|
Sep 9 2011, 11:27 AM
|
|
QUOTE(Ledy Gigi @ Sep 8 2011, 04:42 PM) when can get our ipad2..long time have to wait..whats the lattest site progress now???anyone knows?? Nothing done, just empty land Why lawyer never call me collect spa/offer letter bank/loan agreeement etc ... ? Farni lawyer..
|
|
|
|
|
|
mrPOTATO
|
Sep 26 2011, 10:29 PM
|
|
i no scare of anything.. earthquake ka.. ekonomy turtle la, slow response la, watever .. as long as they do their foundation properly .. This post has been edited by mrPOTATO: Sep 26 2011, 10:35 PM
|
|
|
|
|
|
mrPOTATO
|
Oct 12 2011, 12:41 AM
|
|
U all referring to those square piles lying on the ground ? Those are for supporting the beams of the foundation ie secondary role. The most important piles are those big round ones (called spun piles), these support the main structure ie column of building. Maybe if got construction fellas here can explain more ..
|
|
|
|
|
|
mrPOTATO
|
Oct 14 2011, 05:11 PM
|
|
Something found on the net, for general knowledge .. http://www.gnpgeo.com.my/download/publicat...%20Malaysia.pdf It looks like building in limestone area needs experienced workers & more skills than just hammering the pile in. Anyway, with another high-rise already in progress in the same area i don't feel so worried. Last time looked around the the multi-storey low cost apartment beside & don't have any cracks ahaha..
|
|
|
|
|
|
mrPOTATO
|
Nov 8 2011, 11:48 PM
|
|
QUOTE(jcl86 @ Nov 8 2011, 11:21 PM) Latest progress. Block A area Pilling job almost covered.Block B on d way.. Wah, thats a hi tech injection hydraulic piling machine ! It can sort of test the pile by using strong force to ascertain stability of piling, so better than normal hammer pile. Glad to know the developer started it right.
|
|
|
|
|
|
mrPOTATO
|
Nov 17 2011, 01:39 PM
|
|
QUOTE(bacabuku @ Nov 17 2011, 12:27 PM) RM376,000 1,012 + 173 (balcony) sq ft I got 10% bumi disc, 3 carparks, free legal n SPA So ok or not? hmmmm $353psf .. going up ..
|
|
|
|
|
|
mrPOTATO
|
Dec 11 2011, 08:08 PM
|
|
Same thing here, girl said other time only send over LA
|
|
|
|
|
|
mrPOTATO
|
Dec 17 2011, 08:04 PM
|
|
jcl36 very updated on site progress  I pass by so went in took a peek, the monster piling machine now at blkC or D area, las time was at A.. moving slow nvm, piling mus b proper .. When doing framework will be faster & can c from MRR2 next time  Added on December 17, 2011, 8:05 pmHmm.. stil got agents in the site opis. This post has been edited by mrPOTATO: Dec 17 2011, 08:05 PM
|
|
|
|
|
|
mrPOTATO
|
Dec 27 2011, 01:12 PM
|
|
For limestone, they insert a few piles before capping it, so even though spun piles are stronger, the rc piles foundation is sturdier, something like u stand on 1 spun pile leg vs standing on 4 rc pile legs .. if i'm not wrong.
|
|
|
|
|
|
mrPOTATO
|
Dec 27 2011, 03:17 PM
|
|
QUOTE(mousepad87 @ Dec 27 2011, 02:40 PM) But we can capping spun piles also rite? (out of topic, just my curiosity  ) 1st wanna clarify i not engineer, so its open to correction. Limestone areas got cavities/floating stones/stone valleys etc to if just taruh 1 spun pile, it might not sit correctly in the abnormalities mentioned. Thats why have to taruh a few piles to 'diversify'  like diversify in financing. The strength of spun piles is higher, but when more rc piles is combined, it migh be stronger collectively like the saying breaking 1 chopstick vs a few chopsticks. Also the absolute max strength of spun pile is higher eg can take xxx tons load but mayb no need to use so high loading as only www tons is loaded on the foundation, it will be overdesigned.
|
|
|
|
|
|
mrPOTATO
|
Dec 28 2011, 02:07 PM
|
|
QUOTE(jacob888 @ Dec 27 2011, 03:39 PM) mrPotato also bought amara ? Ya. Eh i see we bought at the same places I think all of us bored to death already waiting for the piling to finish haha.. talking about piling & rocks .. crazy liao  But honestly i think we shouldn't worry too much cos nearby got a few high rise condos already. Surprisingly, even the low cost flat beside amara got no crack compared to condos costing much more in kl got cracks. If engineers can build hotel on the sea, i think building on soil is supsupsui for them
|
|
|
|
|
|
mrPOTATO
|
Dec 29 2011, 12:38 AM
|
|
QUOTE(jacob888 @ Dec 28 2011, 03:01 PM) haha, hopefully this's our another success investment after the zest I worry i will want to move to amara 3 yrs from now if it is successful  I guess if we want to look hard enough, can c some similarities between tz & amara, developer & project wise. Trinity showed that it is very committed to proving itself & making a name for itself despite its short history & limited experience. I hope jayaMegah possess the same drive & determination .. Amara has an appealing concept, only left the implementation to be seen .. if the finished product reflects what they market in their brochure, the battle is more than 1/2 won ...
|
|
|
|
|
|
mrPOTATO
|
Jan 1 2012, 12:06 PM
|
|
QUOTE(cutealex @ Dec 31 2011, 12:51 AM) Then i stay beside u... i stay Semarak condo... lolz...  Sure mou .. i thought u prefer to stay beside her..
|
|
|
|
|
|
mrPOTATO
|
Jan 2 2012, 12:39 AM
|
|
QUOTE(0106127 @ Jan 1 2012, 11:32 PM) no. 70% LTV buyers will get ipad same as 90%LTV buyers. it is based on the 1st drawdown after initial 10% deposit If pay cash / take bank loan oso $$ mah, they should give ipad once 2nd billing come out. Else we should make noise with developer
|
|
|
|
|
|
mrPOTATO
|
Jan 19 2012, 10:14 AM
|
|
BEST AFFORDABLE RESIDENTIAL NEWCOMMER OF THE YEAR Winner: AMARA Service Residences, Batu Caves
|
|
|
|
|
|
mrPOTATO
|
Jan 19 2012, 04:10 PM
|
|
|
|
|
|
|
|
mrPOTATO
|
Jan 30 2012, 01:41 PM
|
|
QUOTE(deelaila @ Jan 30 2012, 10:24 AM) this amaya still got available unit? I also wondering cos when pass the sales office still see agents inside. Y not give them a call ? Added on January 30, 2012, 1:45 pmQUOTE(mousepad87 @ Jan 23 2012, 03:12 PM) What it mean by newcomer? Developer or first time buyer? How they define affordable ? Affordable means many many ppl can afford lo hahaa.. This post has been edited by mrPOTATO: Jan 30 2012, 01:45 PM
|
|
|
|
|
|
mrPOTATO
|
Feb 1 2012, 09:50 PM
|
|
QUOTE(mousepad87 @ Feb 1 2012, 11:44 AM) newcomer means buyer of this project r first time buyers or developer is newcomer?  Refers to project kua ..
|
|
|
|
|