 Amara Service Residence V2, by Jaya Megah

views
     
djneo
post Nov 23 2014, 09:36 AM

Getting Started
**
Junior Member
50 posts

Joined: Dec 2013


QUOTE(jcl86 @ Nov 19 2014, 04:19 PM)
Hi Oaks, i managed to went in too last week. For external wall, reli bad workmanship for its surface. Internal quite ok, but according to the worker, there are burglary to Amara unit faucet. Thus, they have lock the door for works completed unit. Not so soon to obtain hand over letter. A lot touch up things and facade work nid time to finish it. Might be 2 more months only hand over
*
Burglary at Amara? Faucet taps stolen?

Wah lau wei....
Oaks
post Nov 24 2014, 01:59 AM

Getting Started
**
Junior Member
95 posts

Joined: Sep 2008


QUOTE(jcl86 @ Nov 19 2014, 04:19 PM)
Hi Oaks, i managed to went in too last week. For external wall, reli bad workmanship for its surface. Internal quite ok, but according to the worker, there are burglary to Amara unit faucet. Thus, they have lock the door for works completed unit. Not so soon to obtain hand over letter. A lot touch up things and facade work nid time to finish it. Might be 2 more months only hand over
*
Burglary not our problem until official handover. Not alarming as I could jayfully walked up to the pool area without security presence.

I dont know if this is the right platform to discuss on level of finishes. From the ground. look up n try to spot straightness of the gray fin walls. The green wall and landscape at the "Amara" signage just whistling.gif.

I dont know if anybody has experience on this and maybe talk to the developer to rectify them before handover. Looks like they are bulldozing due to delay. Its madness!
Oaks
post Nov 24 2014, 02:00 AM

Getting Started
**
Junior Member
95 posts

Joined: Sep 2008


QUOTE(kochin @ Nov 19 2014, 04:22 PM)
the later the better.
*
Yup, the later better.
mashimaro1111
post Nov 24 2014, 01:41 PM

Getting Started
**
Junior Member
54 posts

Joined: May 2012
According to FB (close group), somebody called to developer and developer informed that the vp letter has been sent out to owner.
Anybody rcv?
braunbuffel
post Nov 24 2014, 05:32 PM

New Member
*
Junior Member
27 posts

Joined: Jun 2014
i want to let go my unit at block A. Anyone interested pls pm me. TQ
shyhhua
post Nov 24 2014, 05:53 PM

Getting Started
**
Junior Member
265 posts

Joined: Apr 2008


Went to the site on this morning and manage to went up to level 9 from the stairs beside the shoplots. Noticed that at some floors, the corridor are flooded. Some workers are working on the electrical room and some are doing painting works on the internal corridor wall.

Some units are still work in progress, while some units already cleaned and should be able to handover soon. I went in a unit at level 9 (Type H1) which are already cleaned. Noticed that the floor tiles are properly done and the workmanship is quite acceptable (compared to another developer Mx Land project in Damansara area).

Some photos to share from my visit today:
user posted image
Selayang view from level 9

user posted image
Floor tiles

user posted image
LAN port?

user posted image
Switch box

user posted image
Bathroom with shower and water heater point.

user posted image
I do not understand why the waste piping is not hidden? shakehead.gif




TSharrychoo
post Nov 24 2014, 05:59 PM

Look at all my stars!!
*******
Senior Member
3,589 posts

Joined: Mar 2005
From: Bolehland


the paip is ugly
jacob888
post Nov 26 2014, 11:14 AM

On my way
****
Senior Member
649 posts

Joined: Jun 2009
QUOTE(braunbuffel @ Nov 24 2014, 05:32 PM)
i want to let go my unit at block A. Anyone interested pls pm me. TQ
*
size ? How many bed room ?
jacob888
post Nov 26 2014, 11:16 AM

On my way
****
Senior Member
649 posts

Joined: Jun 2009
Did you take the photo on public facilities ?

QUOTE(shyhhua @ Nov 24 2014, 05:53 PM)
Went to the site on this morning and manage to went up to level 9 from the stairs beside the shoplots. Noticed that at some floors, the corridor are flooded. Some workers are working on the electrical room and some are doing painting works on the internal corridor wall.

Some units are still work in progress, while some units already cleaned and should be able to handover soon. I went in a unit at level 9 (Type H1) which are already cleaned. Noticed that the floor tiles are properly done and the workmanship is quite acceptable (compared to another developer Mx Land project in Damansara area).

Some photos to share from my visit today:
user posted image
Selayang view from level 9

user posted image
Floor tiles

user posted image
LAN port?

user posted image
Switch box

user posted image
Bathroom with shower and water heater point.

user posted image
I do not understand why the waste piping is not hidden?  shakehead.gif
*
kochin
post Nov 26 2014, 11:18 AM

I just hope I do!
********
All Stars
10,319 posts

Joined: Dec 2009
From: Malaysia


looks good!
djneo
post Nov 26 2014, 01:15 PM

Getting Started
**
Junior Member
50 posts

Joined: Dec 2013


Wow. Really cut cost huh.. Until toilet piping also exposed until such manner. Wonder what other areas are compromised.....
TSharrychoo
post Nov 26 2014, 01:20 PM

Look at all my stars!!
*******
Senior Member
3,589 posts

Joined: Mar 2005
From: Bolehland


wow, the maintenance fee is 30sen/sqft and sinking fund 3sen/sqft
jcl86
post Nov 26 2014, 01:23 PM

Getting Started
**
Junior Member
106 posts

Joined: Jul 2011
QUOTE(harrychoo @ Nov 26 2014, 01:20 PM)
wow, the maintenance fee is 30sen/sqft and sinking fund 3sen/sqft
*
Did you receive letter?
TSharrychoo
post Nov 26 2014, 01:24 PM

Look at all my stars!!
*******
Senior Member
3,589 posts

Joined: Mar 2005
From: Bolehland


QUOTE(jcl86 @ Nov 26 2014, 01:23 PM)
Did you receive letter?
*
not yet, saw in fb

need to get VP in 14 days
Qssie
post Nov 26 2014, 01:42 PM

New Member
*
Newbie
2 posts

Joined: Sep 2014
QUOTE(harrychoo @ Nov 26 2014, 01:20 PM)
wow, the maintenance fee is 30sen/sqft and sinking fund 3sen/sqft
*
blink.gif So expensive?
djneo
post Nov 26 2014, 02:11 PM

Getting Started
**
Junior Member
50 posts

Joined: Dec 2013


We have been conned lor by developer.... It was supposed to be circa 18 cent psf....
kochin
post Nov 26 2014, 02:15 PM

I just hope I do!
********
All Stars
10,319 posts

Joined: Dec 2009
From: Malaysia


wow. substantial increase in maintenance fee.
total 696 units.

say average size of 900sf.
626,400 sf in total

previous quote = RM0.18psf + sinking = RM0.20psf
present quote = RM0.30psf + sinking = RM0.33psf
difference of RM0.13psf or 65% more than previous quote.

in one month, revenue:
RM0.33psf x 626,400sf = RM206k


one year = almost RM2.5mil

with this huge spike in maintenance charge, probbaly require minimum RM1,500 rental to break even for 1000sf unit.

TSharrychoo
post Nov 26 2014, 02:17 PM

Look at all my stars!!
*******
Senior Member
3,589 posts

Joined: Mar 2005
From: Bolehland


^ and dun forget about the gst on the maintenance fee next year lol
djneo
post Nov 26 2014, 02:49 PM

Getting Started
**
Junior Member
50 posts

Joined: Dec 2013


Buyers started posting issue on maintenance fee already. Screenshots and documentation on official FB page...

Apparently maintenance fee is also stated in the S&P as RM0.18 cents... Please check your S&P if this is true.

shyhhua
post Nov 26 2014, 05:08 PM

Getting Started
**
Junior Member
265 posts

Joined: Apr 2008


QUOTE(jacob888 @ Nov 26 2014, 11:16 AM)
Did you take the photo on public facilities ?
*
nope, coz the path to the facilities area is flooded that time doh.gif